| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/03/2026 | — | — | Air Conditioning Systems | Cooling Daikin RXYA192AATJA 16 tons · Vrf Outdoor ×1 |
| 03/29/2025 | Permit Issued | THE METRO GROUP, INC | Cooling Towers | Cooling Tower Baltimore Aircoil S15E-1285-07LN-2 100,620 CFM · Cooling Tower ×1 |
| 11/04/2022 | — | — | Air Conditioning Systems, Heating and Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/04/2022 | — | — | — |
| 06/10/2020 | Permit Issued | J. CAIAZZO PLBG & HTG COR | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Permit Issued | DEPENDABLE MECH CORP | Gas, Water/Sanitary |
| 10/19/2024 | Signed-off | JMW PLUMBING, INC | Gas, Water/Sanitary |
| 05/20/2023 | — | — | Gas |
| 11/04/2022 | — | — | Gas, Water/Sanitary |
| 06/10/2020 | Permit Issued | J. CAIAZZO PLBG & HTG COR | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/21/2025 | Complete | CENTURY ELECTRIC LLC | General Wiring |
| 06/05/2025 | Complete | THE METRO GROUP ELECTRIC | General Wiring |
| 11/09/2024 | Complete | AN-K ELECTRIC LLC | General Wiring |
| 06/27/2024 | Complete | AV GROUP ELECTRICAL LLC | General Wiring |
| 06/11/2024 | Permit Issued | HIGH QUALITY ELECTRIC OF | — |
| 01/23/2024 | Complete | KET ELECTRIC LLC | General Wiring |
| 07/17/2023 | Complete | ROTOR ELECTRIC LLC | — |
| 07/06/2023 | Complete | AV GROUP ELECTRICAL LLC | General Wiring |
| 05/22/2023 | Complete | ROTOR ELECTRIC LLC | — |
| 10/19/2022 | Complete | ARC POWER ELECL CONTS INC | — |
| 09/07/2022 | Permit Issued | Y.S ELECTRIC | General Wiring, Lighting |
| 07/07/2022 | Complete | A+ ELECTRIC OF GREATER NY | General Wiring |
| 04/15/2021 | Complete | Y.S ELECTRIC | General Wiring, Lighting |
| 09/01/2020 | Complete | CENTURY ELECTRIC LLC | General Wiring |
| 03/09/2020 | Complete | INTER CONNECTION ELETRIC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | Permit Issued | CEPRINE CONSTRUCTION INC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | Permit Issued | PRESERV BLDNG RST MNGMT I | Suspended Scaffold (SC) |
| Owner | Filings | Most Recent |
|---|---|---|
| FIRSTSERVICE RESIDENTIAL | 6 | 09/13/2026 |
| KINGS GROUP NY | 20 | 07/08/2026 |
| FIRST SERVICE RESIDENTIAL | 9 | 07/08/2026 |
| AAC REALTY | 14 | 07/08/2026 |
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 19 | 07/08/2026 |
| FIRSTSERVICE PROJECT MANAGEMENT | 3 | 03/22/2026 |
| CEPRINE CONSTRUCTION | 2 | 03/22/2026 |
| ASHKENAZY ACQUISITION | 7 | 03/22/2026 |
| TEXTILE BUILDING CONDOMINIUM | 96 | 03/22/2026 |
| 66 LEONARD RETAILER OWNER LLC | 27 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| KN3 ENGINEERING LLC | 6 | 08/04/2026 |
| GCA CONSULTANTS, LLC | 4 | 08/03/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 10 | 06/09/2026 |
| STEPHEN B JACOBS GROUP | 2 | 05/18/2026 |
| ALLEN + KILLCOYNE ARCHITECTS LLP | 2 | 10/02/2025 |
| KENDALL ENGINEERING PC | 3 | 09/30/2025 |
| MG ENGINEERING D.P.C. | 8 | 06/25/2025 |
| BRYCE TAYLOR, ARCHITECT | 1 | 06/04/2025 |
| NEW AGE ENGINEERING PLLC | 2 | 03/29/2025 |
| TREAD A&D LLC | 2 | 03/19/2025 |
| MUNYC ARCHITECTURE PLLC | 4 | 10/19/2024 |
| SOUTH PARK CONSULTING LLC | 2 | 10/16/2024 |
| PAUL PERDEK, PROF. ENG. PLLC | 3 | 09/19/2024 |
| LAWLESS & MANGIONE | 2 | 05/21/2024 |
| JACOBSON SHINODA ARCHITECTS | 1 | 05/20/2023 |
| NORA ALHASAN | 2 | 12/14/2022 |
| EDG | 1 | 11/04/2022 |
| CONSTRUCT ARCHITECTURE STUDIO | 2 | 09/02/2022 |
| COSMO VENEZIALE, ARCHITECT, P.L.L.C | 3 | 06/15/2022 |
| COWLEY ENGINEERING, PC | 4 | 06/14/2022 |
| MDG DESIGN GROUP | 2 | 03/28/2022 |
| MCKAY ARCHITECTURE AND DESIGN PLLC | 1 | 03/03/2022 |
| D'ANTONIO CONSULTING ENGINEERS | 1 | 07/06/2020 |
| TAN ENGINEERING PC | 1 | 06/10/2020 |
| HAIDER ENGINEERING, P.E. | 4 | 11/08/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| GREEN LIGHT EXPEDITING LLC | 4 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 4 | 03/21/2026 |
| Rigid Structural Design, LLC | 16 | 03/21/2026 |
| METROPOLIS GROUP INC | 14 | 03/21/2026 |
| THERESA VOLTAGGIO | 4 | 03/21/2026 |
| RITE ONE EXPEDITING | 1 | 03/21/2026 |
| GRAND EXPEDITERS NYC | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 14 | 03/21/2026 |
| GANCI LOGOZZO | 6 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| KINGS GROUP NY CORP | General Contractor | 15 | 07/08/2026 |
| PRESERV BLD RESTOR MGT IN | General Contractor | 13 | 07/08/2026 |
| ARTISAN PRESERVATION LLC | General Contractor | 9 | 03/21/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 8 | 08/16/2026 |
| A1-TECH-CONSTRUCTION CORP | General Contractor | 7 | 07/08/2026 |
| NICHIBI ORGANIZATION INC | General Contractor | 4 | 03/21/2026 |
| SAHARA CONTRACTING CORP | General Contractor | 3 | 07/08/2026 |
| THE METRO GROUP, INC | General Contractor | 3 | 03/21/2026 |
| HI-TECH C.P.M. CORP | General Contractor | 3 | 07/08/2026 |
| HI-TECH PLUMBING & HEATING | Plumbing | 2 | 07/08/2026 |
| GRAHAM, EDWARD | Fire Protection | 2 | 03/21/2026 |
| SELCA CONSTRUCTION INC | General Contractor | 2 | 03/21/2026 |
| AVON PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 2 | 07/08/2026 |
| DK CONSTRUCTION ONE, CORP | General Contractor | 2 | 07/08/2026 |
| TESTERMAN PLBG & HTG INC | Plumbing | 1 | 07/08/2026 |
| ROTOR ELECTRIC LLC | Electrical | 1 | 03/22/2026 |
| AVON PLBG & HTG INC | Fire Protection | 1 | 07/08/2026 |
| J. CAIAZZO PLBG & HTG CORP | Fire Protection | 1 | 07/08/2026 |
| C/ZONE, INC | General Contractor | 1 | 07/08/2026 |
| FRANCHISE INTERIOR DEVELO | General Contractor | 1 | 07/08/2026 |
| VENEZIA INTERIORS CORP | General Contractor | 1 | 07/08/2026 |
| ARCON PLBG SOLUTIONS | Plumbing | 1 | 07/08/2026 |
| DPH PLUMBING & HTG CORP | Plumbing | 1 | 07/08/2026 |
| EH PLUMBING & HEATING COR | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| LEO Y LEE ASSOCIATES | 2481 | 6 | 08/04/2026 |
| JL SPECIAL INSPECTIONS LL | 9500 | 6 | 08/03/2026 |
| PSI AGENCY INC. | 254 | 5 | 10/02/2025 |
| PROJECT TACTICAL SOLUTION | 5859 | 8 | 06/25/2025 |
| BRYCE TAYLOR, ARCHITECT | 8102 | 1 | 06/04/2025 |
| KENDALL ENGINEERING PC | 4154 | 1 | 04/09/2025 |
| NEW AGE ENGINEERING PLLC | 7746 | 2 | 03/29/2025 |
| MUNYC ARCHITECTURE PLLC | 5224 | 3 | 10/19/2024 |
| ESNYC CONSULTING INC | 4099 | 2 | 10/19/2024 |
| RHL ENGINEERING, LLC | 712 | 3 | 10/19/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 08/14/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | PRESERV BLDNG RST MNGMT I | 08/03/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | CEPRINE CONSTRUCTION INC | 07/10/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 05/22/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 05/19/2026 |
| DOB NOW | General Construction | Permit Issued | PRESERV BLD RESTOR MGT IN | 03/26/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 12/30/2025 |
| DOB NOW | General Construction | Permit Issued | PRESERV BLD RESTOR MGT IN | 12/30/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 12/30/2025 |
| DOB NOW | Plumbing | Signed-off | HI-TECH PLUMBING & HEATIN | 10/21/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 09/19/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 09/19/2025 |
| DOB NOW | General Construction | Signed-off | A1-TECH-CONSTRUCTION CORP | 09/16/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 09/12/2025 |
| DOB NOW | Plumbing | Signed-off | AVON PLBG & HTG INC | 07/31/2025 |
| DOB NOW | General Construction | Permit Issued | PRESERV BLD RESTOR MGT IN | 07/31/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | CEPRINE CONSTRUCTION INC | 07/18/2025 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 07/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | DK CONSTRUCTION ONE, CORP | 07/10/2025 |
| DOB NOW | General Construction | Signed-off | SAHARA CONTRACTING CORP | 06/30/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 05/29/2025 |
| DOB NOW | General Construction | Signed-off | DK CONSTRUCTION ONE, CORP | 05/08/2025 |
| DOB NOW | General Construction | Signed-off | A1-TECH-CONSTRUCTION CORP | 04/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | THE METRO GROUP, INC | 04/03/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | PRESERV BLDNG RST MNGMT I | 12/19/2024 |
| DOB NOW | Plumbing | Signed-off | HI-TECH PLUMBING & HEATIN | 11/07/2024 |
| DOB NOW | General Construction | Signed-off | A1-TECH-CONSTRUCTION CORP | 10/25/2024 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 09/24/2024 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 09/23/2024 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PRESERV BLD RESTOR MGT IN | 09/13/2024 |
| DOB NOW | General Construction | Permit Issued | PRESERV BLD RESTOR MGT IN | 08/08/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | PRESERV BLDNG RST MNGMT I | 07/24/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | CEPRINE CONSTRUCTION INC | 07/18/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 06/04/2024 |
| DOB NOW | General Construction | Signed-off | NICHIBI ORGANIZATION INC | 06/26/2023 |
| DOB NOW | General Construction | Signed-off | C/ZONE, INC | 03/24/2023 |
| DOB NOW | Plumbing | Signed-off | DPH PLUMBING & HTG CORP | 02/09/2023 |
| DOB NOW | General Construction | Signed-off | SELCA CONSTRUCTION | 02/02/2023 |
| DOB NOW | Sprinklers | Signed-off | AVON PLBG & HTG INC | 10/21/2022 |
| DOB NOW | Plumbing | Signed-off | AVON PLBG & HTG INC | 10/21/2022 |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/01/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/06/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/01/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/24/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/15/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 08/11/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/06/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/22/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/08/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/02/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/28/2023 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 11/14/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/14/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/01/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/21/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/03/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/03/2022 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 08/09/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/10/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/18/2026 | Post-installed Anchors | Leo Lee | special |
| 08/18/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Leo Lee | special |
| 08/04/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Leo Lee | special |
| 08/04/2026 | Post-installed Anchors | Leo Lee | special |
| 07/10/2026 | Tenant Protection Plan Compliance | Joshua Lowrance | special |
| 07/06/2026 | Tenant Protection Plan Compliance | Joshua Lowrance | special |
| 07/06/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Joshua Lowrance | special |
| 06/30/2026 | Tenant Protection Plan Compliance | Joshua Lowrance | special |
| 06/30/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Joshua Lowrance | special |
| 05/18/2026 | Tenant Protection Plan Compliance | Joshua Lowrance | special |
| 02/11/2026 | Final | Joshua Lowrance | progress |
| 02/11/2026 | Tenant Protection Plan Compliance | Joshua Lowrance | special |
| 02/11/2026 | Energy Code Compliance Inspections | Joshua Lowrance | progress |
| 02/11/2026 | Mechanical Systems | Joshua Lowrance | special |
| 02/11/2026 | Fire-Resistance Rated Construction | Joshua Lowrance | progress |
| 02/11/2026 | Fire-Resistant Penetrations and Joints | Joshua Lowrance | special |
| 11/04/2025 | Tenant Protection Plan Compliance | MAURICIO ANDRADE | special |
| 11/04/2025 | Final | Stephen Killcoyne | progress |
| 11/04/2025 | Post-installed Anchors | MAURICIO ANDRADE | special |
| 11/04/2025 | Fire-Resistance Rated Construction | Stephen Killcoyne | progress |
| 11/04/2025 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 10/03/2025 | Tenant Protection Plan Compliance | MAURICIO ANDRADE | special |
| 10/03/2025 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 10/03/2025 | Post-installed Anchors | MAURICIO ANDRADE | special |
| 10/01/2025 | Final | Stephen Killcoyne | progress |