← Back
Health center, child center, clinic
66-20 QUEENS BOULEVARD
QUEENS · BIN 4056084
💬 Discuss this project
1949Year Built
1Stories
I5Building Class
R7XZoning
12,000 sfGross Floor Area
1Units
0 Open Violations
Health center, child center, clinic · 14,500 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 4 docs
Cellar1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.101/20/2025
GASBARRO STRUCTURAL ENGINEERING105/15/2023
LAFAZIA ARCHITECTURE105/10/2023
NORMAN C. LOK, PE311/08/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR603/21/2026
JENNY FLORES EXPEDITING203/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEPLIN CONSTRUCTION CORP.General Contractor403/21/2026
MVS HEATING & AIR CONDITGeneral Contractor303/21/2026
CITY SIGNSScaffold307/08/2026
DEYI LINGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738101/20/2025
W. ALLEN ENGINEERING PLLC664205/15/2023
Building Lifecycle
All (24)Filed (6)Permit Issued (6)Signed Off (6)Violation (3)Special Inspection (3)
01/27/2025
Signed off — Alteration
DIRECT REPLACEMENT OF (1) 15-TON HVAC SINGLE PACKAGE UNIT ONTO EXISTING STEEL DUNNAGE
Q01160269-I1
01/23/2025
Permit issued — Mechanical Systems
Q01160269-I1-MS
01/20/2025
Filed — Alteration
DIRECT REPLACEMENT OF (1) 15-TON HVAC SINGLE PACKAGE UNIT ONTO EXISTING STEEL DUNNAGE
Q01160269-I1
09/13/2024
Signed off — Alteration
Q00823078-I1
09/05/2024
Signed off — Alteration
Q00823075-I1
10/05/2023
Permit issued — Structural
Q00823078-I1-ST
10/03/2023
Permit issued — General Construction
Q00823075-I1-GC
05/15/2023
Filed — Alteration
Q00823078-I1
05/10/2023
Filed — Alteration
Q00823075-I1
02/02/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
WAYNE ALLEN
02/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
WAYNE ALLEN
02/02/2023
Special inspection requirement — Final
Anthony LaFazia
07/10/2018
Signed off — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY SIGN - INSIDE PROPERTY LINE. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00001046-I1
07/10/2018
Signed off — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00001025-I1
07/10/2018
Signed off — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00001038-I1
11/14/2017
Permit issued — Sign
Q00001038-I1-SG
11/08/2017
Filed — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY SIGN - INSIDE PROPERTY LINE. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00001046-I1
11/08/2017
Filed — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00001025-I1
11/08/2017
Filed — Alteration
NON ILLUMINATED NON ADVERTISING ACCESSORY SIGN. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00001038-I1
11/08/2017
Permit issued — Sign
Q00001046-I1-SG
11/08/2017
Permit issued — Sign
Q00001025-I1-SG
05/15/2015
Violation issued (ECB, closed)
Unknown
02/15/2000
Violation issued (ECB, closed)
Construction
03/16/1994
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT01/23/2025
DOB NOWStructuralSigned-offSTEPLIN CONSTRUCTION CORP10/05/2023
DOB NOWGeneral ConstructionSigned-offSTEPLIN CONSTRUCTION CORP10/03/2023
DOB NOWSignSigned-offELMER DAWSON11/14/2017
DOB NOWSignSigned-offELMER DAWSON11/08/2017
DOB NOWSignSigned-offELMER DAWSON11/08/2017
BISMHISSUEDACTIVE AIR SYSTEMS INC11/04/2016
BISOTRE-ISSUEDG.N. CONSTRUCTION INC07/24/2015
BISMHISSUEDACTIVE AIR SYSTEMS INC06/16/2015
BISPLISSUEDCOCHRANE PLBG & HTG06/16/2015
BISOTISSUEDACTIVE AIR SYSTEMS INC11/05/2007
BISMHISSUEDACTIVE AIR SYSTEMS INC10/11/2007
BISPLISSUEDR&A HEATING & CONTRG CO.I07/03/2000
BIS—ISSUEDABR CONSTRUCTION, INC.06/09/2000
BISOTISSUEDABR CONST INC06/30/1999
BISPLISSUEDR&A HEATING & CONTRG CO.I06/08/1999
BISPLISSUEDR&A HEATING & CONTRG CO.I06/08/1999
BISSPISSUEDMAYDAY PLUMBING & HEATING INC05/24/1999
BISPLISSUEDR&A HEATING & CONTRG CO.I10/19/1998
BISOTISSUEDABR CONST INC06/19/1998
BISOTISSUEDABR CONST INC04/22/1998
BISOTISSUEDSPACE AIR CONDITIONING CORP02/22/1995
BIS—ISSUEDIESSCO GENL. CONTRACTING12/04/1992
1 project · most recent 01/22/2019
HVAC Wiring
FiledStatusContractorScope
01/22/2019CompleteSTELLMANN ELECTRICAL CORPHVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
02/02/2023Construction Operations Influencing Adjacent StructuresWAYNE ALLENspecial
02/02/2023Structural Stability – Alterations of existing buildingsWAYNE ALLENspecial
02/02/2023FinalAnthony LaFaziaprogress
▾Documents — 129 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/29/2026Q00001038-I1Request digital key ↗
08/29/2026Q00001025-I1Request digital key ↗
08/29/2026Q00001046-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION10
11/30/2018440513115Open ↗
11/30/2018440513115Open ↗
11/09/2016421354796Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
11/30/2018440513115Open ↗
08/08/2016421354796Open ↗
07/23/2015440237646Open ↗
Showing 3 of 7 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
11/05/2015440237646Open ↗
▸Seals & Professional Certifications34
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
08/08/2016421354796Open ↗
08/08/2016421354796Open ↗
11/05/2015440237646Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026Q00001046-I1Open ↗
08/24/2026Q00823078-I1Open ↗
08/13/2026Q00823075-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/08/2016421354796Open ↗
10/30/2007410002937Open ↗
10/09/2007410013630Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
11/30/2018440513115Open ↗
08/08/2016421354796Open ↗
07/23/2015440237646Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/30/2018440513115Open ↗
07/23/2015440237646Open ↗
06/15/2015440214028Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/30/2018440513115Open ↗
07/23/2015440237646Open ↗
06/15/2015440214028Open ↗
▸BISPC FULL REPORT2
10/09/2007410013630Open ↗
09/14/2007410002937Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/09/2007410013630Open ↗
09/14/2007410002937Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q00823075-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q00823075-I1Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING4
11/30/2018440513115Open ↗
06/15/2015440214028Open ↗
07/24/2008410013630Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS4
04/30/2009410013630Open ↗
04/30/2009410013630Open ↗
04/30/2009410013630Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
08/01/2008410013630Open ↗
12/10/2007410002937Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/30/2009410013630Open ↗
07/28/2008410002937Open ↗
▸Environmental & Asbestos26
▸DOB NOWOER: Notice of Satisfaction6
08/29/2026Q00001046-I1Open ↗
08/13/2026Q01160269-I1Open ↗
08/13/2026Q00823078-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/29/2026Q00001046-I1Open ↗
08/13/2026Q00001038-I1Open ↗
08/13/2026Q01160269-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026Q00001046-I1Open ↗
08/24/2026Q00823078-I1Open ↗
08/13/2026Q00001038-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED4
11/30/2018440513115Open ↗
10/21/2016421354796Open ↗
07/23/2015440237646Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/30/2018440513115Open ↗
08/08/2016421354796Open ↗
07/23/2015440237646Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
10/09/2007410013630Open ↗
09/14/2007410002937Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/30/2018440513115Open ↗
07/23/2015440237646Open ↗
06/15/2015440214028Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/08/2016421354796Open ↗
08/08/2016421354796Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/30/2018440513115Open ↗
06/15/2015440214028Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/05/2015440237646Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/30/2018440513115Open ↗
07/23/2015440237646Open ↗
06/15/2015440214028Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/05/2015440237646Open ↗
04/30/2009410013630Open ↗
07/28/2008410002937Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
10/29/2007410002937Open ↗
10/09/2007410013630Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/30/2009410013630Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
11/30/2018440513115Open ↗
08/08/2016421354796Open ↗
11/05/2015440237646Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET3
11/30/2018440513115Open ↗
07/23/2015440237646Open ↗
06/15/2015440214028Open ↗
▸BISEFILING COVER SHEET1
08/08/2016421354796Open ↗
▸Other Documents1
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
01/26/2019440513115Open ↗