← Back
BuildNYC
Office with commercial, 1-6 stories
66-60 FRESH POND ROAD
QUEENS · Ridgewood · BIN 4084940
💬 Discuss this project
1924Year Built
2Stories
O5Building Class
R6BZoning
13,003 sfGross Floor Area
5Units
0 Active Violations
Office with commercial, 1-6 stories · Owner of record: Maspeth Federal Savings & Loan Associati on · 5,675 sf lot · 2.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing system modification and drywell installation7p · 2 filings · 20 docs
CellarPlumbing system modification and drywell installation3p · 1 filing · 8 docs
Site & exteriorMaspeth Federal Savings37p · 8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Maspeth Federal Savings4407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJM Associates604/04/2025
Dseny Engineering Services202/25/2025
MSM Engineering Services202/19/2025
Conceptconsruction Services111/22/2024
Royal T&E107/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Oculus Consulting Group603/21/2026
Dseny Engineering Services403/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Concept Construction ServiceGeneral Contractor907/08/2026
Andamio ScaffoldingScaffold603/21/2026
Phoenix Sutton STRScaffold403/21/2026
Concept Construction ServiceScaffold203/21/2026
Bedrock Plumbing & HeatingPlumbing207/08/2026
Willdan Electrical of NYElectrical103/22/2026
Borowide Elect'l ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
George J. Xerakias, PE1658106/06/2025
Jaj Engineering930702/25/2025
Kosuri Engineering & Cons8241111/07/2024
Building Lifecycle
All (73)Filed (13)Permit Issued (14)Signed Off (10)Violation (3)Inspection (4)Objection (2)Special Inspection (27)
05/21/2026
Signed off — Alteration
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01134394-S1
05/01/2026
Signed off — Alteration
GENERAL CONSTRUCTION WORK ASSOCIATED WITH NEW ROOF INSTALLATION OVER EX DECK AT THE MAIN BUILDING ROOF & STAIR BULKHEAD. ADDITIONALLY, WORK INCLUDES PARAPET REPLACEMENT & NEW PARAPET RAILING INSTALLATION. NO CHANGE IN USE, OCCUPANCY, EGRESS.
Q01127316-I1
03/30/2026
Signed off — Alteration
MODIFICATION TO EX PLUMBING SYSTEM AS PER DWGS. NEW DRAINS AT ROOF TO EX LEADERS. INSTALLATION OF NEW ON-SITE DRYWELLS FOR STORMWATER FROM EX BLDG, INCL TRENCH & FLOOR DRAINS, PIPING/CONNECTION. REMOVE PLUMBING FIXTURES IN EX CELLAR TOILETS; CAP AT SOURCE
Q01127096-I1
03/30/2026
Signed off — Alteration
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01134394-I1
02/10/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/09/2026
Permit issued — Plumbing
Q01127096-I1-PL
10/29/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177263-I1
09/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01177261-I1
07/23/2025
Signed off — Alteration
Installation of suspended scaffold for facade repair & inspection.
Q01233128-I1
06/10/2025
Permit issued — Suspended Scaffold
Q01233128-I1-SC
06/06/2025
Filed — Alteration
Installation of suspended scaffold for facade repair & inspection.
Q01233128-I1
05/29/2025
Special inspection requirement — Post-installed Anchors
George Xerakias
05/29/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
04/22/2025
Signed off — Alteration
FOUNDATION AND EARTHWORK ASSOCIATED WITH NEW ROLL-DOWN GATE AND DRYWELLS IN REAR OPEN SPACE, AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01134392-I1
04/17/2025
Signed off — Alteration
SUPPORT OF EXCAVATION FOR UTILITY AND WATER PROOFINGINSTALLATIONS.
Q01127029-I1
04/07/2025
Special inspection requirement — Insulation placement and R values
Joseph Jabour
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
04/07/2025
Special inspection requirement — Final
Joseph Jabour
04/07/2025
Special inspection requirement — Masonry
Joseph Jabour
04/04/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK ASSOCIATED WITH NEW ROOF INSTALLATION OVER EX DECK AT THE MAIN BUILDING ROOF & STAIR BULKHEAD. ADDITIONALLY, WORK INCLUDES PARAPET REPLACEMENT & NEW PARAPET RAILING INSTALLATION. NO CHANGE IN USE, OCCUPANCY, EGRESS.
Q01127316-P1
04/02/2025
Special inspection requirement — Masonry
03/31/2025
Special inspection requirement — Insulation placement and R values
Joseph Jabour
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
03/31/2025
Special inspection requirement — Final
Joseph Jabour
03/07/2025
Permit issued — General Construction
Q01127316-I1-GC
03/04/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/27/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Joseph Jabour
02/25/2025
Filed — Alteration
SUPPORT OF EXCAVATION FOR UTILITY AND WATER PROOFINGINSTALLATIONS.
Q01127029-P1
02/25/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Joseph Jabour
02/19/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01177263-I1
02/19/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01177261-I1
02/19/2025
Permit issued — Sidewalk Shed
Q01177261-I1-SH
02/19/2025
Permit issued — Supported Scaffold
Q01177263-I1-SF
02/13/2025
Filed — Alteration
GENERAL CONSTRUCTION WORK ASSOCIATED WITH NEW ROOF INSTALLATION OVER EX DECK AT THE MAIN BUILDING ROOF & STAIR BULKHEAD. ADDITIONALLY, WORK INCLUDES PARAPET REPLACEMENT & NEW PARAPET RAILING INSTALLATION. NO CHANGE IN USE, OCCUPANCY, EGRESS.
Q01127316-I1
01/03/2025
Permit issued — Construction Fence
Q01134394-S1-FN
12/19/2024
Objection resolved — Addressed
12/11/2024
Permit issued — Plumbing
Q01127096-I1-PL
12/06/2024
Objection raised — Other
11/22/2024
Filed — Alteration
HEREWITH FILED ALTERATION TYPE 3 FOR INSTALLATION OF TEMPORARY PLYWOOD CONSTRUCTION FENCE AS PER PLANS.
Q01134394-S1
11/19/2024
Permit issued — Foundation
Q01134392-I1-EA
11/15/2024
Permit issued — Earth Work
Q01134392-I1-FO
11/15/2024
Permit issued — Support of Excavation
Q01127029-I1-SE
11/14/2024
Special inspection requirement — Concrete - Cast-In-Place
Joseph Jabour
11/14/2024
Special inspection requirement — Footing and Foundation
Joseph Jabour
11/14/2024
Special inspection requirement — Final
Joseph Jabour
11/14/2024
Special inspection requirement — Subgrade Inspections
Joseph Jabour
11/14/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ESHWAR KOSURI
11/13/2024
Filed — Alteration
FOUNDATION AND EARTHWORK ASSOCIATED WITH NEW ROLL-DOWN GATE AND DRYWELLS IN REAR OPEN SPACE, AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01134392-P1
11/13/2024
Permit issued — General Construction
Q01134394-I1-ST
11/13/2024
Permit issued — Structural
Q01134394-I1-GC
11/13/2024
Special inspection requirement — Footing and Foundation
Joseph Jabour
11/13/2024
Special inspection requirement — Concrete - Cast-In-Place
Joseph Jabour
11/13/2024
Special inspection requirement — Subgrade Inspections
Joseph Jabour
11/13/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ESHWAR KOSURI
11/13/2024
Special inspection requirement — Final
Joseph Jabour
11/07/2024
Filed — Alteration
MODIFICATION TO EX PLUMBING SYSTEM AS PER DWGS. NEW DRAINS AT ROOF TO EX LEADERS. INSTALLATION OF NEW ON-SITE DRYWELLS FOR STORMWATER FROM EX BLDG, INCL TRENCH & FLOOR DRAINS, PIPING/CONNECTION. REMOVE PLUMBING FIXTURES IN EX CELLAR TOILETS; CAP AT SOURCE
Q01127096-I1
11/05/2024
Filed — Alteration
FOUNDATION AND EARTHWORK ASSOCIATED WITH NEW ROLL-DOWN GATE AND DRYWELLS IN REAR OPEN SPACE, AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01134392-I1
11/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating02/09/2026
DOB NOWSuspended ScaffoldSigned-offJRR Contracting06/10/2025
DOB NOWGeneral ConstructionSigned-offConcept Construction Service03/07/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding02/19/2025
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding02/19/2025
DOB NOWConstruction FenceSigned-offConcept Construction Service01/03/2025
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating12/11/2024
DOB NOWFoundationSigned-offConcept Construction Service11/19/2024
DOB NOWEarth WorkSigned-offConcept Construction Service11/15/2024
DOB NOWSupport of ExcavationSigned-offConcept Construction Service11/15/2024
DOB NOWGeneral ConstructionSigned-offConcept Construction Service11/13/2024
DOB NOWStructuralSigned-offConcept Construction Service11/13/2024
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/22/2019
DOB NOWConstruction FenceSigned-offPhoenix Sutton STR07/22/2019
BISPLISSUEDBillharz Plumbing08/16/2023
BISPLISSUEDVillage P & H NY07/18/2022
BISSPISSUEDApproved Fire Prevention06/09/2022
BISOTISSUEDSetauket Contracting08/05/2019
BISMHISSUEDSetauket Contracting08/05/2019
BISSPISSUEDApproved Fire Prevention12/27/2018
BISPLISSUEDVillage P & H NY12/13/2018
BISOTISSUEDSetauket Contracting11/20/2018
BISMHISSUEDSetauket Contracting11/17/2018
BISMHISSUEDArista Air Conditioning09/24/2008
BISBLISSUEDBillharz Plumbing01/29/2001
BISPLISSUEDBillharz Plumbing01/29/2001
BIS—ISSUEDL S Sign Co06/02/1998
BISPLISSUEDE.s.consolidated PLG02/11/1998
BIS—ISSUEDL.s.sign Co02/10/1998
BISOTISSUEDCook & Krupa02/02/1998
BISMHISSUEDCook & Krupa07/31/1997
BISOTISSUEDCook & Krupa03/31/1997
BISOTISSUEDWerner KREBS__INC05/28/1993
5 projects · most recent 02/12/2025
General Wiring
FiledStatusContractorScope
02/12/2025CompleteBorowide Elect'l Contractors—
08/05/2022CompleteGlen Oaks ElectricalGeneral Wiring
08/03/2022CompleteGlen Oaks ElectricalGeneral Wiring
06/02/2022CompleteWilldan Electrical of NY—
07/15/2019CompleteElpo Electrical Contg—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/10/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/04/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/29/2025Post-installed AnchorsGeorge Xerakiasspecial
05/29/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
04/07/2025Insulation placement and R valuesJoseph Jabourenergy_progress
04/07/2025Energy Code Compliance InspectionsJoseph Jabourprogress
04/07/2025FinalJoseph Jabourprogress
04/07/2025MasonryJoseph Jabourspecial
04/02/2025Masonry—special
03/31/2025Insulation placement and R valuesJoseph Jabourenergy_progress
03/31/2025Energy Code Compliance InspectionsJoseph Jabourprogress
03/31/2025FinalJoseph Jabourprogress
02/27/2025Excavations - Sheeting, Shoring, and BracingJoseph Jabourspecial
02/25/2025Excavations - Sheeting, Shoring, and BracingJoseph Jabourspecial
11/14/2024Concrete - Cast-In-PlaceJoseph Jabourspecial
11/14/2024Footing and FoundationJoseph Jabourprogress
11/14/2024FinalJoseph Jabourprogress
11/14/2024Subgrade InspectionsJoseph Jabourspecial
11/14/2024Subsurface Investigations (Borings/Test Pits)ESHWAR KOSURIspecial
11/13/2024Footing and FoundationJoseph Jabourprogress
11/13/2024Concrete - Cast-In-PlaceJoseph Jabourspecial
11/13/2024Subgrade InspectionsJoseph Jabourspecial
11/13/2024Subsurface Investigations (Borings/Test Pits)ESHWAR KOSURIspecial
11/13/2024FinalJoseph Jabourprogress
11/05/2024Fire-Resistant Penetrations and JointsJoseph Jabourspecial
10/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJoseph Jabourspecial
10/30/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesESHWAR KOSURIspecial
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Maspeth Federal SavingsBank / Financial branch—
Project Q01134392 Alteration · LOC Issued · 11/05/2024
Project Q01127029 Alteration · LOC Issued · 11/01/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
08/21/2026Q01127096-I1Request digital key ↗
08/21/2026Q01134392-P1Request digital key ↗
08/21/2026Q01134392-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00196434-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00196434-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION17
01/25/2023440513712Open ↗
01/24/2023440513712Open ↗
11/15/2022440513712Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION12
11/16/2023440513712Open ↗
09/20/2022440513712Open ↗
09/15/2022440513712Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026Q00196434-I1Open ↗
08/21/2026Q01127096-I1Open ↗
08/21/2026Q01134392-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/06/2026Q01127029-I1Open ↗
09/02/2026Q01127316-I1Open ↗
08/28/2026Q01233128-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026Q01127316-I1Open ↗
09/02/2026Q01127316-I1Open ↗
08/27/2026Q00196434-I1Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
04/21/2020440519235Open ↗
12/31/2008410162782Open ↗
09/16/2008410162782Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/16/2008410162782Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/16/2008410162782Open ↗
▸Trade Schedules & Equipment19
▸BISEQUIPMENT USE PERMITS8
03/06/2025440513712Open ↗
06/08/2022440513712Open ↗
12/31/2008410162782Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/06/2025440513712Open ↗
03/06/2025440513712Open ↗
12/31/2008410162782Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/20/2019440513712Open ↗
11/14/2019440513712Open ↗
▸BISSCHEDULE B - PLUMBING2
11/07/2022440513712Open ↗
10/30/2018440513712Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/23/2022440513712Open ↗
▸BISSPRINKLER SYSTEMS1
05/23/2022440513712Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/15/2023421925457Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/23/2022440513712Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/28/2026Q00196434-I1Open ↗
▸Environmental & Asbestos12
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU6190QN183
12/15/2023440513712Open ↗
08/12/2021440513703Open ↗
08/12/2021440519235Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
12/13/2018440513712Open ↗
11/20/2018440513703Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/16/2008410162782Open ↗
▸BISDEP ASBESTOS PROJECT CONDITIONAL COMPLETION FORM1
10/30/2018440519235Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026Q01127096-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026Q01127316-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/20/2022440513712Open ↗
08/12/2021440513703Open ↗
10/30/2018440513712Open ↗
Showing 3 of 5 on file for this type
▸BISNYCECC ANALYSIS3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
05/20/2022440513712Open ↗
05/20/2022440513712Open ↗
04/21/2020440519235Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/23/2022440513712Open ↗
08/12/2021440513703Open ↗
▸BISINTERIOR LIGHTING POWER1
05/23/2022440513712Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/21/2020440519235Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/23/2022440513712Open ↗
▸BISLIGHTING CONTROLS1
05/23/2022440513712Open ↗
▸BIS* DUCT LEAKAGE TESTING1
05/23/2022440513712Open ↗
▸BIS* HVAC INSULATION AND SEALING1
05/23/2022440513712Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/20/2022440513712Open ↗
08/12/2021440513703Open ↗
10/30/2018440513712Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSOIL REPORT3
08/21/2026Q01134392-I1Open ↗
08/13/2026Q01127096-I1Open ↗
08/13/2026Q01134392-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01127096-I1Open ↗
08/13/2026Q01134392-I1Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/23/2022440513712Open ↗
▸BISMECHANICAL SYSTEMS1
05/23/2022440513712Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/15/2023440513712Open ↗
06/16/2023421925457Open ↗
05/11/2022400797884Open ↗
Showing 3 of 8 on file for this type
▸BISFINAL1
05/23/2022440513712Open ↗
▸BISSUPERSEDING LETTER1
11/16/2023440513712Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/31/2008410162782Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/16/2008410162782Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT9
06/15/2023421925457Open ↗
05/20/2022440513712Open ↗
04/21/2020440519235Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
06/15/2023421925457Open ↗
05/23/2022440513712Open ↗
08/12/2021440513703Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION4
01/25/2023440513712Open ↗
11/15/2022440513712Open ↗
06/15/2022400375161Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
11/16/2023440513712Open ↗
09/20/2022440513712Open ↗
09/15/2022440513712Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/30/2018440513712Open ↗
10/30/2018440513703Open ↗
10/30/2018440519235Open ↗
▸BISEFILING COVER SHEET2
12/18/2018421925457Open ↗
09/16/2008410162782Open ↗
▸Other Documents7
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01127029-I1Open ↗
08/13/2026Q01134392-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01127316-P1Open ↗
08/13/2026Q01127316-I1Open ↗
▸BISMAINTENANCE INFORMATION1
05/23/2022440513712Open ↗
▸DOB NOWCalculations1
08/13/2026Q01233128-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q01233128-I1Open ↗