← Back
Elevator cooperative
Ruskin Apartments
66-38 YELLOWSTONE BLVD · BIN 4432097
💬 Discuss this project
1950Year Built
6Stories
D4Building Class
R7-1Zoning
222,030 sfGross Floor Area
246Units
LL97 CoveredRent Stabilized58 Open Violations 57 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: QUALITY & RUSKIN APTS CORP · 78,129 sf lot · 2.84 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUALITY RUSKIN HOUSING UN1103/22/2026
ARGO503/22/2026
RUSKIN & QUALITY CORP.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HARRIS ARCHITECTURE & DESIGN208/14/2023
INSITE DESIGN STUDIO102/03/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LIBERTY CONSTRUCTION & REGeneral Contractor303/21/2026
BERARDI, ONOFRIOElectrical103/21/2026
GERNDT, MATTHEWElectrical103/21/2026
ALL CITY MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355208/14/2023
BUTTERFIELD & O'CONNOR4189102/03/2022
Building Lifecycle
All (67)Filed (3)Permit Issued (2)Signed Off (1)Facade (FISP) (12)Violation (45)Inspection (2)Special Inspection (2)
01/22/2026
Violation issued (FDNY_NOV, closed)
01/20/2026
Violation issued (HPD, closed)
C
01/20/2026
Violation issued (HPD, open)
B
04/16/2024
Violation issued (HPD, closed)
A
03/06/2024
Violation issued (FDNY_NOV, closed)
12/05/2023
Violation issued (FDNY_NOV, closed)
09/11/2023
Signed off — Alteration
Replacing an existing 3/4" gas pipe line with 1" gas pipe serving four laundry room gas clothes dryers, and replacing existing 3/4" flexible gas pipe with 3/4" hard pipe serving individual gas clothes dryers.
Q00875417-I1
08/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/14/2023
Filed — Alteration
Replacing an existing 3/4" gas pipe line with 1" gas pipe serving four laundry room gas clothes dryers, and replacing existing 3/4" flexible gas pipe with 3/4" hard pipe serving individual gas clothes dryers.
Q00875417-P1
08/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
08/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Arthur Harris
08/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2023
Permit issued — Plumbing
Q00875417-I1-PL
05/18/2023
Filed — Alteration
Replacing an existing 3/4" gas pipe line with 1" gas pipe serving four laundry room gas clothes dryers, and replacing existing 3/4" flexible gas pipe with 3/4" hard pipe serving individual gas clothes dryers.
Q00875417-I1
08/05/2022
Permit issued — General Construction
Q00659475-I1-GC
02/18/2022
Cycle 9 facade report submitted
02/18/2022
Cycle 9 facade report signed — SWARMP
02/03/2022
Filed — Alteration
FACADE REPAIR AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
Q00659475-I1
01/25/2022
Cycle 9 facade inspection completed
11/18/2020
Violation issued (ECB, closed)
Construction
08/29/2019
Violation issued (ECB, closed)
Construction
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2017
Cycle 8 facade report signed — SAFE
08/23/2017
Cycle 8 facade inspection completed
03/22/2017
Cycle 8 facade report submitted
07/06/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/03/2015
Violation issued (HPD, closed)
I
07/07/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/14/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/21/2012
Cycle 7 facade report submitted
02/17/2012
Cycle 7 facade report signed — SWARMP
01/16/2012
Cycle 7 facade inspection completed
04/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/12/2007
Cycle 6 facade report submitted
12/12/2007
Cycle 6 facade report signed — SWARMP
11/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2007
Cycle 6 facade inspection completed
11/21/2006
Violation issued (ECB, closed)
Local Law
09/20/2006
Violation issued (ECB, closed)
Local Law
06/23/2006
Violation issued (ECB, closed)
Local Law
04/21/2006
Violation issued (ECB, closed)
Local Law
11/02/2005
Violation issued (ECB, closed)
Local Law
06/24/2005
Violation issued (ECB, closed)
Local Law
03/16/2005
Violation issued (ECB, closed)
Local Law
12/15/2004
Violation issued (ECB, closed)
Local Law
06/24/2004
Violation issued (ECB, closed)
Local Law
06/14/2004
Violation issued (ECB, closed)
Local Law
04/29/2004
Violation issued (ECB, closed)
Local Law
04/20/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/27/2004
Violation issued (ECB, closed)
Local Law
08/06/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/15/1999
Violation issued (ECB, closed)
Elevators
02/18/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/29/1997
Violation issued (ECB, closed)
Elevators
11/04/1992
Violation issued (ECB, closed)
Elevators
04/23/1991
Violation issued (ECB, closed)
Elevators
12/11/1990
Violation issued (ECB, closed)
Elevators
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL CITY MECHANICAL INC06/10/2023
DOB NOWGeneral ConstructionPermit IssuedLIBERTY CONSTRUCTION & RE08/05/2022
BISPLISSUEDLANDMARK PLUMBING & HEATING07/26/2018
BISPLISSUEDWILLIAM F VENTURA P&H INC07/14/2014
BISOTISSUEDTHOMAS MONTEMAGNO01/30/2014
BISOTISSUEDACCURA RESTORATION05/16/2007
BISPLISSUEDBELL FUEL OIL, LLC06/26/2002
BISOTISSUEDABILENE INC06/26/2002
BISOTISSUEDNATIONAL MICROWAVE CONTRACTORS03/17/1999
BISFBISSUEDCONTROLLED COMBUSTION07/13/1989
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/14/2023Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
08/14/2023Energy Code Compliance InspectionsArthur Harrisprogress
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00659475-I1Request digital key ↗
08/24/2026Q00875417-P1Request digital key ↗
08/24/2026Q00875417-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
07/24/2018440497428Open ↗
10/29/2014420608952Open ↗
08/14/2012420608952Open ↗
▸BISWORK PERMIT APPLICATION3
07/24/2018440497428Open ↗
07/23/2014420608952Open ↗
02/05/2014420608952Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
11/06/2014420608952Open ↗
▸Seals & Professional Certifications12
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/07/2019440497428Open ↗
11/06/2014420608952Open ↗
01/23/2014420608952Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00659475-I1Open ↗
08/24/2026Q00875417-I1Open ↗
08/13/2026Q00875417-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/24/2018440497428Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/24/2018440497428Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/24/2018440497428Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q00875417-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q00875417-I1Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
07/24/2018440497428Open ↗
08/14/2012420608952Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/28/2014420608952Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
07/24/2018440497428Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00659475-I1Open ↗
08/24/2026Q00875417-I1Open ↗
08/13/2026Q00875417-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/24/2018440497428Open ↗
08/14/2012420608952Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/07/2014420608952Open ↗
08/14/2012420608952Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/07/2014420608952Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/24/2018440497428Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/23/2019440497428Open ↗
11/06/2014420608952Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/14/2012420608952Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/07/2014420608952Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
03/23/2019440497428Open ↗
07/24/2018440497428Open ↗
11/07/2014420608952Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
07/24/2018440497428Open ↗
▸BISEFILING COVER SHEET1
08/14/2012420608952Open ↗