ECB10/13/2006B4A,19B,38,50A,B,C,D,E. 50A-REPLACE GP BACK FLOW PREVENTOR W/ 009 WATTS. BOILER OVER 350.000 BTU. 50B-PIPE SAFETY OR RELIEF VALVE UP RIGHT. 50C-HOLES IN BOILER RM WALLS & CEILING. 50D-FLUE PIPE NOT PROPERLYNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 5,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.