← Back
Elevator cooperative
Ruskin Apartments
66-38 YELLOWSTONE BLVD · BIN 4432094
💬 Discuss this project
1950Year Built
6Stories
D4Building Class
R7-1Zoning
222,030 sfGross Floor Area
246Units
LL97 CoveredRent Stabilized59 Open Violations 58 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: QUALITY & RUSKIN APTS CORP · 78,129 sf lot · 2.84 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUALITY & RUSKIN APTS CORP1303/22/2026
QUALITY-RUSKIN HOUSING UN1103/22/2026
ARGO203/22/2026
HICKEY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HARRIS ARCHITECTURE & DESIGN604/07/2023
INSITE DESIGN STUDIO102/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEKKERMAN, MIKHAILElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
LIBERTY CONSTRUCTION & REGeneral Contractor107/08/2026
WASSERMAN-TRIEFLER P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189102/03/2022
Building Lifecycle
All (74)Filed (7)Permit Issued (2)Signed Off (1)Facade (FISP) (14)Violation (40)Inspection (3)Special Inspection (7)
06/03/2024
Cycle 9 facade report signed — SWARMP
02/20/2024
Cycle 9 facade report submitted
02/14/2024
Cycle 9 facade inspection completed
04/17/2023
Signed off — Alteration
Replacement of FOUR (4) Existing Flexible Non-Metallic Gas Hose Connections to FOUR (4) Laundry Room Gas Clothes Dryers with New Metallic Hard Pipe. Replace existing 3/4" gas line serving gas clothes dryers with 1" gas piping from existing gas meter.
Q00649994-I1
04/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Arthur Harris
04/07/2023
Filed — Alteration
Replacement of FOUR (4) Existing Flexible Non-Metallic Gas Hose Connections to FOUR (4) Laundry Room Gas Clothes Dryers with New Metallic Hard Pipe. Replace existing 3/4" gas line serving gas clothes dryers with 1" gas piping from existing gas meter.
Q00649994-P5
03/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Arthur Harris
03/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/04/2023
Filed — Alteration
Replacement of FOUR (4) Existing Flexible Non-Metallic Gas Hose Connections to FOUR (4) Laundry Room Gas Clothes Dryers with New Metallic Hard Pipe. Replace existing 3/4" gas line serving gas clothes dryers with 1" gas piping from existing gas meter.
Q00649994-P4
12/30/2022
Filed — Alteration
Replacement of FOUR (4) Existing Flexible Non-Metallic Gas Hose Connections to FOUR (4) Laundry Room Gas Clothes Dryers with New Metallic Hard Pipe. Replace existing 3/4" gas line serving gas clothes dryers with 1" gas piping from existing gas meter.
Q00649994-P3
12/29/2022
Special inspection requirement — Energy Code Compliance Inspections
Arthur Harris
12/22/2022
Filed — Alteration
Replacement of FOUR (4) Existing Flexible Non-Metallic Gas Hose Connections to FOUR (4) Laundry Room Gas Clothes Dryers with New Metallic Hard Pipe. Replace existing 3/4" gas line serving gas clothes dryers with 1" gas piping from existing gas meter.
Q00649994-P2
12/16/2022
Violation issued (ECB, closed)
Local Law
10/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2022
Filed — Alteration
Replacement of FOUR (4) Existing Flexible Non-Metallic Gas Hose Connections to FOUR (4) Laundry Room Gas Clothes Dryers with New Metallic Hard Pipe. Replace existing 3/4" gas line serving gas clothes dryers with 1" gas piping from existing gas meter.
Q00649994-P1
08/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Arthur Harris
08/05/2022
Permit issued — General Construction
Q00659479-I1-GC
07/20/2022
Permit issued — Plumbing
Q00649994-I1-PL
06/08/2022
Filed — Alteration
Replacement of FOUR (4) Existing Flexible Non-Metallic Gas Hose Connections to FOUR (4) Laundry Room Gas Clothes Dryers with New Metallic Hard Pipe. Replace existing 3/4" gas line serving gas clothes dryers with 1" gas piping from existing gas meter.
Q00649994-I1
02/18/2022
Cycle 9 facade report submitted
02/03/2022
Filed — Alteration
Q00659479-I1
01/25/2022
Cycle 9 facade inspection completed
01/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
01/12/2022
Special inspection requirement — Masonry
BRIAN T. O'CONNOR
01/09/2022
Special inspection requirement — Final
JAMES CORNEJO
10/17/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/19/2019
Violation issued (ECB, open)
Construction
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/16/2017
Cycle 8 facade report signed — SAFE
08/23/2017
Cycle 8 facade inspection completed
05/08/2017
Cycle 8 facade report submitted
10/15/2015
Violation issued (HPD, closed)
I
07/07/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/24/2013
Violation issued (ECB, closed)
Elevators
01/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/14/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/21/2012
Cycle 7 facade report submitted
02/17/2012
Cycle 7 facade report signed — SWARMP
01/16/2012
Cycle 7 facade inspection completed
09/23/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/12/2007
Cycle 6 facade report submitted
12/12/2007
Cycle 6 facade report signed — SWARMP
11/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2007
Cycle 6 facade inspection completed
05/08/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/21/2006
Violation issued (ECB, closed)
Local Law
09/20/2006
Violation issued (ECB, closed)
Local Law
07/21/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/23/2006
Violation issued (ECB, closed)
Local Law
04/21/2006
Violation issued (ECB, closed)
Local Law
11/02/2005
Violation issued (ECB, closed)
Local Law
10/06/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/24/2005
Violation issued (ECB, closed)
Local Law
03/16/2005
Violation issued (ECB, closed)
Local Law
12/15/2004
Violation issued (ECB, closed)
Local Law
06/14/2004
Violation issued (ECB, closed)
Local Law
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLIBERTY CONSTRUCTION & RE08/05/2022
DOB NOWPlumbingSigned-offWASSERMAN-TRIEFLER P & H07/20/2022
BISPLISSUEDLANDMARK PLUMBING & HEATING07/26/2018
BISPLISSUEDS.K. PIPING & HEATING COR01/25/2010
BISOTISSUEDSTYLE & CARE INC01/20/2010
BISOTISSUEDACCURA RESTORATION05/24/2007
BISOTISSUEDABILENE INC07/17/2002
BISPLISSUEDBELL FUEL OIL, LLC07/17/2002
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
04/09/2023Energy Code Compliance InspectionsArthur Harrisprogress
03/03/2023Energy Code Compliance InspectionsArthur Harrisprogress
12/29/2022Energy Code Compliance InspectionsArthur Harrisprogress
08/08/2022Energy Code Compliance InspectionsArthur Harrisprogress
01/12/2022Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
01/12/2022MasonryBRIAN T. O'CONNORspecial
01/09/2022FinalJAMES CORNEJOprogress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00659479-I1Request digital key ↗
08/24/2026Q00649994-P5Request digital key ↗
08/24/2026Q00649994-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
07/24/2018440497393Open ↗
01/25/2010410183723Open ↗
01/20/2010410183723Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
07/24/2018440497393Open ↗
10/23/2008410183723Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/08/2010410183723Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026Q00649994-P5Open ↗
08/24/2026Q00649994-P4Open ↗
08/24/2026Q00649994-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/18/2026Q00649994-I1Open ↗
09/02/2026Q00649994-P3Open ↗
08/27/2026Q00649994-P5Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/07/2019440497393Open ↗
07/08/2010410183723Open ↗
01/20/2010410183723Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/24/2018440497393Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/24/2018440497393Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/24/2018440497393Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q00659479-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
07/24/2018440497393Open ↗
10/23/2008410183723Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/02/2010410183723Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
07/24/2018440497393Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026Q00649994-P4Open ↗
08/24/2026Q00649994-P3Open ↗
08/24/2026Q00649994-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/24/2018440497393Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/24/2018440497393Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/23/2019440497393Open ↗
07/08/2010410183723Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/23/2008410183723Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/23/2019440497393Open ↗
07/24/2018440497393Open ↗
07/08/2010410183723Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
07/24/2018440497393Open ↗
▸BISEFILING COVER SHEET1
10/23/2008410183723Open ↗