← Back
Two stories - detached, small or mid-size
66 SCRIBNER AVENUE
STATEN ISLAND · St. George-New Brighton · BIN 5000743
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R3AZoning
1,850 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,800 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Roof1p · 1 filing · 11 docs
Floor 11p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC210/31/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACORN ENERGY SOLUTIONSLLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854210/31/2025
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (4)
12/23/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS USE OR OCCUPANCY
S01280698-I1
11/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
11/03/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
11/03/2025
Special inspection requirement — Final
TOM PETERSEN
11/03/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
10/31/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS USE OR OCCUPANCY
S01280698-P1
09/11/2025
Permit issued — Solar
S01280698-I1-SL
09/03/2025
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS USE OR OCCUPANCY
S01280698-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offACORN ENERGY SOLUTIONS09/11/2025
2 projects · most recent 07/29/2025
General Wiring
FiledStatusContractorScope
07/29/2025Permit Issued3 WAY ELECTRIC INCGeneral Wiring
07/29/2025Complete3 WAY ELECTRIC INC—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/03/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
11/03/2025Energy Code Compliance InspectionsTOM PETERSENprogress
11/03/2025FinalTOM PETERSENprogress
11/03/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026S01280698-I1Request digital key ↗
08/18/2026S01280698-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026S01280698-I1Open ↗
08/28/2026S01280698-I1Open ↗
08/28/2026S01280698-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026S01280698-I1Open ↗
08/13/2026S01280698-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026S01280698-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026S01280698-I1Open ↗
08/13/2026S01280698-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01280698-I1Open ↗