← Back
Office with commercial, 1-6 stories
66-58 FRESH POND ROAD
QUEENS · Ridgewood · BIN 4084940
💬 Discuss this project
1924Year Built
2Stories
O5Building Class
R6BZoning
13,003 sfGross Floor Area
5Units
0 Open Violations
Office with commercial, 1-6 stories · Owner of record: MASPETH FEDERAL SAVINGS & LOAN ASSOCIATI ON · 5,675 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Roof7p · 2 filings · 20 docs
Cellar3p · 1 filing · 8 docs
Site & exterior37p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MASPETH FEDERAL SAVINGS3107/08/2026
MASPETH FEDERAL SAVINGS LOAN1003/21/2026
PHOENIX SUTTON STR INC703/22/2026
MASPETH FEDERAL SAVINGS BANK303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCULUS CONSULTING GROUP603/21/2026
DSENY ENGINEERING SERVICES403/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONCEPT CONSTRUCTION SERVGeneral Contractor1107/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor603/21/2026
PHOENIX SUTTON STR INCGeneral Contractor403/21/2026
BEDROCK PLBG. & HTG., INCPlumbing207/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEORGE J. XERAKIAS, PE1658106/06/2025
JAJ ENGINEERING PLLC930702/25/2025
KOSURI ENGINEERING & CONS8241111/07/2024
Building Lifecycle
All (72)Filed (13)Permit Issued (14)Signed Off (10)Violation (3)Inspection (4)Objection (2)Special Inspection (26)
05/21/2026
Signed off — Alteration
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01134394-S1
05/01/2026
Signed off — Alteration
GENERAL CONSTRUCTION WORK ASSOCIATED WITH NEW ROOF INSTALLATION OVER EX DECK AT THE MAIN BUILDING ROOF & STAIR BULKHEAD. ADDITIONALLY, WORK INCLUDES PARAPET REPLACEMENT & NEW PARAPET RAILING INSTALLATION. NO CHANGE IN USE, OCCUPANCY, EGRESS.
Q01127316-I1
03/30/2026
Signed off — Alteration
MODIFICATION TO EX PLUMBING SYSTEM AS PER DWGS. NEW DRAINS AT ROOF TO EX LEADERS. INSTALLATION OF NEW ON-SITE DRYWELLS FOR STORMWATER FROM EX BLDG, INCL TRENCH & FLOOR DRAINS, PIPING/CONNECTION. REMOVE PLUMBING FIXTURES IN EX CELLAR TOILETS; CAP AT SOURCE
Q01127096-I1
03/30/2026
Signed off — Alteration
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01134394-I1
02/10/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/09/2026
Permit issued — Plumbing
Q01127096-I1-PL
10/29/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177263-I1
09/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01177261-I1
07/23/2025
Signed off — Alteration
Installation of suspended scaffold for facade repair & inspection.
Q01233128-I1
06/10/2025
Permit issued — Suspended Scaffold
Q01233128-I1-SC
06/06/2025
Filed — Alteration
Installation of suspended scaffold for facade repair & inspection.
Q01233128-I1
05/29/2025
Special inspection requirement — Post-installed Anchors
George Xerakias
05/29/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
04/22/2025
Signed off — Alteration
FOUNDATION AND EARTHWORK ASSOCIATED WITH NEW ROLL-DOWN GATE AND DRYWELLS IN REAR OPEN SPACE, AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01134392-I1
04/17/2025
Signed off — Alteration
SUPPORT OF EXCAVATION FOR UTILITY AND WATER PROOFINGINSTALLATIONS.
Q01127029-I1
04/07/2025
Special inspection requirement — Insulation placement and R values
Joseph Jabour
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
04/07/2025
Special inspection requirement — Final
Joseph Jabour
04/07/2025
Special inspection requirement — Masonry
Joseph Jabour
04/04/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK ASSOCIATED WITH NEW ROOF INSTALLATION OVER EX DECK AT THE MAIN BUILDING ROOF & STAIR BULKHEAD. ADDITIONALLY, WORK INCLUDES PARAPET REPLACEMENT & NEW PARAPET RAILING INSTALLATION. NO CHANGE IN USE, OCCUPANCY, EGRESS.
Q01127316-P1
04/02/2025
Special inspection requirement — Masonry
03/31/2025
Special inspection requirement — Final
Joseph Jabour
03/31/2025
Special inspection requirement — Insulation placement and R values
Joseph Jabour
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
03/07/2025
Permit issued — General Construction
Q01127316-I1-GC
03/04/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/25/2025
Filed — Alteration
SUPPORT OF EXCAVATION FOR UTILITY AND WATER PROOFINGINSTALLATIONS.
Q01127029-P1
02/25/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Joseph Jabour
02/19/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177263-I1
02/19/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01177261-I1
02/19/2025
Permit issued — Supported Scaffold
Q01177263-I1-SF
02/19/2025
Permit issued — Sidewalk Shed
Q01177261-I1-SH
02/13/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK ASSOCIATED WITH NEW ROOF INSTALLATION OVER EX DECK AT THE MAIN BUILDING ROOF & STAIR BULKHEAD. ADDITIONALLY, WORK INCLUDES PARAPET REPLACEMENT & NEW PARAPET RAILING INSTALLATION. NO CHANGE IN USE, OCCUPANCY, EGRESS.
Q01127316-I1
01/03/2025
Permit issued — Construction Fence
Q01134394-S1-FN
12/19/2024
Objection resolved — Addressed
12/11/2024
Permit issued — Plumbing
Q01127096-I1-PL
12/06/2024
Objection raised — Other
11/22/2024
Filed — Alteration
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01134394-S1
11/19/2024
Permit issued — Earth Work
Q01134392-I1-EA
11/15/2024
Permit issued — Support of Excavation
Q01127029-I1-SE
11/15/2024
Permit issued — Foundation
Q01134392-I1-FO
11/14/2024
Special inspection requirement — Concrete - Cast-In-Place
Joseph Jabour
11/14/2024
Special inspection requirement — Footing and Foundation
Joseph Jabour
11/14/2024
Special inspection requirement — Final
Joseph Jabour
11/14/2024
Special inspection requirement — Subgrade Inspections
Joseph Jabour
11/14/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ESHWAR KOSURI
11/13/2024
Filed — Alteration
FOUNDATION AND EARTHWORK ASSOCIATED WITH NEW ROLL-DOWN GATE AND DRYWELLS IN REAR OPEN SPACE, AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01134392-P1
11/13/2024
Permit issued — Structural
Q01134394-I1-GC
11/13/2024
Permit issued — General Construction
Q01134394-I1-ST
11/13/2024
Special inspection requirement — Final
Joseph Jabour
11/13/2024
Special inspection requirement — Footing and Foundation
Joseph Jabour
11/13/2024
Special inspection requirement — Concrete - Cast-In-Place
Joseph Jabour
11/13/2024
Special inspection requirement — Subgrade Inspections
Joseph Jabour
11/13/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ESHWAR KOSURI
11/07/2024
Filed — Alteration
MODIFICATION TO EX PLUMBING SYSTEM AS PER DWGS. NEW DRAINS AT ROOF TO EX LEADERS. INSTALLATION OF NEW ON-SITE DRYWELLS FOR STORMWATER FROM EX BLDG, INCL TRENCH & FLOOR DRAINS, PIPING/CONNECTION. REMOVE PLUMBING FIXTURES IN EX CELLAR TOILETS; CAP AT SOURCE
Q01127096-I1
11/05/2024
Filed — Alteration
FOUNDATION AND EARTHWORK ASSOCIATED WITH NEW ROLL-DOWN GATE AND DRYWELLS IN REAR OPEN SPACE, AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01134392-I1
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
11/01/2024
Filed — Alteration
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01134394-I1
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC02/09/2026
DOB NOWSuspended ScaffoldSigned-offJRR CONTRACTING INC06/10/2025
DOB NOWGeneral ConstructionSigned-offCONCEPT CONSTRUCTION SERV03/07/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC02/19/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/19/2025
DOB NOWConstruction FenceSigned-offCONCEPT CONSTRUCTION SERV01/03/2025
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC12/11/2024
DOB NOWEarth WorkSigned-offCONCEPT CONSTRUCTION SERV11/19/2024
DOB NOWSupport of ExcavationSigned-offCONCEPT CONSTRUCTION SERV11/15/2024
DOB NOWFoundationSigned-offCONCEPT CONSTRUCTION SERV11/15/2024
DOB NOWStructuralSigned-offCONCEPT CONSTRUCTION SERV11/13/2024
DOB NOWGeneral ConstructionSigned-offCONCEPT CONSTRUCTION SERV11/13/2024
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC07/22/2019
DOB NOWConstruction FenceSigned-offPHOENIX SUTTON STR INC07/22/2019
BISPLISSUEDBILLHARZ PLUMBING, INC08/16/2023
BISPLISSUEDVILLAGE P & H NY INC07/18/2022
BISSPISSUEDAPPROVED FIRE PREV. CORP06/09/2022
BISOTISSUEDSETAUKET CONTRACTING CORP08/05/2019
BISMHISSUEDSETAUKET CONTRACTING CORP08/05/2019
BISSPISSUEDAPPROVED FIRE PREV. CORP12/27/2018
BISPLISSUEDVILLAGE P & H NY INC12/13/2018
BISOTISSUEDSETAUKET CONTRACTING CORP11/20/2018
BISMHISSUEDSETAUKET CONTRACTING CORP11/17/2018
BISMHISSUEDARISTA AIR CONDITIONING CORP09/24/2008
BISBLISSUEDBILLHARZ PLUMBING INC.01/29/2001
BISPLISSUEDBILLHARZ PLUMBING INC.01/29/2001
BIS—ISSUEDL S SIGN CO INC06/02/1998
BISPLISSUEDE.S.CONSOLIDATED PLG.02/11/1998
BIS—ISSUEDL.S.SIGN CO.INC.02/10/1998
BISOTISSUEDCOOK & KRUPA INC02/02/1998
BISMHISSUEDCOOK & KRUPA INC07/31/1997
BISOTISSUEDCOOK & KRUPA , INC.03/31/1997
BISOTISSUEDWERNER KREBS__INC05/28/1993
5 projects · most recent 02/12/2025
General Wiring
FiledStatusContractorScope
02/12/2025CompleteBOROWIDE ELECT'L CONTR'S—
08/05/2022CompleteGLEN OAKS ELEC'L INC.General Wiring
08/03/2022CompleteGLEN OAKS ELEC'L INC.General Wiring
06/02/2022CompleteWILLDAN ELECTRICAL OF NY—
07/15/2019CompleteELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/10/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/29/2025Post-installed AnchorsGeorge Xerakiasspecial
05/29/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
04/07/2025Insulation placement and R valuesJoseph Jabourenergy_progress
04/07/2025Energy Code Compliance InspectionsJoseph Jabourprogress
04/07/2025FinalJoseph Jabourprogress
04/07/2025MasonryJoseph Jabourspecial
04/02/2025Masonry—special
03/31/2025FinalJoseph Jabourprogress
03/31/2025Insulation placement and R valuesJoseph Jabourenergy_progress
03/31/2025Energy Code Compliance InspectionsJoseph Jabourprogress
02/25/2025Excavations - Sheeting, Shoring, and BracingJoseph Jabourspecial
11/14/2024Concrete - Cast-In-PlaceJoseph Jabourspecial
11/14/2024Footing and FoundationJoseph Jabourprogress
11/14/2024FinalJoseph Jabourprogress
11/14/2024Subgrade InspectionsJoseph Jabourspecial
11/14/2024Subsurface Investigations (Borings/Test Pits)ESHWAR KOSURIspecial
11/13/2024FinalJoseph Jabourprogress
11/13/2024Footing and FoundationJoseph Jabourprogress
11/13/2024Concrete - Cast-In-PlaceJoseph Jabourspecial
11/13/2024Subgrade InspectionsJoseph Jabourspecial
11/13/2024Subsurface Investigations (Borings/Test Pits)ESHWAR KOSURIspecial
11/05/2024Fire-Resistant Penetrations and JointsJoseph Jabourspecial
10/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJoseph Jabourspecial
10/30/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesESHWAR KOSURIspecial
10/30/2024Subsurface Investigations (Borings/Test Pits)ESHWAR KOSURIspecial
Latest 25 of 26.
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
08/21/2026Q01127096-I1Request digital key ↗
08/21/2026Q01134392-P1Request digital key ↗
08/21/2026Q01134392-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00196434-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00196434-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION17
01/25/2023440513712Open ↗
01/24/2023440513712Open ↗
11/15/2022440513712Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION12
11/16/2023440513712Open ↗
09/20/2022440513712Open ↗
09/15/2022440513712Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026Q00196434-I1Open ↗
08/21/2026Q01127096-I1Open ↗
08/21/2026Q01134392-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q01127316-I1Open ↗
08/28/2026Q01233128-I1Open ↗
08/28/2026Q01233128-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026Q01127316-I1Open ↗
09/02/2026Q01127316-I1Open ↗
08/27/2026Q00196434-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/21/2020440519235Open ↗
12/31/2008410162782Open ↗
09/16/2008410162782Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/16/2008410162782Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/16/2008410162782Open ↗
▸Trade Schedules & Equipment19
▸BISEQUIPMENT USE PERMITS8
03/06/2025440513712Open ↗
06/08/2022440513712Open ↗
12/31/2008410162782Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/06/2025440513712Open ↗
03/06/2025440513712Open ↗
12/31/2008410162782Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/20/2019440513712Open ↗
11/14/2019440513712Open ↗
▸BISSCHEDULE B - PLUMBING2
11/07/2022440513712Open ↗
10/30/2018440513712Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/23/2022440513712Open ↗
▸BISSPRINKLER SYSTEMS1
05/23/2022440513712Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/15/2023421925457Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/23/2022440513712Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/28/2026Q00196434-I1Open ↗
▸Environmental & Asbestos12
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU6190QN183
12/15/2023440513712Open ↗
08/12/2021440513703Open ↗
08/12/2021440519235Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
12/13/2018440513712Open ↗
11/20/2018440513703Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/16/2008410162782Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
10/30/2018440519235Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01127096-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026Q01127316-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/20/2022440513712Open ↗
08/12/2021440513703Open ↗
10/30/2018440513712Open ↗
Showing 3 of 5 on file for this type
▸BISNYCECC ANALYSIS3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
05/20/2022440513712Open ↗
05/20/2022440513712Open ↗
04/21/2020440519235Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/23/2022440513712Open ↗
08/12/2021440513703Open ↗
▸BISINTERIOR LIGHTING POWER1
05/23/2022440513712Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/21/2020440519235Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/23/2022440513712Open ↗
▸BISLIGHTING CONTROLS1
05/23/2022440513712Open ↗
▸BIS* DUCT LEAKAGE TESTING1
05/23/2022440513712Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/23/2022440513712Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/20/2022440513712Open ↗
08/12/2021440513703Open ↗
10/30/2018440513712Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSOIL REPORT3
08/21/2026Q01134392-I1Open ↗
08/13/2026Q01127096-I1Open ↗
08/13/2026Q01134392-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01127096-I1Open ↗
08/13/2026Q01134392-I1Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/23/2022440513712Open ↗
▸BISMECHANICAL SYSTEMS1
05/23/2022440513712Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/15/2023440513712Open ↗
06/16/2023421925457Open ↗
05/11/2022400797884Open ↗
Showing 3 of 8 on file for this type
▸BISFINAL1
05/23/2022440513712Open ↗
▸BISSUPERSEDING LETTER1
11/16/2023440513712Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/31/2008410162782Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/16/2008410162782Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT9
06/15/2023421925457Open ↗
05/20/2022440513712Open ↗
04/21/2020440519235Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
06/15/2023421925457Open ↗
05/23/2022440513712Open ↗
08/12/2021440513703Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION4
01/25/2023440513712Open ↗
11/15/2022440513712Open ↗
06/15/2022400375161Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
11/16/2023440513712Open ↗
09/20/2022440513712Open ↗
09/15/2022440513712Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISEFILING COVER SHEET2
12/18/2018421925457Open ↗
09/16/2008410162782Open ↗
▸Other Documents7
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01127029-I1Open ↗
08/13/2026Q01134392-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01127316-P1Open ↗
08/13/2026Q01127316-I1Open ↗
▸BISMAINTENANCE INFORMATION1
05/23/2022440513712Open ↗
▸DOB NOWCalculations1
08/13/2026Q01233128-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01233128-I1Open ↗