← Back
Two stories - detached, small or mid-size
66-35 79 STREET
QUEENS · Middle Village · BIN 4071840
💬 Discuss this project
1905Year Built
2Stories
A1Building Class
R4AZoning
3,727 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 7,500 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionCivil
Floor 31p · 1 filing · 12 docs
Floor 212p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DMA CONTRACTING303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/26/2021$1.2M—— → —$325/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK J QUATELA ARCHITECT P.C1008/03/2026
NY BUILDING ASSOCIATES INC112/23/2025
N/A304/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Manetta architecture design pllc1803/21/2026
FIRE BUILDING CODE SERVICES603/21/2026
S R SOLAR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DMA CONTRACTING INCGeneral Contractor2807/08/2026
CN PLUMBING INCFire Protection207/08/2026
BRANDL ELECTRIC INC.Electrical103/22/2026
NAPSTAR ELECTRIC INCElectrical103/22/2026
FOTIOS MARTOGeneral Contractor104/09/2026
ARK-POL PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEO Y LEE ASSOCIATES24811008/03/2026
NKM ENGINEERING PLLC6244112/23/2025
CITY-WIDE TESTING INC416310/06/2023
FIRE AND BUILDING CODE SE2128304/12/2023
Building Lifecycle
All (104)Filed (14)Permit Issued (19)Signed Off (5)Violation (3)Inspection (11)Objection (22)Special Inspection (30)
09/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Leo Lee
09/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Leo Lee
09/09/2026
Special inspection requirement — Fenestration air leakage
Leo Lee
09/09/2026
Special inspection requirement — Protection of exposed foundation insulation
Leo Lee
09/09/2026
Special inspection requirement — Maintenance information
Leo Lee
09/09/2026
Special inspection requirement — Air barrier - visual inspection
Leo Lee
09/09/2026
Special inspection requirement — Permanent certificate
Leo Lee
09/09/2026
Special inspection requirement — Metering
Leo Lee
09/09/2026
Special inspection requirement — Insulation placement and R values
Leo Lee
09/09/2026
Special inspection requirement — Fenestration areas
Leo Lee
09/09/2026
Special inspection requirement — Interior lighting power
Leo Lee
08/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR INCLUDING CONCRETE FOOTINGS,FOUNDATIONS, FRAMING, DOORS, WINDOWS, CABINETRY AND FINISHES AND REAR PATIO WITH POOL.
Q00550667-P5
08/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Leo Lee
08/03/2026
Special inspection requirement — Final
Leo Lee
08/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Leo Lee
08/03/2026
Special inspection requirement — Structural Steel - Details
Leo Lee
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Leo Lee
08/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Leo Lee
08/03/2026
Special inspection requirement — Fenestration areas
Leo Lee
08/03/2026
Special inspection requirement — Chimneys and vents
Leo Lee
08/03/2026
Special inspection requirement — Concrete - Cast-In-Place
Leo Lee
08/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Leo Lee
08/03/2026
Special inspection requirement — Footing and Foundation
Leo Lee
08/03/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Leo Lee
08/03/2026
Special inspection requirement — Preliminary
Leo Lee
08/03/2026
Special inspection requirement — Masonry
Leo Lee
08/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
08/03/2026
Special inspection requirement — Fenestration air leakage
Leo Lee
08/03/2026
Special inspection requirement — Subgrade Inspections
Leo Lee
08/03/2026
Special inspection requirement — Wood – Prefabricated I-Joists
Leo Lee
08/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Leo Lee
02/26/2026
Signed off — Alteration
Q01325281-I1
01/08/2026
Permit issued — Solar
Q01325281-I1-SL
12/23/2025
Filed — Alteration
Q01325281-I1
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2025
Permit issued — Foundation
Q00550667-I1-GC
11/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/23/2024
Permit issued — General Construction
Q00550667-I1-GC
09/27/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR INCLUDING CONCRETE FOOTINGS,FOUNDATIONS, FRAMING, DOORS, WINDOWS, CABINETRY AND FINISHES AND REAR PATIO WITH POOL.
Q00550667-P4
07/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/27/2023
Signed off — Alteration
NEW 10'-0" (INCLUDING SPLAYS) CURB CUT IN CONJUNCTION WITH NEW BUILDING ALTERATION Q00550667
Q00563396-I1
12/26/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/12/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
NEW VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR INCLUDING CONCRETE FOOTINGS,FOUNDATIONS, FRAMING, DOORS, WINDOWS, CABINETRY AND FINISHES AND REAR PATIO WITH POOL.
Q00550667-S1
12/12/2023
Signed off — Alteration
FILING FENCE IN CONJUNCTION WITH ALT 1 Q00550667
Q00551492-I1
12/01/2023
Permit issued — Earth Work
Q00550667-I1-GC
11/21/2023
Signed off — Alteration
Installation of Sprinkler System
Q00577851-I1
10/20/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR INCLUDING CONCRETE FOOTINGS,FOUNDATIONS, FRAMING, DOORS, WINDOWS, CABINETRY AND FINISHES AND REAR PATIO WITH POOL.
Q00550667-P3
10/18/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/13/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/06/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION ON CELLAR FIRST AND SECOND FLOOR INCLUDING CONCRETE FOOTINGS,FOUNDATIONS, FRAMING, DOORS, WINDOWS, CABINETRY AND FINISHES AND REAR PATIO WITH POOL.
Q00550667-P2
09/05/2023
Permit issued — Sprinklers
Q00577851-I1-EW-SP
08/11/2023
Permit issued — Curb Cut
Q00563396-I1-CC
04/12/2023
Filed — Alteration
Installation of Sprinkler System
Q00577851-P2
11/28/2022
Permit issued — Foundation
Q00550667-I1-EA
11/28/2022
Permit issued — General Construction
Q00550667-I1-FO
11/22/2022
Permit issued — General Construction
Q00550667-I1-GC
11/07/2022
Permit issued — Sprinklers
Q00577851-I1-EW-SP
11/01/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/01/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/13/2022
Filed — Alteration
Installation of Sprinkler System
Q00577851-P1
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offFOTIOS MARTO01/08/2026
DOB NOWFoundationPermit IssuedDMA CONTRACTING INC11/13/2025
DOB NOWGeneral ConstructionPermit IssuedDMA CONTRACTING INC10/23/2024
DOB NOWEarth WorkPermit IssuedDMA CONTRACTING INC12/01/2023
DOB NOWSprinklersSigned-offCN PLUMBING INC09/05/2023
DOB NOWCurb CutSigned-offDMA CONTRACTING INC08/11/2023
DOB NOWFoundationSigned-offDMA CONTRACTING INC11/28/2022
DOB NOWGeneral ConstructionSigned-offDMA CONTRACTING INC11/28/2022
DOB NOWGeneral ConstructionPermit IssuedDMA CONTRACTING INC11/22/2022
DOB NOWSprinklersSigned-offCN PLUMBING INC11/07/2022
DOB NOWConstruction FenceSigned-offDMA CONTRACTING INC08/12/2022
DOB NOWPlumbingSigned-offARK-POL PLUMBING CORP05/06/2022
DOB NOWEarth WorkSigned-offDMA CONTRACTING INC03/03/2022
DOB NOWFoundationPermit IssuedDMA CONTRACTING INC03/03/2022
DOB NOWGeneral ConstructionSigned-offDMA CONTRACTING INC03/03/2022
DOB NOWFoundationSigned-offDMA CONTRACTING INC10/15/2021
DOB NOWGeneral ConstructionPermit IssuedDMA CONTRACTING INC10/15/2021
DOB NOWEarth WorkSigned-offDMA CONTRACTING INC10/15/2021
DOB NOWConstruction FenceSigned-offDMA CONTRACTING INC08/23/2021
1 project · most recent 08/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Signed-offARK-POL PLUMBING CORPGas, Storm, Water/Sanitary
2 projects · most recent 02/05/2026
General Wiring
FiledStatusContractorScope
02/05/2026CompleteBRANDL ELECTRIC INC.1 meters, 1 new_meters
03/11/2025CompleteNAPSTAR ELECTRIC INCGeneral Wiring
1 project · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026Permit IssuedDMA CONTRACTING INC3 scope_items
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/26/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
10/18/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/13/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/01/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/31/2022Pass-Final House ConnectionPassView ↗
05/23/2022Fail-Final House ConnectionFailView ↗
05/18/2022Fail-Final House ConnectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
09/09/2026HVAC-R and service water piping design and insulationLeo Leeenergy_progress
09/09/2026Fenestration air leakageLeo Leeenergy_progress
09/09/2026Insulation placement and R valuesLeo Leeenergy_progress
09/09/2026Protection of exposed foundation insulationLeo Leeenergy_progress
09/09/2026Interior lighting powerLeo Leeenergy_progress
09/09/2026Permanent certificateLeo Leeenergy_progress
09/09/2026MeteringLeo Leeenergy_progress
09/09/2026Maintenance informationLeo Leeenergy_progress
09/09/2026Fenestration and door U-factor and product ratingsLeo Leeenergy_progress
09/09/2026Fenestration areasLeo Leeenergy_progress
09/09/2026Air barrier - visual inspectionLeo Leeenergy_progress
08/03/2026FinalLeo Leeprogress
08/03/2026Chimneys and ventsLeo Leespecial
08/03/2026Concrete - Cast-In-PlaceLeo Leespecial
08/03/2026Excavations - Sheeting, Shoring, and BracingLeo Leespecial
08/03/2026Fire-Resistant Penetrations and JointsLeo Leespecial
08/03/2026MasonryLeo Leespecial
08/03/2026Structural Stability – Alterations of existing buildingsLeo Leespecial
08/03/2026Structural Steel - DetailsLeo Leespecial
08/03/2026Structural Steel - High Strength BoltingLeo Leespecial
08/03/2026Subgrade InspectionsLeo Leespecial
08/03/2026Subsurface Investigations (Borings/Test Pits)Leo Leespecial
08/03/2026Wood – Prefabricated I-JoistsLeo Leespecial
08/03/2026Energy Code Compliance InspectionsLeo Leeprogress
08/03/2026Fire-Resistance Rated ConstructionLeo Leeprogress
Latest 25 of 89.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026Q00563396-P2Request digital key ↗
08/27/2026Q00563396-I1Request digital key ↗
08/25/2026Q00577851-P2Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation2
09/08/2021440681736Open ↗
07/20/2021440681736Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/20/2021440681736Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
05/01/2025440681736Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026Q00550667-P5Open ↗
08/13/2026Q00550667-P3Open ↗
08/13/2026Q00550667-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00550667-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/24/2026Q00550667-P5Open ↗
▸Seals & Professional Certifications50
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026Q00550667-I1Open ↗
09/01/2026Q00550667-I1Open ↗
09/01/2026Q00577851-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026Q00551492-I1Open ↗
08/27/2026Q00563396-I1Open ↗
08/27/2026Q00563396-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/21/2026Q00550667-I1Open ↗
09/21/2026Q00550667-I1Open ↗
09/01/2026Q00550667-I1Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/20/2021440681736Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/20/2021440681736Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/24/2026Q00550667-P5Open ↗
08/13/2026Q00550667-P3Open ↗
08/13/2026Q00550667-P4Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
09/08/2021440681736Open ↗
▸BISSTREET TREE SIGNOFF1
04/03/2025440681736Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00550667-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026Q00550667-I1Open ↗
08/24/2026Q00550667-S1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/18/2026Q01325281-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00550667-S1Open ↗
08/13/2026Q00550667-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/24/2026Q00550667-P5Open ↗
08/13/2026Q00550667-I1Open ↗
08/13/2026Q00550667-P4Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: FIELD INSPECTION1
05/01/2025440681736Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00550667-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00550667-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/01/2025440681736Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01325281-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
05/01/2025440681736Open ↗
▸Filing & Intake Forms2
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/20/2021440681736Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/20/2021440681736Open ↗
▸Other Documents14
▸DOB NOWSite Survey: Initial4
08/24/2026Q00550667-P5Open ↗
08/13/2026Q00550667-P3Open ↗
08/13/2026Q00550667-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/24/2026Q00550667-P5Open ↗
08/13/2026Q00550667-P4Open ↗
08/13/2026Q00550667-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
05/01/2025440681736Open ↗
07/20/2021440681736Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
05/01/2025440681736Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
05/01/2025440681736Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00550667-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00550667-I1Open ↗