← Back
BuildNYC
Large suburban residence
66-26 MARATHON PARKWAY
QUEENS · BIN 4173167
💬 Discuss this project
1950Year Built
2.25Stories
A3Building Class
R2AZoning
3,540 sfGross Floor Area
1Units
Large suburban residence · 7,038 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 27p · 1 filing · 11 docs
Floor 1Curb cut installation2p · 2 filings · 4 docs
Cellar1p · 1 filing · 11 docs
Site & exterior7p · 2 filings · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/21/2023$2.0M—6626 GROUP INC. → Private party$561/sf building
11/30/2020$860K—Private party → Private party$243/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E.509/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ibuild Consulting1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jin Sun ConstructionScaffold603/21/2026
Jin Sun ConstructionGeneral Contractor407/08/2026
Wasoff Plumbing & UtilityPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mehdi Ghazi, P.E.7129209/30/2022
Building Lifecycle
01/25/2023
Permit issued — Curb Cut
Q00416579-I1-CC
12/06/2022
Signed off — Alteration
INSTALLATION OF CURB CUT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00416587-I1
12/06/2022
Signed off — Alteration
Q00416579-I1
12/05/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/05/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutPermit IssuedJin L. Lin01/25/2023
DOB NOWCurb CutSigned-offJin L. Lin11/14/2022
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility09/09/2022
DOB NOWConstruction FenceSigned-offJin L. Lin05/09/2022
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility12/09/2021
DOB NOWConstruction FenceSigned-offJin L. Lin05/26/2021
BIS—ISSUEDJin Sun Construction05/10/2022
1 project · most recent 04/26/2022
General Wiring
FiledStatusContractorScope
04/26/2022CompleteRightway ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/05/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
05/06/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/06/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/03/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
10/03/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMEHDI GHAZIspecial
10/03/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
10/03/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
10/03/2022HVAC and service water heating equipment MEHDI GHAZIenergy_progress
10/03/2022HVAC insulation and sealing MEHDI GHAZIenergy_progress
10/03/2022HVAC and service water heating system controls MEHDI GHAZIenergy_progress
102 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account