← Back
Elevator cooperative
66-10 YELLOWSTONE BLVD
QUEENS · BIN 4051253
💬 Discuss this project
1958Year Built
6Stories
D4Building Class
R7-1Zoning
62,508 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized20 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 66 10 YELLOWSTONE OWNERS CORP · 19,985 sf lot · 3.13 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY703/22/2026
66 10 YELLOWSTONE OWNERS CORP803/22/2026
YELLOWSTONE OWNERS103/22/2026
RACKLIN MANAGEMENT103/22/2026
RACHLIN MGMT CORP103/22/2026
GOODMAN MANAGEMENT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESMAN INC.101/16/2024
ASHRAF CORP111/23/2023
FLUSHING ENGINEERING SERVICE PC108/09/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAOTIAN & ASSOCIATES INC.103/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CANIDO BASONAS CONST SVCGeneral Contractor603/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE J. XERAKIAS, PE1658105/16/2024
VALERIO ASSOCIATES, P.C.1379101/16/2024
Building Lifecycle
All (77)Filed (4)Permit Issued (5)Signed Off (3)Facade (FISP) (15)Violation (45)Special Inspection (5)
12/02/2025
Violation issued (HPD, open)
A
04/23/2025
Signed off — Alteration
Installation of outriggers and hoists for facade repair and inspection
Q01051946-I1
03/04/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00966855-I1
12/13/2024
Signed off — Alteration
Repair and preventive maintenance of building Facade to include but not limited to, Masonry Replacement, Masonry, Lintel and Stucco repairs and Brick repointing as per plans filed herewith. Nochange in use egress or occupancy.
Q00965981-I1
12/02/2024
Cycle 9 facade report signed — SAFE
11/21/2024
Cycle 9 facade report submitted
11/19/2024
Permit issued — Sidewalk Shed
Q00966855-I1-SH
11/18/2024
Permit issued — General Construction
Q00965981-I1-GC
10/17/2024
Cycle 9 facade inspection completed
05/22/2024
Permit issued — Suspended Scaffold
Q01051946-I1-SC
05/16/2024
Filed — Alteration
Installation of outriggers and hoists for facade repair and inspection
Q01051946-I1
05/15/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
05/15/2024
Special inspection requirement — Post-installed Anchors
George Xerakias
02/22/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/22/2024
Permit issued — General Construction
Q00965981-I1-GC
01/16/2024
Filed — Alteration
Repair and preventive maintenance of building Facade to include but not limited to, Masonry Replacement, Masonry, Lintel and Stucco repairs and Brick repointing as per plans filed herewith. Nochange in use egress or occupancy.
Q00965981-I1
11/24/2023
Permit issued — Sidewalk Shed
Q00966855-I1-SH
11/23/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00966855-I1
11/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
JOHN VALERIO
11/21/2023
Special inspection requirement — Masonry
JOHN VALERIO
11/21/2023
Special inspection requirement — Final
THOMAS J. BASILE
01/12/2023
Violation issued (ECB, closed)
Plumbing
08/09/2022
Filed — Alteration
FILED HEREWITH PLUMBING WORK ON 5TH FLOOR UNIT 5F, REPLACEMENT OF BATHROOM FIXTURES, NO DISTURBANCE OF EXISTING PARTITIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q00789445-I1
02/18/2019
Cycle 8 facade report submitted
02/18/2019
Cycle 8 facade inspection completed
02/12/2019
Cycle 8 facade report signed — SWARMP
10/11/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/07/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/29/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2014
Cycle 7 facade report submitted
07/02/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/23/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/19/2011
Violation issued (HPD, open)
B
11/19/2011
Violation issued (HPD, open)
A
11/19/2011
Violation issued (HPD, open)
B
11/19/2011
Violation issued (HPD, open)
B
11/17/2011
Violation issued (HPD, open)
B
11/17/2011
Violation issued (HPD, open)
B
11/17/2011
Violation issued (HPD, open)
B
11/17/2011
Violation issued (HPD, open)
B
09/14/2011
Violation issued (HPD, open)
C
09/14/2011
Violation issued (HPD, open)
C
09/14/2011
Violation issued (HPD, open)
B
09/14/2011
Violation issued (HPD, open)
B
09/14/2011
Violation issued (HPD, open)
B
09/14/2011
Violation issued (HPD, open)
B
01/13/2011
Cycle 7 facade report submitted
01/13/2011
Cycle 6 facade report submitted
12/22/2010
Cycle 7 facade report signed — SAFE
12/22/2010
Cycle 7 facade report signed — SWARMP
12/22/2010
Cycle 6 facade report signed — SWARMP
12/20/2010
Violation issued (HPD, open)
B
12/20/2010
Violation issued (HPD, open)
B
12/20/2010
Violation issued (HPD, open)
B
12/20/2010
Violation issued (HPD, open)
B
11/22/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/29/2010
Cycle 7 facade inspection completed
10/29/2010
Cycle 7 facade inspection completed
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC11/19/2024
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC11/18/2024
DOB NOWSuspended ScaffoldSigned-offCANIDO BASONAS CONST. COR05/22/2024
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC01/22/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC11/24/2023
BISFBISSUEDTOTAL BOILER CARE INC04/10/2014
BISPLISSUEDCC CONTROLLED PLBG CO INC04/10/2014
BISOTISSUEDCANIDO BASONAS CONSTRUCTI04/04/2014
BISOTISSUEDBASONAS CONSTRUCTION CORP01/13/2012
BISOTISSUEDBASONAS CONSTRUCTION CORP11/18/2011
BISEQISSUEDEVEREST SCAFFOLDING INC09/28/2011
1 project · most recent 08/09/2022
Water/Sanitary
FiledStatusContractorScope
08/09/2022——Water/Sanitary
7 projects · most recent 11/05/2025
General Wiring
FiledStatusContractorScope
11/05/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
06/21/2024Permit IssuedDVM ELECTRICAL SERVICES LGeneral Wiring
11/23/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
05/29/2023CompleteRJ RUSSO ELECTRIC CO.General Wiring
11/08/2022CompleteRJ RUSSO ELECTRIC CO.General Wiring
01/07/2019Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
04/18/2018Permit IssuedRUSSO ELECTRIC INC.—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/15/2024Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
05/15/2024Post-installed AnchorsGeorge Xerakiasspecial
11/21/2023Tenant Protection Plan ComplianceJOHN VALERIOspecial
11/21/2023MasonryJOHN VALERIOspecial
11/21/2023FinalTHOMAS J. BASILEprogress
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/26/2026Q00789445-I1Request digital key ↗
08/26/2026Q00789445-P1Request digital key ↗
08/23/2026Q00966855-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
04/14/2014420917538Open ↗
04/14/2014420917538Open ↗
04/10/2014420506394Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/12/2014420917538Open ↗
04/14/2014420917538Open ↗
11/22/2011420506394Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications23
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/14/2014420917538Open ↗
03/26/2014420506394Open ↗
05/04/2012420487271Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
11/22/2011420506394Open ↗
11/22/2011420506394Open ↗
11/22/2011420506394Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026Q00965981-I1Open ↗
08/27/2026Q00965981-I1Open ↗
08/22/2026Q01051946-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00789445-P1Open ↗
08/26/2026Q00789445-I1Open ↗
08/13/2026Q00965981-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/14/2014420917538Open ↗
11/22/2011420506394Open ↗
09/30/2011420487271Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/14/2014420917538Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026Q00965981-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
08/12/2014420917538Open ↗
04/14/2014420917538Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
12/26/2014420917538Open ↗
10/14/2014420917538Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/12/2014420917538Open ↗
04/14/2014420917538Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
10/15/2014420917538Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
11/22/2011420506394Open ↗
04/14/2014420917538Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/22/2011420506394Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00965981-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/26/2014420506394Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/26/2014420506394Open ↗
▸BISTECHNICAL REPORT: ENERGY1
11/29/2011420506394Open ↗
▸Approvals, Objections & Sign-offs9
▸BISADMINISTRATIVE OBJECTIONS3
04/14/2014420917538Open ↗
11/22/2011420506394Open ↗
09/30/2011420487271Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/18/2014420917538Open ↗
04/14/2014420506394Open ↗
04/10/2014420506394Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/14/2014420506394Open ↗
05/04/2012420487271Open ↗
12/18/2014420917538Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/23/2014420917538Open ↗
04/14/2014420917538Open ↗
03/26/2014420506394Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET3
04/14/2014420917538Open ↗
11/22/2011420506394Open ↗
09/30/2011420487271Open ↗
▸BISADDITIONAL INFORMATION1
08/12/2014420917538Open ↗
▸Other Documents5
▸BISGAS WELDER ANNUAL CERT : GAS-WELD3
10/14/2014420917538Open ↗
10/14/2014420917538Open ↗
10/14/2014420917538Open ↗
▸DOB NOWCalculations1
08/13/2026Q01051946-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01051946-I1Open ↗