← Back
BuildNYC
One story retail building
66 WEST 125TH STREET
MANHATTAN · BIN 1053482
💬 Discuss this project
1962Year Built
1Stories
K1Building Class
C6-3Zoning
5,147 sfGross Floor Area
2Units
0 Active Violations
One story retail building · Owner of record: 64 West · 5,147 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCampero30p · 2 filings · 20 docs
Floor 1Campero, Pollo Campero40p · 4 filings · 20 docs
CellarCampero38p · 2 filings · 20 docs
Site & exteriorProposed sign installation1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fata Organization1707/08/2026
Joseph J. Cullen Trust703/21/2026
8203 3rd Ave Property304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lucid Building Engineering103/12/2026
New York Design Architects802/28/2024
Leon Skvirsky PE108/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York Design Architects1603/21/2026
Great Neck Signs Inc Dba Mineola203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nion ElectricElectrical703/21/2026
Accurate ElectricalElectrical203/21/2026
SJG ConstructionGeneral Contractor203/21/2026
SJG ConstructionScaffold203/21/2026
Case PlumbingFire Protection107/08/2026
Bemus, Jr., JElectrical103/21/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
Ronald Testa, JRElectrical103/21/2026
A1 SpecializedSign hanger107/08/2026
Five Town Neon Sign CoSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aks Architectural & Engineering1957702/28/2024
Building Lifecycle
All (57)Filed (10)Permit Issued (6)Signed Off (5)Violation (1)Inspection (5)Special Inspection (30)
04/09/2026
Signed off — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01369998-I1
03/27/2026
Permit issued — Sign
M01369998-I1-SG
03/12/2026
Filed — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01369998-I1
03/11/2026
Special inspection requirement — Final
YUNHO LEE
10/04/2024
Signed off — Alteration
install signs
M00890899-I1
03/22/2024
Signed off — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE
M00940786-I1
03/19/2024
Signed off — Alteration
Interior renovation of existing retail space cellar and 1st floor in existing commercial building, including new nonload bearing partitions,finishes, lighting and all other related as per plans, including a new mechanical system and electrical & plumbing
M00825766-I1
02/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Final
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
02/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Ventilation and air distribution system
Giuseppe Anzalone
02/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Lighting controls
Giuseppe Anzalone
02/29/2024
Special inspection requirement — Maintenance information
Giuseppe Anzalone
02/28/2024
Filed — Alteration
Interior renovation of existing retail space cellar and 1st floor in existing commercial building, including new nonload bearing partitions,finishes, lighting and all other related as per plans, including a new mechanical system and electrical & plumbing
M00825766-P2
02/26/2024
Special inspection requirement — Duct leakage testing, insulation and design
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Final
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Lighting controls
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Maintenance information
Giuseppe Anzalone
02/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
02/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Ventilation and air distribution system
Giuseppe Anzalone
02/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
02/26/2024
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
02/22/2024
Signed off — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-I1
02/19/2024
Filed — Alteration
Interior renovation of existing retail space cellar and 1st floor in existing commercial building, including new nonload bearing partitions,finishes, lighting and all other related as per plans, including a new mechanical system and electrical & plumbing
M00825766-P1
02/05/2024
Special inspection requirement — Sprinkler Systems
HONG-CHIN MAA
01/19/2024
Filed — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-P3
12/27/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/22/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2023
Permit issued — Sprinklers
M00825670-I1-EW-SP
11/21/2023
Filed — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-P2
11/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2023
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
10/16/2023
Permit issued — Construction Fence
M00940786-I1-FN
10/11/2023
Filed — Alteration
APPLICATION IS FILED FOR A TEMPORARY FENCE
M00940786-I1
09/06/2023
Filed — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-P1
08/31/2023
Permit issued — Sign
M00890899-I1-SG
08/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2023
Filed — Alteration
install signs
M00890899-I1
06/29/2023
Permit issued — Sprinklers
M00825670-I1-PL
06/05/2023
Permit issued — General Construction
M00825766-I1-GC-CX
04/21/2023
Filed — Alteration
Application is filed for modification of plumbing fixtures and sprinkler heads to retrofit new layout at cellar , first floor and roof.
M00825670-I1
04/19/2023
Filed — Alteration
Interior renovation of existing retail space cellar and 1st floor in existing commercial building, including new nonload bearing partitions,finishes, lighting and all other related as per plans, including a new mechanical system and electrical & plumbing
M00825766-I1
03/13/2002
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMad Signs03/27/2026
DOB NOWSprinklersSigned-offS & L Plumbing12/15/2023
DOB NOWConstruction FenceSigned-offSJG Construction10/16/2023
DOB NOWSignSigned-offEnrico Passaro08/31/2023
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating06/29/2023
DOB NOWGeneral ConstructionSigned-offSJG Construction06/05/2023
BISPLISSUEDA P Plumbing & Heating06/12/2024
BIS—ISSUEDFata Organization07/10/2023
BISEQISSUEDRonald Anthony Scaglione Contracting12/06/2001
BISOTISSUEDRonald Anthony Scaglione Contracting12/06/2001
BISPLISSUEDFive Star P and H Co05/30/2001
BISEQISSUEDEmpire State Development05/18/2001
BISOTISSUEDEmpire State Development05/18/2001
BISPLISSUEDMarquis P & H Co02/22/2001
BISEQISSUEDPrestige Construction Co of Nass02/20/2001
BISOTISSUEDPrestige Construction Co Nassau02/20/2001
8 projects · most recent 03/19/2026
General Wiring
FiledStatusContractorScope
03/19/2026Permit IssuedRiviera Electric BrothersGeneral Wiring
03/11/2026Permit IssuedVoltron Electric—
03/05/2026Pending PaymentAccurate ElectricalGeneral Wiring
03/05/2026Pending PaymentAccurate ElectricalGeneral Wiring
09/15/2025CompleteAccurate ElectricalGeneral Wiring
06/25/2025CancelledAccurate ElectricalGeneral Wiring
12/30/2024CompleteNion ElectricGeneral Wiring
04/08/2020CompleteE-J Electric Installation CoGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/27/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/11/2026FinalYUNHO LEEprogress
02/29/2024HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
02/29/2024Mechanical SystemsGiuseppe Anzalonespecial
02/29/2024Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
02/29/2024Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
02/29/2024Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
02/29/2024FinalGiuseppe Anzaloneprogress
02/29/2024Shutoff dampersGiuseppe Anzaloneenergy_progress
02/29/2024Interior lighting powerGiuseppe Anzaloneenergy_progress
02/29/2024HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
02/29/2024Ventilation and air distribution systemGiuseppe Anzaloneenergy_progress
02/29/2024HVAC-R and service water piping design and insulationGiuseppe Anzaloneenergy_progress
02/29/2024Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
02/29/2024Lighting controlsGiuseppe Anzaloneenergy_progress
02/29/2024Maintenance informationGiuseppe Anzaloneenergy_progress
02/26/2024Duct leakage testing, insulation and designGiuseppe Anzaloneenergy_progress
02/26/2024Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
02/26/2024Mechanical SystemsGiuseppe Anzalonespecial
02/26/2024Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
02/26/2024FinalGiuseppe Anzaloneprogress
02/26/2024Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
02/26/2024Lighting controlsGiuseppe Anzaloneenergy_progress
02/26/2024Maintenance informationGiuseppe Anzaloneenergy_progress
02/26/2024HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
02/26/2024HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Pollo CamperoRestaurant / Food ServiceFloor 1
Project M00890899 Alteration · LOC Issued · 08/08/2023
CamperoRestaurant / Food ServiceCellar, Floor 1, Roof
Project M00825670 Alteration · LOC Issued · 04/21/2023
Project M00825766 Alteration · LOC Issued · 04/19/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026M00890899-I1Request digital key ↗
08/29/2026M00940786-I1Request digital key ↗
08/28/2026M00825670-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION17
11/21/2024123917869Open ↗
11/19/2024123917869Open ↗
11/14/2024103130434Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION2
06/12/2024103019948Open ↗
07/10/2023123917869Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/10/2023123917869Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
02/22/2024123917869Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/16/2024123917869Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026M00890899-I1Open ↗
08/29/2026M00940786-I1Open ↗
08/28/2026M00825670-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/30/2026M01369998-I1Open ↗
08/27/2026M00825766-I1Open ↗
08/27/2026M00825766-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026M00825670-P1Open ↗
08/27/2026M00825766-I1Open ↗
08/26/2026M00825670-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
08/09/2024103019948Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
06/15/2023123917869Open ↗
03/27/2023123917869Open ↗
▸BISSTREET TREE SIGNOFF1
02/22/2024123917869Open ↗
▸Environmental & Asbestos9
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026M00825766-I1Open ↗
08/13/2026M00825670-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/28/2026M00825670-I1Open ↗
08/13/2026M00825766-I1Open ↗
▸DOB NOWOER: Notice to Proceed2
08/13/2026M00825670-I1Open ↗
08/13/2026M00825766-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
02/22/2024123917869Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
07/07/2023123917869Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026M00890899-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/22/2024103019948Open ↗
09/25/2024103019948Open ↗
09/25/2024103019948Open ↗
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
11/22/2024103019948Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
11/22/2024103019948Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE4
09/05/2023123917869Open ↗
08/30/2023123917869Open ↗
05/02/2023123917869Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER1
06/12/2024103019948Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/25/2024103019948Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
06/15/2023123917869Open ↗
03/27/2023123917869Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/10/2025123917869Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION7
11/27/2024123917869Open ↗
07/02/2024103019948Open ↗
04/15/2024103019948Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET1
03/24/2023123917869Open ↗
▸BISBOROUGH INTAKE FORM1
06/12/2024103019948Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/15/2023123917869Open ↗
06/15/2023123917869Open ↗