← Back
BuildNYC
Two family converted from one family
66 BAY 22 STREET
BROOKLYN · Bensonhurst · BIN 3166778
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R5Zoning
2,536 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: T & T Capital · 4,833 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 20 docs
AtticUnder Construction6p · 1 filing · 3 docs
Floor 2Under Construction33p · 2 filings · 20 docs
Floor 1Under Construction34p · 2 filings · 20 docs
CellarUnder Construction37p · 2 filings · 20 docs
BasementUnder Construction30p · 1 filing · 20 docs
Site & exteriorTemporary construction fenceUnder Construction20p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T & T Capital2710/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/17/2024$1.7M—Private party → T & T Capital$670/sf building
03/08/2024$1.4M—Private party → Private party$532/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL Engineering1310/06/2026
Gavin Kwan109/05/2025
Yang Engineering101/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z Building NY1003/21/2026
SD Design Studio403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Acer ConstructionGeneral Contractor509/07/2026
Wing Jay ConstructionGeneral Contractor210/01/2026
Acer ConstructionScaffold207/08/2026
Wing Jay ConstructionScaffold110/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jian Engineering7397807/09/2026
Building Lifecycle
10/20/2026
Objection raised — Other
10/16/2026
Objection raised — Other
10/16/2026
Objection raised — Structural
10/06/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed support of excavation construction filing in conjunction with ALT-CO job#B01191516-I1.
B01191516-S9
10/06/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Proposed support of excavation construction filing in conjunction with ALT-CO job#B01191516-I1.
B01191516-S8
90 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedWing Jay Construction09/30/2026
DOB NOWStructuralPermit IssuedWing Jay Construction09/30/2026
DOB NOWGeneral ConstructionPermit IssuedWing Jay Construction09/30/2026
DOB NOWGeneral ConstructionPermit IssuedAcer Construction08/31/2026
DOB NOWStructuralPermit IssuedAcer Construction06/15/2026
DOB NOWSupport of ExcavationPermit IssuedAcer Construction06/12/2026
DOB NOWFoundationPermit IssuedAcer Construction06/12/2026
DOB NOWConstruction FencePermit IssuedAcer Construction05/21/2026
DOB NOWStructuralPermit IssuedAcer Construction05/18/2026
DOB NOWConstruction FencePermit IssuedAcer Construction01/23/2025
1 project · most recent 10/06/2026
Sprinkler System
FiledStatusContractorScope
10/06/2026——Sprinkler System
1 project · most recent 10/06/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/06/2026——Storm, Water/Sanitary
1 project · most recent 11/03/2026
General Wiring
FiledStatusContractorScope
11/03/2026Permit IssuedNY Forever ElectricGeneral Wiring
1 project · most recent 10/06/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/06/2026Permit IssuedWing Jay ConstructionSteel, Concrete, Masonry
1 project · most recent 01/23/2025
Fence
FiledStatusContractorScope
01/23/2025Permit IssuedWing Jay ConstructionFence
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
08/12/2026Fire-Resistant Penetrations and Joints—special
08/12/2026Post-installed Anchors—special
08/12/2026Sprinkler Systems—special
08/12/2026HVAC-R and service water heating equipment—energy_progress
08/12/2026HVAC-R and service water piping design and insulation—energy_progress
08/12/2026HVAC-R and service water heating system controls—energy_progress
08/12/2026Energy Code Compliance Inspections—progress
08/12/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/17/2026MasonryJIAN DENGspecial
07/17/2026Construction Operations Influencing Adjacent StructuresJIAN DENGspecial
07/17/2026Structural Steel - WeldingJIAN DENGspecial
07/17/2026Structural Steel - High Strength BoltingJIAN DENGspecial
07/17/2026Structural Cold-Formed SteelJIAN DENGspecial
07/17/2026Structural Steel - DetailsJIAN DENGspecial
07/17/2026Concrete - Cast-In-PlaceJIAN DENGspecial
07/17/2026Structural Stability – Alterations of existing buildingsJIAN DENGspecial
07/17/2026FinalJIAN DENGprogress
07/13/2026FinalJIAN DENGprogress
07/13/2026Footing and FoundationJIAN DENGprogress
07/13/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/13/2026Concrete - Cast-In-PlaceJIAN DENGspecial
07/13/2026Structural Stability – Alterations of existing buildingsJIAN DENGspecial
07/13/2026Construction Operations Influencing Adjacent StructuresJIAN DENGspecial
07/13/2026Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
07/08/2026Construction Operations Influencing Adjacent StructuresJIAN DENGspecial
Latest 25 of 85.
99 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account