← Back
Condo, residential unit in elevator building
St Nicholas Court Condominium
66 ST NICHOLAS AVENUE · Harlem (South) · BIN 1055030
💬 Discuss this project
1915Year Built
7Stories
R4Building Class
R7-2Zoning
47,419 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized39 Open Violations 37 unresolved · 2 paperwork only ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: ST NICHOLAS COURT CONDO CORP · 10,111 sf lot · 4.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof1p · 1 filing · 9 docs
Floor 11p · 1 filing · 2 docs
Cellar7p · 1 filing · 20 docs
Site & exterior9p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ST NICHOLAS AVENUE COURT CONDO703/21/2026
KINGS GROUP NY CORP503/22/2026
B H B CONSTRUCTION303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SRS ARCHITECT, PC206/13/2025
ANGELOS GEORGOPOULOS, P.C.405/30/2025
ASHRAF CORP104/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMA DESIGNS LLC203/21/2026
PS ENGINEERS203/21/2026
SRS ARCHITECT PC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXCEL RESTORATION INCGeneral Contractor504/09/2026
KINGS GROUP NY CORPGeneral Contractor303/21/2026
ALEXANDER EUGENEElectrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
GREGORY PAPANTONIOUElectrical103/21/2026
IRVING BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AP PROFESSIONAL ENGINEERI5974306/13/2025
SRS ARCHITECT, PC2434206/13/2025
AMARACON TESTING & INSPEC5842305/30/2025
DEAN MENDEZ ARCHITECT, P.8621305/17/2024
Building Lifecycle
All (120)Filed (8)Permit Issued (5)Signed Off (4)Facade (FISP) (12)Violation (60)Objection (12)Special Inspection (19)
01/06/2026
Signed off — Alteration
CONCRETE FOOTINGS AT NEW LALLY COLUMNS IN THE CELLAR AND FIREPROOFING OF STEEL MEMBERS.
M00892718-S1
07/30/2025
Signed off — Alteration
EXTERIOR FACADE RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED TO BE FILED SEPARATELY.
M00891540-I1
07/08/2025
Signed off — Alteration
CONCRETE FOOTINGS AT NEW LALLY COLUMNS IN THE CELLAR AND FIREPROOFING OF STEEL MEMBERS.
M00892718-I1
06/26/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC
M01039099-I1
06/13/2025
Filed — Alteration
EXTERIOR FACADE RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED TO BE FILED SEPARATELY.
M00891540-P1
06/04/2025
Violation issued (HPD, closed)
A
05/30/2025
Filed — Alteration
CONCRETE FOOTINGS AT NEW LALLY COLUMNS IN THE CELLAR AND FIREPROOFING OF STEEL MEMBERS.
M00892718-P3
05/22/2025
Cycle 9 facade report signed — SWARMP
05/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/09/2025
Special inspection requirement — Sprayed fire-resistant materials
CONNIE PISANI
05/09/2025
Special inspection requirement — Footing and Foundation
Angelos Georgopoulos
05/09/2025
Special inspection requirement — Final
Angelos Georgopoulos
05/01/2025
Cycle 9 facade inspection completed
05/01/2025
Special inspection requirement — Final
Silvia Schlaen
05/01/2025
Special inspection requirement — Masonry
Silvia Schlaen
05/01/2025
Special inspection requirement — Post-installed Anchors
GURVINDER SINGH
05/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/20/2025
Cycle 9 facade report submitted
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/22/2024
Violation issued (HPD, closed)
I
11/13/2024
Permit issued — Foundation
M00892718-S1-GC-CX
10/16/2024
Filed — Alteration
CONCRETE FOOTINGS AT NEW LALLY COLUMNS IN THE CELLAR AND FIREPROOFING OF STEEL MEMBERS.
M00892718-P2
10/08/2024
Special inspection requirement — Final
Angelos Georgopoulos
10/08/2024
Special inspection requirement — Sprayed fire-resistant materials
CONNIE PISANI
10/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/08/2024
Special inspection requirement — Footing and Foundation
Angelos Georgopoulos
09/18/2024
Violation issued (ECB, closed)
Construction
06/07/2024
Permit issued — Structural
M00892718-I1-ST
05/24/2024
Objection resolved — Addressed
05/17/2024
Filed — Alteration
CONCRETE FOOTINGS AT NEW LALLY COLUMNS IN THE CELLAR AND FIREPROOFING OF STEEL MEMBERS.
M00892718-S1
05/17/2024
Objection raised — Scope
05/02/2024
Permit issued — Suspended Scaffold
M01034282-I1-SC
05/01/2024
Objection raised — Other
05/01/2024
Objection resolved — Addressed
05/01/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FRANCISCO PEREZ
04/30/2024
Objection raised — Other
04/30/2024
Objection resolved — Addressed
04/30/2024
Objection resolved — Addressed
04/26/2024
Permit issued — Sidewalk Shed
M01039099-I1-SH
04/25/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC
M01039099-I1
04/17/2024
Permit issued — General Construction
M00891540-I1-GC
04/17/2024
Objection raised — Admin
04/16/2024
Filed — Alteration
CONCRETE FOOTINGS AT NEW LALLY COLUMNS IN THE CELLAR AND FIREPROOFING OF STEEL MEMBERS.
M00892718-I1
04/12/2024
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FAADE RESTORATION AND INSPECTION.
M01034282-I1
04/11/2024
Objection resolved — Addressed
04/09/2024
Special inspection requirement — Structural Steel - High Strength Bolting
GURVINDER SINGH
04/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GURVINDER SINGH
04/08/2024
Objection resolved — Addressed
04/04/2024
Special inspection requirement — Structural Steel - Welding
GURVINDER SINGH
04/03/2024
Special inspection requirement — Structural Steel - Details
GURVINDER SINGH
04/02/2024
Filed — Alteration
EXTERIOR FACADE RESTORATION AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. SIDEWALK SHED TO BE FILED SEPARATELY.
M00891540-I1
04/02/2024
Objection raised — Scope
04/02/2024
Objection raised — Scope
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
06/19/2023
Special inspection requirement — Final
Angelos Georgopoulos
05/16/2023
Violation issued (ECB, closed)
Construction
01/27/2023
Violation issued (ECB, closed)
Construction
11/22/2022
Violation issued (ECB, closed)
Construction
05/27/2022
Violation issued (HPD, closed)
A
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offEXCEL RESTORATION11/13/2024
DOB NOWStructuralSigned-offEXCEL RESTORATION06/07/2024
DOB NOWSuspended ScaffoldPermit IssuedMUGHAL GENERAL CONST. INC05/02/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP04/26/2024
DOB NOWGeneral ConstructionSigned-offEXCEL RESTORATION04/17/2024
BISPLISSUEDTW PLUMBING & HEATING INC03/23/2016
BISOTISSUEDNO LIMIT CONTRACTING INC03/15/2016
BISEQISSUEDB H & B CONSTRUCTION INC03/18/2014
BISOTISSUEDABUL KALAM10/29/2013
BISEQISSUEDB H & B CONSTRUCTION INC06/21/2013
BISOTISSUEDABUL KALAM11/03/2011
BISEQISSUEDCOLGATE SCAFFOLDING02/16/1995
2 projects · most recent 04/29/2024
FiledStatusContractorScope
04/29/2024CompleteHIGH QUALITY ELECTRIC OF—
06/15/2023CancelledBOROWIDE ELECT'L CONTR'S—
1 project · most recent 04/12/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/12/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/12/2025Tenant Protection Plan Compliance—special
05/09/2025Sprayed fire-resistant materialsCONNIE PISANIspecial
05/09/2025Footing and FoundationAngelos Georgopoulosprogress
05/09/2025FinalAngelos Georgopoulosprogress
05/01/2025FinalSilvia Schlaenprogress
05/01/2025MasonrySilvia Schlaenspecial
05/01/2025Post-installed AnchorsGURVINDER SINGHspecial
05/01/2025Tenant Protection Plan Compliance—special
10/08/2024FinalAngelos Georgopoulosprogress
10/08/2024Sprayed fire-resistant materialsCONNIE PISANIspecial
10/08/2024Tenant Protection Plan Compliance—special
10/08/2024Footing and FoundationAngelos Georgopoulosprogress
05/01/2024Alternative Materials - OTCR Buildings Bulletin NumberFRANCISCO PEREZspecial
04/09/2024Structural Steel - High Strength BoltingGURVINDER SINGHspecial
04/09/2024Structural Stability – Alterations of existing buildingsGURVINDER SINGHspecial
04/04/2024Structural Steel - WeldingGURVINDER SINGHspecial
04/03/2024Structural Steel - DetailsGURVINDER SINGHspecial
01/29/2024Tenant Protection Plan ComplianceDean Mendezspecial
06/19/2023FinalAngelos Georgopoulosprogress
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026M01039099-I1Request digital key ↗
08/27/2026M00892718-P2Request digital key ↗
08/27/2026M00892718-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION8
04/07/2016140451543Open ↗
03/31/2016140451543Open ↗
03/31/2016140451543Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
04/08/2016140451543Open ↗
03/15/2016140451543Open ↗
03/28/2014140089865Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M01034282-I1Open ↗
09/01/2026M00891540-P1Open ↗
09/01/2026M00891540-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026M01039099-I1Open ↗
08/27/2026M00892718-I1Open ↗
08/27/2026M00892718-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/27/2016140451543Open ↗
04/17/2015121714341Open ↗
07/24/2013121714341Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00891540-P1Open ↗
08/31/2026M00892718-P2Open ↗
08/31/2026M00892718-P2Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/23/2016140451543Open ↗
06/20/2013140089865Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
02/23/2016140451543Open ↗
06/20/2013140089865Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/23/2016140451543Open ↗
06/20/2013140089865Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
02/23/2016140451543Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
03/31/2016140451543Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026M00892718-P3Open ↗
08/27/2026M00892718-P2Open ↗
08/23/2026M00891540-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/23/2016140451543Open ↗
07/24/2013121714341Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/07/2011120745435Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/27/2016140451543Open ↗
04/17/2015121714341Open ↗
07/24/2013121714341Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
04/27/2016140451543Open ↗
04/17/2015121714341Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/23/2016140451543Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/29/2011120745435Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/31/2016140451543Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/23/2016140451543Open ↗
06/20/2013140089865Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/27/2016140451543Open ↗
04/17/2015121714341Open ↗
▸BISSHED LETTER1
03/28/2014140089865Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/08/2011120745435Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
04/27/2016140451543Open ↗
03/31/2016140451543Open ↗
03/16/2016140451543Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
04/07/2016140451543Open ↗
04/07/2016140451543Open ↗
03/31/2016140451543Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET2
07/24/2013121714341Open ↗
07/07/2011120745435Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/23/2016140451543Open ↗
06/20/2013140089865Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01034282-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01034282-I1Open ↗