← Back
Large suburban residence
66 MICHAEL LOOP
💬 Discuss this project
1999Year Built
2Stories
A3Building Class
R3-2Zoning
2,432 sfGross Floor Area
1Units
Large suburban residence · 4,840 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/09/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/09/2024
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/15/2024
Permit issued — Solar
S01091183-I1-SL
08/09/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01091183-I1
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/05/2024
Special inspection requirement — Final
Walid Abdulla
08/05/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/15/2024
1 project · most recent 08/09/2024
FiledStatusContractorScope
08/09/2024CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 08/09/2024
FiledStatusContractorScope
08/09/2024Signed-offSUNRUN INSTALLATION SVC12 panels, 4.92 kw, 253.6 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/05/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/05/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/05/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/05/2024FinalWalid Abdullaprogress
08/05/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01091183-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026S01091183-I1Open ↗
08/31/2026S01091183-I1Open ↗
08/31/2026S01091183-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026S01091183-I1Open ↗
08/31/2026S01091183-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01091183-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01091183-I1Open ↗