← Back
BuildNYC
Two family brick
66-15 CLINTON AVENUE
QUEENS · Maspeth · BIN 4625343
💬 Discuss this project
2024Year Built
3Stories
B1Building Class
R4-1Zoning
1,611 sfGross Floor Area
2Units
0 Active Violations
Two family brick · Owner of record: 661517 Queens · 2,500 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew 3-story BuildingUnder Construction4p · 1 filing · 20 docs
Floor 3New 3-story BuildingUnder Construction15p · 1 filing · 20 docs
Floor 2New 3-story BuildingUnder Construction12p · 1 filing · 20 docs
Floor 1New 3-story BuildingUnder Construction39p · 1 filing · 20 docs
CellarNew 3-story BuildingUnder Construction17p · 1 filing · 20 docs
Site & exteriorNew 3-story BuildingUnder Construction37p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
661517 Queens3407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ameriland Brook902/05/2026
Brian Ill Development206/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Safety Pro ConstructionGeneral Contractor607/08/2026
Safety Pro ConstructionScaffold207/08/2026
HP ServicesPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ameriland Brook1506902/05/2026
Building Lifecycle
06/08/2026
Permit issued — Curb Cut
Q00858356-S3-CC
05/05/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/11/2026
Signed off — New Building
PROPOSE A NEW THREE STORY TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q00858356-S2
04/11/2026
Signed off — New Building
PROPOSE A NEW THREE STORY TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q00858356-S1
03/04/2026
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
Q00858356-I1-GC-CX
66 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedSafety Pro Construction06/08/2026
DOB NOWEarth WorkSigned-offSafety Pro Construction06/11/2025
DOB NOWPlumbingSigned-offHP Services04/21/2025
DOB NOWStructuralPermit IssuedSafety Pro Construction03/04/2025
DOB NOWConstruction FenceSigned-offSafety Pro Construction09/23/2024
DOB NOWPlumbingSigned-offHP Services04/23/2024
DOB NOWStructuralPermit IssuedSafety Pro Construction03/06/2024
DOB NOWConstruction FenceSigned-offSafety Pro Construction05/09/2023
1 project · most recent 02/05/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
02/05/2026Signed-offHP ServicesGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024CompleteAL-Lectric Elect'l ContractingGeneral Wiring
1 project · most recent 02/05/2026
Steel Concrete Masonry
FiledStatusContractorScope
02/05/2026Permit IssuedSafety Pro ConstructionSteel, Concrete, Masonry
1 project · most recent 02/05/2026
Fence
FiledStatusContractorScope
02/05/2026Permit IssuedSafety Pro ConstructionFence
1 project · most recent 02/05/2026
Earthwork
FiledStatusContractorScope
02/05/2026Permit IssuedSafety Pro ConstructionEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/05/2026Fail-Final CND-Occupancy InspectionFailView ↗
09/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/26/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
02/23/2026Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
02/23/2026Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
02/23/2026Subgrade InspectionsXIAOHONG ZHAOspecial
02/23/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
02/23/2026Structural Steel - DetailsXIAOHONG ZHAOspecial
02/23/2026Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
02/23/2026Structural Steel - WeldingXIAOHONG ZHAOspecial
02/23/2026Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
02/23/2026Heating SystemsXIAOHONG ZHAOspecial
02/23/2026MasonryXIAOHONG ZHAOspecial
02/23/2026Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
02/23/2026Mechanical SystemsXIAOHONG ZHAOspecial
02/23/2026FinalBRIAN ILLprogress
02/23/2026Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
02/23/2026Footing and FoundationXIAOHONG ZHAOprogress
02/23/2026Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
02/23/2026Fenestration areasXIAOHONG ZHAOenergy_progress
02/23/2026Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
02/23/2026HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
02/23/2026HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
02/23/2026Fenestration air leakageXIAOHONG ZHAOenergy_progress
02/23/2026MeteringXIAOHONG ZHAOenergy_progress
02/23/2026Maintenance informationXIAOHONG ZHAOenergy_progress
02/23/2026Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
02/23/2026Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
Latest 25 of 114.
102 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account