← Back
Primarily 2 family with 1 store or office
66-94 FRESH POND ROAD
QUEENS · Ridgewood · BIN 4085039
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6BZoning
6,567 sfGross Floor Area
3Units
3 Open Violations 2 unresolved · 1 paperwork only ▸
Primarily 2 family with 1 store or office · Owner of record: JBSB REALTY LLC · 3,690 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 37p · 2 filings · 20 docs
Floor 25p · 2 filings · 20 docs
Floor 12p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JBSB REALTY3007/08/2026
JBSB REALTY LCC C 0 G BARETTA403/21/2026
CORATO1 PIZZA RESTAURANT103/22/2026
CHASE BANK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DRAFT MASTER ENGINEERING PC407/09/2024
NASIR J, KHANZADA LLC507/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREGG NY PLUMBING, INCPlumbing207/08/2026
ANTHONY MATRONEElectrical103/21/2026
J.H. APONTE ELECTRIC CORPElectrical103/22/2026
MATRONE ANTHONYElectrical103/21/2026
G&B PLUMBING&HEATING CORPPlumbing107/08/2026
STIVAN PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DRAFT MASTER ENGINEERING701307/09/2024
ANTHONY CUCICH ARCHITECT6081107/07/2023
NASIR J. KHANZADA LLC1527507/21/2021
Building Lifecycle
All (59)Filed (9)Permit Issued (4)Signed Off (2)Violation (6)Inspection (6)Objection (6)Special Inspection (26)
03/30/2026
Signed off — Alteration
INSTALLATION OF COMMERCIAL COOKING EQUIPMENT AND PLUMBING FIXTURES FOR EXISTING 1ST FLOOR RESTAURANT
Q00876546-I1
04/18/2025
Permit issued — Plumbing
Q00876546-I1-PL
07/29/2024
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY GURBALL
07/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
ANTHONY CUCICH
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY GURBALL
07/09/2024
Filed — Alteration
INSTALLATION OF COMMERCIAL COOKING EQUIPMENT AND PLUMBING FIXTURES FOR EXISTING 1ST FLOOR RESTAURANT
Q00876546-P3
06/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/27/2024
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY GURBALL
06/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY GURBALL
04/03/2024
Filed — Alteration
INSTALLATION OF COMMERCIAL COOKING EQUIPMENT AND PLUMBING FIXTURES FOR EXISTING 1ST FLOOR RESTAURANT
Q00876546-P2
02/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/05/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/30/2023
Permit issued — Plumbing
Q00876546-I1-PL
10/27/2023
Filed — Alteration
INSTALLATION OF COMMERCIAL COOKING EQUIPMENT AND PLUMBING FIXTURES FOR EXISTING 1ST FLOOR RESTAURANT
Q00876546-P1
07/17/2023
Objection resolved — Addressed
07/17/2023
Objection resolved — Addressed
07/14/2023
Objection raised — Other
07/14/2023
Objection raised — Inspections
07/07/2023
Filed — Alteration
INSTALLATION OF COMMERCIAL COOKING EQUIPMENT AND PLUMBING FIXTURES FOR EXISTING 1ST FLOOR RESTAURANT
Q00876546-I1
05/04/2023
Violation issued (HPD, open)
B
09/07/2021
Violation issued (ECB, closed)
Plumbing
08/13/2021
Signed off — Alteration
APPLOCATION FILED FOR INSTALLATION OF TANKLESS COMBI BOILER AT 2ND AND 3RD FLOOR
Q00530028-I1
08/10/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/30/2021
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
07/22/2021
Special inspection requirement — Maintenance information
Nasir Khanzada
07/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
07/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
07/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
07/21/2021
Filed — Alteration
APPLOCATION FILED FOR INSTALLATION OF TANKLESS COMBI BOILER AT 2ND AND 3RD FLOOR
Q00530028-P1
07/21/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
07/20/2021
Special inspection requirement — Maintenance information
Nasir Khanzada
07/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
07/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
07/14/2021
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
06/24/2021
Permit issued — Boiler Equipment
Q00530028-I1-BE
05/27/2021
Filed — Alteration
APPLOCATION FILED FOR INSTALLATION OF TANKLESS COMBI BOILER AT 2ND AND 3RD FLOOR
Q00530028-I1
04/09/2021
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE INCONJUCTION WITH ALT 2 APPLICATION # 421796426
Q00439431-P2
04/09/2021
Special inspection requirement — HVAC and service water heating system controls
Nasir Khanzada
04/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
04/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
04/09/2021
Special inspection requirement — HVAC and service water heating equipment
Nasir Khanzada
04/09/2021
Special inspection requirement — HVAC insulation and sealing
Nasir Khanzada
04/09/2021
Special inspection requirement — Maintenance information
Nasir Khanzada
02/18/2021
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE INCONJUCTION WITH ALT 2 APPLICATION # 421796426
Q00439431-P1
02/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
02/18/2021
Special inspection requirement — Maintenance information
Nasir Khanzada
02/18/2021
Special inspection requirement — HVAC and service water heating equipment
Nasir Khanzada
02/18/2021
Special inspection requirement — HVAC and service water heating system controls
Nasir Khanzada
02/18/2021
Special inspection requirement — HVAC insulation and sealing
Nasir Khanzada
02/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
01/26/2021
Permit issued — Plumbing
Q00439431-I1-PL
12/15/2020
Objection raised — Other
12/15/2020
Objection resolved — Addressed
12/11/2020
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE INCONJUCTION WITH ALT 2 APPLICATION # 421796426
Q00439431-I1
01/26/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/13/2010
Violation issued (ECB, closed)
Construction
04/17/2009
Violation issued (ECB, open)
Construction
02/06/1991
Violation issued (ECB, closed)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDARINKO PLUMBING CO04/18/2025
DOB NOWPlumbingSigned-offSTIVAN PLBG & HTG INC11/30/2023
DOB NOWBoiler EquipmentSigned-offGREGG NY PLUMBING, INC06/24/2021
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC01/26/2021
BISOTISSUEDVERITAS SERVICES, INC09/16/2020
BISOTISSUEDSHAW CONTRACTING INC01/31/2018
BISMHISSUEDPERFORMANCE MECHANCIAL04/26/2011
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR10/15/2004
BISMHISSUEDIBEX CONSTRUCTION COMPANY09/09/2004
BISEQISSUEDIBEX CONSTRUCTION COMPANY09/09/2004
BISFPISSUEDFIRE FOE SYSTEM CORP.10/30/2003
BISFPISSUEDACCURATE FIRE PROTECTION SYSTEM08/01/2003
BISEQISSUEDM.B.M. GENERAL CONSTRUCTION02/13/2002
BISOTISSUEDM.B.M. GENERAL CONSTRUCTION02/13/2002
BISFPISSUEDMASTER FIRE PREVENTION SYSSTEM01/02/1992
1 project · most recent 04/09/2021
Gas Water/Sanitary
FiledStatusContractorScope
04/09/2021Signed-offGREGG NY PLUMBING, INCGas, Water/Sanitary
2 projects · most recent 11/08/2020
General Wiring
FiledStatusContractorScope
11/08/2020CompleteKINGS ELECTRIC CO., INC.General Wiring
09/23/2019CompleteJ.H. APONTE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
12/05/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/10/2021Pass-Final Boiler Equipment InspectionPassView ↗
07/30/2021Fail-Final Boiler Equipment InspectionFailView ↗
07/14/2021Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/29/2024Energy Code Compliance InspectionsANTHONY GURBALLprogress
07/29/2024Tenant Protection Plan ComplianceANTHONY CUCICHspecial
07/29/2024Fire-Resistant Penetrations and JointsANTHONY GURBALLspecial
06/27/2024Tenant Protection Plan Compliance—special
06/27/2024Energy Code Compliance InspectionsANTHONY GURBALLprogress
06/27/2024Fire-Resistant Penetrations and JointsANTHONY GURBALLspecial
07/22/2021Maintenance informationNasir Khanzadaenergy_progress
07/22/2021Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
07/22/2021HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
07/22/2021HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
07/21/2021Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
07/20/2021Maintenance informationNasir Khanzadaenergy_progress
07/20/2021HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
07/20/2021HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
04/09/2021HVAC and service water heating system controls Nasir Khanzadaenergy_progress
04/09/2021Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
04/09/2021Energy Code Compliance InspectionsNasir Khanzadaprogress
04/09/2021HVAC and service water heating equipment Nasir Khanzadaenergy_progress
04/09/2021HVAC insulation and sealing Nasir Khanzadaenergy_progress
04/09/2021Maintenance informationNasir Khanzadaenergy_progress
02/18/2021Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
02/18/2021Maintenance informationNasir Khanzadaenergy_progress
02/18/2021HVAC and service water heating equipment Nasir Khanzadaenergy_progress
02/18/2021HVAC and service water heating system controls Nasir Khanzadaenergy_progress
02/18/2021HVAC insulation and sealing Nasir Khanzadaenergy_progress
Latest 25 of 26.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing3
08/27/2026Q00439431-P2Request digital key ↗
08/15/2026Q00439431-P1Request digital key ↗
08/15/2026Q00439431-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/27/2026Q00530028-I1Request digital key ↗
08/27/2026Q00530028-P1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION8
10/07/2019421796426Open ↗
04/11/2019421598113Open ↗
01/31/2018421598113Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
11/05/2020421796426Open ↗
10/07/2019421796426Open ↗
02/01/2018421598113Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications50
▸DOB NOWProgress Inspector Seal & Signature18
09/29/2026Q00439431-P2Open ↗
09/29/2026Q00439431-P2Open ↗
09/29/2026Q00439431-P2Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
10/07/2019421796426Open ↗
05/04/2019421598113Open ↗
05/04/2019421598113Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/29/2026Q00439431-P2Open ↗
09/22/2026Q00530028-P1Open ↗
09/01/2026Q00439431-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00439431-P2Open ↗
08/27/2026Q00439431-P1Open ↗
08/27/2026Q00439431-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/07/2019421796426Open ↗
01/31/2018421598113Open ↗
06/09/2009420027330Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/07/2019421796426Open ↗
01/31/2018421598113Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/19/2009420027330Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/09/2009420027330Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS2
07/22/2011420312076Open ↗
07/22/2011420312076Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/22/2011420312076Open ↗
▸Safety & Tenant Protection3
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/07/2019421796426Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
10/07/2019421796426Open ↗
▸BISTenant Protection Plan and Notes1
01/31/2018421598113Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00439431-P2Open ↗
08/27/2026Q00439431-P1Open ↗
08/15/2026Q00439431-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/04/2011420312076Open ↗
06/09/2009420027330Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/07/2019421796426Open ↗
01/31/2018421598113Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/07/2019421796426Open ↗
02/01/2018421598113Open ↗
01/31/2018421598113Open ↗
▸BISTECHNICAL REPORT: ENERGY2
07/22/2011420312076Open ↗
04/04/2011420312076Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/04/2019421598113Open ↗
07/22/2011420312076Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00530028-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/08/2019421598113Open ↗
07/22/2011420312076Open ↗
02/04/2011420027330Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
04/04/2011420312076Open ↗
03/09/2011420312076Open ↗
06/09/2009420027330Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/05/2020421796426Open ↗
07/22/2011420312076Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
10/07/2019421796426Open ↗
05/04/2019421598113Open ↗
01/31/2018421598113Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
10/07/2019421796426Open ↗
01/31/2018421598113Open ↗
06/09/2009420027330Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
11/05/2020421796426Open ↗
▸BISADDITIONAL INFORMATION1
04/11/2019421598113Open ↗