← Back
Single or multiple dwelling with stores or offices
660 ROGERS AVENUE
BROOKLYN · BIN 3116022
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R6Zoning
4,488 sfGross Floor Area
7Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 660 ROGERS AVENUE LLC · 1,679 sf lot · 2.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingLandscapeCivil
Roof3p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
660 ROGERS AVE3207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P GEORGOPOULOS ARCHITECT PC810/28/2024
ASHRAF CORP304/30/2021
H G LEE ARCHITECT PC109/24/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES603/21/2026
MONICA SANTOS EXP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RADB CONTRACTING INCGeneral Contractor507/08/2026
LAKHI GENERAL CONTRACTORGeneral Contractor207/08/2026
NOPHIER PLUMBING & HTG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P GEORGOPOULOS ARCHITECT889710/28/2024
Building Lifecycle
All (97)Filed (12)Permit Issued (6)Signed Off (5)Violation (39)Inspection (5)Special Inspection (30)
05/07/2026
Violation issued (HPD, closed)
A
11/20/2025
Violation issued (HPD, closed)
I
06/12/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
11/25/2024
Signed off — Alteration
REPAIR OF EXISTING FACADE AS PER EMERGENCY ORDERS. Seal access to hallway on 3rd floor and create closet instead of bathroom in order to correct violation 35507140M and 35507141Y. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING.
B00881696-I1
11/22/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/06/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/31/2024
Special inspection requirement — Masonry
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Air barrier - visual inspection
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Fenestration areas
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Fenestration air leakage
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Permanent certificate
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Final
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Structural Steel - Details
Vasilios Georgopoulos
10/31/2024
Special inspection requirement — Post-installed Anchors
Vasilios Georgopoulos
10/28/2024
Filed — Alteration
REPAIR OF EXISTING FACADE AS PER EMERGENCY ORDERS. Seal access to hallway on 3rd floor and create closet instead of bathroom in order to correct violation 35507140M and 35507141Y. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING.
B00881696-P6
10/28/2024
Special inspection requirement — Fenestration areas
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Structural Steel - Details
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Energy Code Compliance Inspections
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Final
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Fenestration air leakage
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Air barrier - visual inspection
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Permanent certificate
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Masonry
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Post-installed Anchors
Vasilios Georgopoulos
10/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vasilios Georgopoulos
10/10/2024
Filed — Alteration
REPAIR OF EXISTING FACADE AS PER EMERGENCY ORDERS. Seal access to hallway on 3rd floor and create closet instead of bathroom in order to correct violation 35507140M and 35507141Y. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING.
B00881696-P2
10/02/2024
Signed off — Alteration
REPAIR OF EXISTING FACADE AS PER EMERGENCY ORDERS. Seal access to hallway on 3rd floor and create closet instead of bathroom in order to correct violation 35507140M and 35507141Y. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING.
B00881696-S1
09/24/2024
Special inspection requirement — Wood – Seismic Resistance
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vasilios Georgopoulos
09/17/2024
Filed — Alteration
REPAIR OF EXISTING FACADE AS PER EMERGENCY ORDERS. Seal access to hallway on 3rd floor and create closet instead of bathroom in order to correct violation 35507140M and 35507141Y. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING.
B00881696-P4
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vasilios Georgopoulos
09/06/2024
Signed off — Alteration
INSTALLATION OF PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION B00881696.
B00881693-I1
09/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2024
Filed — Alteration
REPAIR OF EXISTING FACADE AS PER EMERGENCY ORDERS. Seal access to hallway on 3rd floor and create closet instead of bathroom in order to correct violation 35507140M and 35507141Y. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING.
B00881696-P3
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vasilios Georgopoulos
04/16/2024
Violation issued (HPD, closed)
A
03/27/2024
Permit issued — Plumbing
B00881696-S1-PL
03/21/2024
Filed — Alteration
REPAIR OF EXISTING FACADE AS PER EMERGENCY ORDERS. Seal access to hallway on 3rd floor and create closet instead of bathroom in order to correct violation 35507140M and 35507141Y. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING.
B00881696-S1
02/05/2024
Special inspection requirement — Air barrier - visual inspection
Vasilios Georgopoulos
02/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Vasilios Georgopoulos
02/05/2024
Special inspection requirement — Structural Steel - Details
Vasilios Georgopoulos
02/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vasilios Georgopoulos
01/29/2024
Violation issued (FDNY_ORDER, closed)
01/29/2024
Violation issued (FDNY_ORDER, closed)
01/29/2024
Violation issued (FDNY_ORDER, closed)
01/12/2024
Permit issued — General Construction
B00881696-I1-GC-CX
12/21/2023
Violation issued (ECB, closed)
Construction
11/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/2023
Signed off — Alteration
INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
B00489858-I1
09/01/2023
Signed off — Alteration
INSTALLATION OF MEDIUM DUTY PIPE SCAFFOLDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
B00489861-I1
08/29/2023
Violation issued (ECB, closed)
Construction
08/29/2023
Violation issued (ECB, closed)
Construction
08/22/2023
Filed — Alteration
REPAIR OF EXISTING FACADE AS PER EMERGENCY ORDERS. Seal access to hallway on 3rd floor and create closet instead of bathroom in order to correct violation 35507140M and 35507141Y. NO CHANGE IN USE, EGRESS AND OR OCCUPANCY OF THE BUILDING.
B00881696-P1
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNOPHIER PLUMBING & HTG IN03/27/2024
DOB NOWGeneral ConstructionSigned-offRADB CONTRACTING INC01/12/2024
DOB NOWStructuralSigned-offRADB CONTRACTING INC06/17/2023
DOB NOWConstruction FenceSigned-offRADB CONTRACTING INC06/04/2023
DOB NOWGeneral ConstructionPermit IssuedLAKHI GENERAL CONTRACTOR05/10/2021
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR04/09/2021
BISMHISSUEDFOREFRONT CONTRACTING INC12/18/2015
3 projects · most recent 01/28/2025
General Wiring
FiledStatusContractorScope
01/28/2025CompleteSELECT ELECTRICAL GROUP IGeneral Wiring
09/10/2024CompleteSELECT ELECTRICAL GROUP I—
12/01/2023Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/22/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/06/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/31/2024MasonryVasilios Georgopoulosspecial
10/31/2024Air barrier - visual inspectionVasilios Georgopoulosenergy_progress
10/31/2024Fenestration areasVasilios Georgopoulosenergy_progress
10/31/2024Fenestration and door U-factor and product ratingsVasilios Georgopoulosenergy_progress
10/31/2024Fenestration air leakageVasilios Georgopoulosenergy_progress
10/31/2024Permanent certificateVasilios Georgopoulosenergy_progress
10/31/2024Energy Code Compliance InspectionsVasilios Georgopoulosprogress
10/31/2024FinalVasilios Georgopoulosprogress
10/31/2024Structural Stability – Alterations of existing buildingsVasilios Georgopoulosspecial
10/31/2024Structural Steel - DetailsVasilios Georgopoulosspecial
10/31/2024Post-installed AnchorsVasilios Georgopoulosspecial
10/28/2024Fenestration areasVasilios Georgopoulosenergy_progress
10/28/2024Structural Steel - DetailsVasilios Georgopoulosspecial
10/28/2024Energy Code Compliance InspectionsVasilios Georgopoulosprogress
10/28/2024FinalVasilios Georgopoulosprogress
10/28/2024Fenestration and door U-factor and product ratingsVasilios Georgopoulosenergy_progress
10/28/2024Fenestration air leakageVasilios Georgopoulosenergy_progress
10/28/2024Air barrier - visual inspectionVasilios Georgopoulosenergy_progress
10/28/2024Permanent certificateVasilios Georgopoulosenergy_progress
10/28/2024MasonryVasilios Georgopoulosspecial
10/28/2024Post-installed AnchorsVasilios Georgopoulosspecial
10/28/2024Structural Stability – Alterations of existing buildingsVasilios Georgopoulosspecial
09/24/2024Wood – Seismic Resistance—special
09/18/2024Fire-Resistant Penetrations and JointsVasilios Georgopoulosspecial
09/13/2024Fire-Resistant Penetrations and JointsVasilios Georgopoulosspecial
Latest 25 of 49.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/02/2026B00075767-I1Request digital key ↗
09/01/2026B00489858-I1Request digital key ↗
09/01/2026B00489861-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/21/2015321290394Open ↗
▸BISWORK PERMIT APPLICATION1
12/22/2015321290394Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026B00075767-I1Open ↗
08/27/2026B00881693-I1Open ↗
08/27/2026B00881696-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00496164-I1Open ↗
09/01/2026B00881696-P6Open ↗
09/01/2026B00881696-P6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00881696-P6Open ↗
09/01/2026B00881696-P4Open ↗
09/01/2026B00881696-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/21/2015321290394Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/21/2015321290394Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/21/2015321290394Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/21/2015321290394Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026B00881696-I1Open ↗
08/27/2026B00881696-P3Open ↗
08/27/2026B00881696-S1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)ASBESTOS: CERTIFICATION (DEP ACP5)1
12/21/2015321290394Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/21/2015321290394Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVITCOMMUNITY BOARD NOTIFICATION1
12/21/2015321290394Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/21/2015321290394Open ↗
▸Other Documents3
▸DOB NOWPro Cert Restriction Exception (LL158/17)3
08/27/2026B00881696-P3Open ↗
08/27/2026B00881696-S1Open ↗
08/13/2026B00881696-P4Open ↗