Public elementary, junior or senior high
Forest Hills High School
66-49 110 STREET · BIN 4052143
💬 Discuss this project
1940Year Built
4Stories
W1Building Class
R4Zoning
192,200 sfGross Floor Area
1Units
LL97 Covered17 Open Violations 0 unresolved · 17 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 422,500 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction29p · 3 filings · 20 docs
Floor 32p · 1 filing · 15 docs
Floor 2Under Construction21p · 1 filing · 8 docs
Floor 1Under Construction23p · 2 filings · 20 docs
Sub-BasementUnder Construction1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION3209/13/2026
NYC SCHOOL CONSTRUCTION AUTHORITY5807/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION1003/22/2026
DEPARTMENT OF EDUCATION 0403/22/2026
DEPT OF ED 0203/22/2026
DEPT OF ED,Q440, Q441103/22/2026
DEPT OF EDUCATION/PS 440103/22/2026
ABC CONSTRUCTION CONT203/22/2026
DOE P.S 220 EDWARD MANDEL103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES1603/21/2026
AK CONSULTING SERVICES203/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY303/21/2026
AME SERVICES603/21/2026
DSENY ENGINEERING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARMSTRONG ROOFING CORPGeneral Contractor1208/22/2026
NEW SAFEWAY CONTRACTINGGeneral Contractor903/21/2026
LAWRENCE'S CONTRACTOR,INCGeneral Contractor807/08/2026
WHITESTONE CONSTRUCTION CORPGeneral Contractor707/08/2026
VENUS GROUP INCGeneral Contractor406/27/2026
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
MARTANY TILE CORPElectrical103/21/2026
STANCO SYSTEM ELEC'L CONTElectrical103/22/2026
VINCENT SPINAElectrical103/21/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
MAR-SAL PLBG & HTG, INCPlumbing107/19/2026
BORRELLI, RAFFAELEElectrical103/21/2026
CEDOMIR MARAElectrical103/21/2026
COONEY, RONANElectrical103/21/2026
FRANCIS RICHARDSElectrical103/21/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001205/07/2026
KS ENGINEERS, P.C.7715103/03/2023
Building Lifecycle
All (193)Filed (31)Permit Issued (26)Signed Off (4)Violation (60)Inspection (10)Objection (32)Special Inspection (30)
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/02/2026
Objection resolved — Resolved
08/21/2026
Permit issued — Sidewalk Shed
Q01179237-I1-SH
08/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR FOREST HILLS HS ANNEX AT 66-55 110 STREET, QUEENS IN CONJUNCTION WITH ALT# Q01272313, Q01272309 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01382437-P1
08/06/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
07/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2026
Special inspection requirement — Final
NELSON LOPEZ
07/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
NELSON LOPEZ
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
07/24/2026
Special inspection requirement — Sprayed fire-resistant materials
NELSON LOPEZ
07/24/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
07/24/2026
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
07/24/2026
Special inspection requirement — Structural Steel - Welding
NELSON LOPEZ
07/24/2026
Special inspection requirement — Structural Steel - High Strength Bolting
NELSON LOPEZ
07/24/2026
Special inspection requirement — Structural Steel - Details
NELSON LOPEZ
07/23/2026
Filed — Alteration
Forest Hills HS-Existing Building Backflow Prevention Plumbing below ground. Provide associated trenching for installation of underslab piping from existing sanitary underslab.
Q01419620-S1
07/23/2026
Filed — Alteration
Forest Hills HS-Existing Building Backflow Prevention Plumbing below ground. Provide associated trenching for installation of underslab piping from existing sanitary underslab.
Q01419620-S2
07/21/2026
Violation issued (ECB, open)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
07/17/2026
Permit issued — Plumbing
Q01272313-S2-PL
07/16/2026
Filed — Alteration
Forest Hills HS-Existing Building Backflow Prevention Plumbing below ground. Provide associated trenching for installation of underslab piping from existing sanitary underslab.
Q01419620-I1
07/13/2026
Filed — Alteration
INSTALLATION OF INDOOR AND OUTDOOR HVAC UNIT FOR THE AUDITORIUM
Q00991221-P1
07/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/09/2026
Special inspection requirement — Mechanical Systems
07/09/2026
Special inspection requirement — Post-installed Anchors
07/09/2026
Special inspection requirement — Sprayed fire-resistant materials
07/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/09/2026
Special inspection requirement — Structural Steel - Details
07/09/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/09/2026
Special inspection requirement — Structural Steel - Welding
07/09/2026
Special inspection requirement — Final
07/02/2026
Special inspection requirement — Post-installed Anchors
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/02/2026
Special inspection requirement — Maintenance information
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/11/2026
Permit issued — Construction Fence
Q01382437-I1-FN
06/11/2026
Permit issued — General Construction
Q01272313-S3-GC-CX
06/11/2026
Permit issued — Support of Excavation
Q01272309-I1-SE
06/11/2026
Permit issued — General Construction
Q01272313-I1-GC
05/29/2026
Permit issued — Sidewalk Shed
Q01179237-I1-SH
05/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NELSON LOPEZ
05/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
NELSON LOPEZ
05/07/2026
Filed — Alteration
FOREST HILLS HS: Remove existing fencing, gates, bleachers, tennis courts, landscaping, curbs, and pavement. Project area shall be razed of all surface finishes and excavation completed at the extent of the future annex footprint
Q01272313-P2
05/07/2026
Filed — Alteration
FOREST HILLS HS: PROPOSED SUPPORT OF EXCAVATION FOR SLOPED EXCAVATION ON THE SITE AT A EXISTING SCHOOL BUILDING.
Q01272309-P1
05/07/2026
Filed — Alteration
FOREST HILLS HS: Remove existing fencing, gates, bleachers, tennis courts, landscaping, curbs, and pavement. Project area shall be razed of all surface finishes and excavation completed at the extent of the future annex footprint
Q01272313-P3
05/07/2026
Filed — Alteration
FOREST HILLS HS: Remove existing fencing, gates, bleachers, tennis courts, landscaping, curbs, and pavement. Project area shall be razed of all surface finishes and excavation completed at the extent of the future annex footprint
Q01272313-P1
05/07/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
NELSON LOPEZ
05/07/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NELSON LOPEZ
Latest 60 of 193 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedARMSTRONG ROOFING CORP08/21/2026
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC07/17/2026
DOB NOWConstruction FencePermit IssuedVENUS GROUP INC06/11/2026
DOB NOWGeneral ConstructionPermit IssuedVENUS GROUP INC06/11/2026
DOB NOWSupport of ExcavationPermit IssuedVENUS GROUP INC06/11/2026
DOB NOWGeneral ConstructionPermit IssuedVENUS GROUP INC06/11/2026
DOB NOWSidewalk ShedPermit IssuedARMSTRONG ROOFING CORP05/29/2026
DOB NOWMechanical SystemsPermit IssuedLAWRENCE'S CONTRACTOR,INC04/29/2026
DOB NOWGeneral ConstructionPermit IssuedARMSTRONG ROOFING CORP03/27/2026
DOB NOWSidewalk ShedPermit IssuedARMSTRONG ROOFING CORP02/27/2026
DOB NOWSupported ScaffoldPermit IssuedARMSTRONG ROOFING CORP02/20/2026
DOB NOWConstruction FencePermit IssuedARMSTRONG ROOFING CORP01/16/2026
DOB NOWMechanical SystemsPermit IssuedLAWRENCE'S CONTRACTOR,INC05/14/2025
DOB NOWGeneral ConstructionPermit IssuedARMSTRONG ROOFING CORP04/17/2025
DOB NOWSupported ScaffoldPermit IssuedARMSTRONG ROOFING CORP03/06/2025
DOB NOWSidewalk ShedPermit IssuedARMSTRONG ROOFING CORP02/28/2025
DOB NOWConstruction FencePermit IssuedARMSTRONG ROOFING CORP02/26/2025
DOB NOWSidewalk ShedSigned-offWHITESTONE CONSTRUCTION CORP01/24/2025
DOB NOWMechanical SystemsPermit IssuedLAWRENCE'S CONTRACTOR,INC06/04/2024
DOB NOWSupported ScaffoldSigned-offNEW SAFEWAY CONTRACTING05/30/2024
DOB NOWConstruction FenceSigned-offWHITESTONE CONSTRUCTION CORP03/22/2024
DOB NOWSidewalk ShedSigned-offWHITESTONE CONSTRUCTION CORP01/23/2024
DOB NOWGeneral ConstructionSigned-offNEW SAFEWAY CONTRACTING12/14/2023
DOB NOWSupported ScaffoldSigned-offNEW SAFEWAY CONTRACTING05/11/2023
DOB NOWMechanical SystemsPermit IssuedLAWRENCE'S CONTRACTOR,INC04/10/2023
DOB NOWSidewalk ShedSigned-offWHITESTONE CONSTRUCTION CORP01/25/2023
BISOTISSUEDABC CONSTRUCTION CONT INC06/08/2022
BISEQISSUEDEVERLAST SCAFFOLDING INC09/03/2021
BISEQISSUEDEVERLAST SCAFFOLDING INC09/01/2021
BISEQISSUEDABC CONSTRUCTION CONT INC08/03/2021
BISEQISSUEDEVERLAST SCAFFOLDING INC09/02/2020
BISEQISSUEDEVERLAST SCAFFOLDING INC09/02/2020
BISEQISSUEDABC CONSTRUCTION CONT INC08/13/2020
BISOTISSUEDABC CONSTRUCTION CONT INC06/02/2020
BISEQISSUEDEVERLAST SCAFFOLDING INC09/25/2019
BISEQISSUEDEVERLAST SCAFFOLDING INC09/03/2019
BISOTISSUEDABC CONSTRUCTION CONT INC06/03/2019
BISOTISSUEDAKM CONSTRUCTION SERVICE*05/07/2019
BISEQISSUEDABC CONSTRUCTION CONT INC03/01/2019
BISOTISSUEDABC CONSTRUCTION CONT INC10/05/2018
+ 36 more permits on file
2 projects · most recent 07/13/2026
Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/13/2026——Air Conditioning Systems
Cooling
Daikin CAH022GCM 9,000 CFM · Fan Coil Indoor ×8
Climacool UCA030BHASACEBS 120 tons · Air Cooled Chiller ×2
03/07/2023Permit IssuedLAWRENCE'S CONTRACTOR,INCRefrigeration Systems, Ventilation Systems
Refrigeration
2 projects · most recent 07/23/2026
Water/Sanitary Storm
FiledStatusContractorScope
07/23/2026——Water/Sanitary
05/07/2026Permit IssuedMAR-SAL PLBG & HTG, INCStorm
25 projects · most recent 04/13/2026
General Wiring Lighting
FiledStatusContractorScope
04/13/2026Permit IssuedAUJLA ELECTRIC CORP—
03/18/2026Permit IssuedCHARAN ELEC'L ENTERP'S INGeneral Wiring
12/03/2025Permit IssuedTESTA ELECTRIC CO., INCLighting
10/07/2025Permit IssuedLVI NYC ELECTRICAL INCLighting
09/12/2025CompleteGEMINI ELECTRIC CO., INC.—
04/11/2025CompleteGEMINI ELECTRIC CO., INC.—
03/24/2025Permit IssuedAMIN ELECTRICAL CORP—
02/27/2025Permit IssuedSTANCO SYSTEM ELEC'L CONT—
02/10/2025Permit IssuedLABCO ELETRT CONTNG CORPGeneral Wiring
04/17/2024CompleteGEMINI ELECTRIC CO., INC.—
03/25/2024CompleteANCO ELECTL CONTCTNG INC—
10/23/2023CompleteCHARAN ELEC'L ENTERP'S IN—
09/28/2023Permit IssuedURBAN ELECTRICAL CORPGeneral Wiring
04/19/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
09/29/2022CompleteCHARAN ELEC'L ENTERP'S IN—
3 projects · most recent 07/13/2026
Steel
FiledStatusContractorScope
07/13/2026——Steel
05/07/2026Permit IssuedMAR-SAL PLBG & HTG, INC2 scope_items
05/07/2026Permit IssuedVENUS GROUP INC1 scope_items
4 projects · most recent 08/06/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
08/06/2026Permit IssuedVENUS GROUP INCFence
02/13/2025Permit IssuedARMSTRONG ROOFING CORPSidewalk Shed
02/12/2025Permit IssuedARMSTRONG ROOFING CORPFence
02/11/2025Permit IssuedARMSTRONG ROOFING CORPScaffold
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/28/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/26/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/26/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/17/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
07/24/2026FinalNELSON LOPEZprogress
07/24/2026Fire-Resistance Rated ConstructionNELSON LOPEZprogress
07/24/2026Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
07/24/2026Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
07/24/2026Sprayed fire-resistant materialsNELSON LOPEZspecial
07/24/2026Post-installed AnchorsNELSON LOPEZspecial
07/24/2026Mechanical SystemsNELSON LOPEZspecial
07/24/2026Structural Steel - WeldingNELSON LOPEZspecial
07/24/2026Structural Steel - High Strength BoltingNELSON LOPEZspecial
07/24/2026Structural Steel - DetailsNELSON LOPEZspecial
07/09/2026Fire-Resistance Rated Construction—progress
07/09/2026Fire-Resistant Penetrations and Joints—special
07/09/2026Mechanical Systems—special
07/09/2026Post-installed Anchors—special
07/09/2026Sprayed fire-resistant materials—special
07/09/2026Structural Stability – Alterations of existing buildings—special
07/09/2026Structural Steel - Details—special
07/09/2026Structural Steel - High Strength Bolting—special
07/09/2026Structural Steel - Welding—special
07/09/2026Final—progress
07/02/2026Post-installed Anchors—special
07/02/2026HVAC-R and service water piping design and insulation—energy_progress
07/02/2026Maintenance information—energy_progress
07/02/2026Fire-Resistant Penetrations and Joints—special
05/11/2026Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
Latest 25 of 55.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ps516qforest HillshsannexEducation—
Project Q01382437 Alteration · Permit Entire · 04/24/2026
Forest Hills HSEducation—
Project Q01178769 Alteration · Permit Entire · 02/12/2025
Project Q01179236 Alteration · Permit Entire · 02/11/2025
Forrest Hills HsEducation—
Project Q00811242 Alteration · LOC Issued · 01/25/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 213 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/29/2026Q01382437-P1Request digital key ↗
08/29/2026Q01382437-I1Request digital key ↗
08/26/2026Q00652171-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits1
▸BISWORK PERMIT APPLICATION1
11/03/2014401590809Open ↗
▸Seals & Professional Certifications46
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/29/2026Q01382437-P1Open ↗
08/29/2026Q01382437-I1Open ↗
08/26/2026Q00652171-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026Q01179236-I1Open ↗
09/01/2026Q00652171-S2Open ↗
09/01/2026Q01272309-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q00652171-I1Open ↗
08/26/2026Q01272313-P3Open ↗
08/23/2026Q00991221-I1Open ↗
▸Safety & Tenant Protection8
▸DOB NOWNYCSCA - Approved Site Safety Plans8
08/29/2026Q01382437-P1Open ↗
08/29/2026Q01382437-I1Open ↗
08/13/2026Q00811242-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026Q01272309-P1Open ↗
08/19/2026Q01272309-I1Open ↗
08/16/2026Q01272313-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026Q00681425-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q01353579-S4Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs67
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter31
08/29/2026Q01382437-P1Open ↗
08/29/2026Q01382437-I1Open ↗
08/26/2026Q00652171-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)31
08/29/2026Q01382437-I1Open ↗
08/29/2026Q01382437-P1Open ↗
08/26/2026Q00652171-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/26/2026Q00652171-I1Open ↗
08/13/2026Q00994848-I1Open ↗
08/13/2026Q00991221-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026Q00681425-I1Open ↗
▸Other Documents48
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal35
08/29/2026Q01382437-P1Open ↗
08/29/2026Q01382437-I1Open ↗
08/26/2026Q00652171-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProof of Historic Building9
08/26/2026Q00652171-I1Open ↗
08/23/2026Q00991221-P1Open ↗
08/16/2026Q01272313-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/19/2026Q01272309-I1Open ↗
08/16/2026Q01272313-S3Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/26/2026Q00652171-I1Open ↗
08/13/2026Q00681425-I1Open ↗