← Back
BuildNYC
Two family frame
66-51 CLINTON AVENUE
QUEENS · Maspeth · BIN 4055361
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R4-1Zoning
1,800 sfGross Floor Area
2Units
Two family frame · 2,400 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Plumbing fixture replacement and hot water heater1 filing
Floor 1Plumbing fixture replacement and hot water heater1 filing
CellarPlumbing fixture replacement and hot water heater1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Frank J Quatela Architects210/13/2026
Building Lifecycle
10/13/2026
Filed — Alteration
REPLACE ALL PLUMBING FIXTURES ON EXISTING ROUGHING AND NEW HOT WATER HEATER AT CELLAR AS PER PLANS. FILED IN CONJUNCTION WITH DOB NOW Q01468155-I1.
Q01468155-I1
10/13/2026
Filed — Alteration
REPLACE ALL PLUMBING FIXTURES ON EXISTING ROUGHING AND NEW HOT WATER HEATER AT CELLAR AS PER PLANS. FILED IN CONJUNCTION WITH DOB NOW Q01468155-I1.
Q01468155-S1
10/09/2026
Special inspection requirement — Maintenance information
10/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
10/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
19 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 10/13/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
10/13/2026——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 10/13/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/13/2026——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/09/2026Maintenance information—energy_progress
10/09/2026HVAC-R and service water heating equipment—energy_progress
10/09/2026Fire-Resistant Penetrations and Joints—special
10/09/2026Energy Code Compliance Inspections—progress
10/09/2026HVAC-R and service water heating system controls—energy_progress
10/09/2026Permanent certificate—energy_progress
10/09/2026HVAC-R and service water piping design and insulation—energy_progress
10/01/2026Interior lighting power—energy_progress
10/01/2026HVAC-R and service water heating equipment—energy_progress
10/01/2026Fire-Resistant Penetrations and Joints—special
10/01/2026Energy Code Compliance Inspections—progress
10/01/2026HVAC-R and service water piping design and insulation—energy_progress
10/01/2026Insulation placement and R values—energy_progress
10/01/2026HVAC-R and service water heating system controls—energy_progress
10/01/2026Ventilation and air distribution system—energy_progress
09/30/2026Mechanical Systems—special
09/30/2026Final—progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account