← Back
Predominantly retail with other uses
66-14 FRESH POND ROAD
QUEENS · Ridgewood · BIN 4443091
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R6BZoning
2,883 sfGross Floor Area
3Units
Predominantly retail with other uses · Owner of record: 66-14 FRESH POND ROAD LLC · 1,998 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Floor 14p · 1 filing · 2 docs
Site & exterior3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRINCE CONSTRUCTION607/08/2026
RELIABLE ENTERPRISES407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC301/27/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRANK PUGLIESEElectrical103/21/2026
PUGLIESE FRANKElectrical103/21/2026
PRINCE CONSTRUCTION INCGeneral Contractor107/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247201/27/2022
Building Lifecycle
All (10)Filed (3)Permit Issued (2)Signed Off (1)Special Inspection (4)
02/01/2022
Signed off — Alteration
FACADE REPAIR, POINTING, BRICK REPLACEMENT, INSTALLATION OF STUCCO, & REPLACE LINTELS AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00601800-I1
01/27/2022
Filed — Alteration
FACADE REPAIR, POINTING, BRICK REPLACEMENT, INSTALLATION OF STUCCO, & REPLACE LINTELS AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00601800-P1
11/17/2021
Special inspection requirement — Masonry
Sunil Saigal
11/17/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
11/17/2021
Special inspection requirement — Energy Code Compliance Inspections
Sunil Saigal
11/17/2021
Special inspection requirement — Final
Sunil Saigal
10/27/2021
Permit issued — General Construction
Q00601800-I1-GC
10/22/2021
Filed — Alteration
FACADE REPAIR, POINTING, BRICK REPLACEMENT, INSTALLATION OF STUCCO, & REPLACE LINTELS AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q00601800-I1
10/18/2021
Permit issued — Sidewalk Shed
Q00612071-I1-SH
10/14/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00612071-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPRINCE CONSTRUCTION INC10/27/2021
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC10/18/2021
BISPLISSUEDR.J. WELLBROCK INC01/25/2018
BISEQISSUEDROBART CONSTRUCTION CORP01/16/2018
BISOTISSUEDROBART CONSTRUCTION CORP01/16/2018
BISPLISSUEDCLASSIC P & H DESIGN CORP.01/26/1995
BISOTISSUEDROBART CONST. INC.10/18/1994
3 projects · most recent 10/15/2021
General Wiring
FiledStatusContractorScope
10/15/2021CompleteRICHARD NEU—
09/24/2021CompleteWILLDAN ELECTRICAL OF NY—
01/22/2018CompleteMUNETZ ELEC'L CONTRG CORPGeneral Wiring
1 project · most recent 10/14/2021
Sidewalk Shed
FiledStatusContractorScope
10/14/2021Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/17/2021MasonrySunil Saigalspecial
11/17/2021Structural Stability – Alterations of existing buildingsSunil Saigalspecial
11/17/2021Energy Code Compliance InspectionsSunil Saigalprogress
11/17/2021FinalSunil Saigalprogress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00612071-I1Request digital key ↗
08/26/2026Q00601800-I1Request digital key ↗
08/26/2026Q00601800-P1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
01/26/2018421481060Open ↗
01/17/2018421481060Open ↗
01/17/2018421481060Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/16/2017421481060Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00612071-I1Open ↗
08/26/2026Q00601800-I1Open ↗
08/26/2026Q00601800-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/17/2018421481060Open ↗
05/16/2017421481060Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00601800-P1Open ↗
09/01/2026Q00601800-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00601800-P1Open ↗
09/01/2026Q00601800-P1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/16/2017421481060Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/16/2017421481060Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026Q00601800-P1Open ↗
08/26/2026Q00601800-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/16/2017421481060Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/17/2018421481060Open ↗
05/16/2017421481060Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/16/2017421481060Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/16/2017421481060Open ↗