← Back
Elevator apt, semi-fireproof without stores
661 MANIDA STREET
BRONX · Hunts Point · BIN 2130561
💬 Discuss this project
2022Year Built
8Stories
D1Building Class
R6Zoning
31,658 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized5 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 661 MANIDA STREET LLC · 7,500 sf lot · 4.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof3p · 3 filings · 20 docs
Bulkhead3p · 3 filings · 20 docs
Floor 89p · 4 filings · 20 docs
Floor 77p · 4 filings · 20 docs
Floor 68p · 3 filings · 20 docs
Floor 58p · 3 filings · 20 docs
Floor 48p · 3 filings · 20 docs
Floor 38p · 2 filings · 20 docs
Floor 27p · 3 filings · 20 docs
Floor 18p · 4 filings · 20 docs
Cellar11p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1307/08/2026
6215 14 AVE2807/08/2026
661 MANIDA STREET LLC203/22/2026
JOSIL GROUP303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/31/2019$805K—Private party → 661 MANIDA STREET LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY EXPEDITING1603/21/2026
AE DESIGN SOLUTION1603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL HOME IMPROVEMENTSGeneral Contractor1107/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor807/08/2026
PRIME PIPING & HEATING INPlumbing607/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
JEFF AKERMANElectrical103/21/2026
AMR OUDA PEGeneral Contractor103/22/2026
MILAZZO DESIGN AND EXPElectrical103/21/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394808/22/2022
AR-TECH ENGINEERING, P.C.6659202/25/2022
Building Lifecycle
All (133)Filed (18)Permit Issued (10)Signed Off (11)Violation (12)Inspection (8)Objection (44)Special Inspection (30)
07/29/2026
Violation issued (HPD, open)
C
07/29/2026
Violation issued (HPD, open)
B
07/29/2026
Violation issued (HPD, open)
C
07/29/2026
Violation issued (HPD, open)
C
07/29/2026
Violation issued (HPD, open)
A
03/11/2026
Violation issued (HPD, closed)
C
09/28/2025
Violation issued (HPD, closed)
C
10/03/2023
Violation issued (HPD, closed)
B
05/08/2023
Violation issued (HPD, closed)
B
05/08/2023
Violation issued (HPD, closed)
B
05/08/2023
Violation issued (HPD, closed)
B
10/31/2022
Violation issued (ECB, closed)
Construction
09/21/2022
Signed off — Alteration
Installation of Plumbing System in Conjunction of NB Job #240285865
X00428886-I1
09/09/2022
Signed off — Alteration
X00434635-I1
09/07/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/30/2022
Signed off — Alteration
Installation of Sprinkler System with FD Siamese Connection in Conjunction with NB Job #240285865
X00434594-I1
08/30/2022
Signed off — Alteration
Installation of new Mechanical System in conjunction with NB job #240285865
X00428880-I1
08/25/2022
Special inspection requirement — Maintenance information
Paul Raymond
08/25/2022
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
08/25/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
08/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/25/2022
Special inspection requirement — Energy Code Compliance
Paul Raymond
08/25/2022
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
08/25/2022
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
08/22/2022
Filed — Alteration
Installation of Plumbing System in Conjunction of NB Job #240285865
X00428886-P2
08/17/2022
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/17/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/12/2022
Signed off — Alteration
X00388186-I1
08/11/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/11/2022
Special inspection requirement — Sprinkler Systems
Paul Raymond
08/10/2022
Objection resolved — Addressed
08/09/2022
Filed — Alteration
Installation of Sprinkler System with FD Siamese Connection in Conjunction with NB Job #240285865
X00434594-P1
08/09/2022
Objection raised — Scope
08/05/2022
Signed off — Alteration
X00350484-I1
08/04/2022
Filed — Alteration
Installation of Plumbing System in Conjunction of NB Job #240285865
X00428886-P1
08/04/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
08/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/04/2022
Special inspection requirement — Sprinkler Systems
Paul Raymond
08/04/2022
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
08/04/2022
Special inspection requirement — Energy Code Compliance
Paul Raymond
08/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
08/04/2022
Special inspection requirement — Maintenance information
Paul Raymond
08/04/2022
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
08/04/2022
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
07/06/2022
Signed off — Alteration
Structural drawings in conjunction with NB#240285865
X00465749-I1
06/28/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00641679-I1
06/28/2022
Signed off — Alteration
X00641666-I1
06/28/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00641709-I1
06/28/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00641704-I1
06/02/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/02/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/18/2022
Permit issued — Curb Cut
X00434635-I1-CC
05/18/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/03/2022
Special inspection requirement — Final
Paul Perdek
03/03/2022
Special inspection requirement — Post-installed Anchors
ALBERTO ROMAN
03/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALBERTO ROMAN
02/28/2022
Special inspection requirement — Final
Paul Perdek
02/25/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00641679-P1
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offGLOBAL HOME IMPROVEMENTS05/18/2022
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP02/10/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC01/26/2022
DOB NOWMechanical SystemsSigned-offGLOBAL HOME IMPROVEMENTS01/08/2022
DOB NOWStructuralSigned-offGLOBAL HOME IMPROVEMENTS12/10/2021
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/09/2021
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC12/09/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC12/08/2021
DOB NOWConstruction FenceSigned-offGLOBAL HOME IMPROVEMENTS11/26/2021
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN11/17/2021
BIS—ISSUEDGLOBAL HOME IMPROVEMENTS08/19/2022
BIS—ISSUEDGLOBAL HOME IMPROVEMENTS09/14/2021
BIS—ISSUEDGLOBAL HOME IMPROVEMENTS09/14/2021
5 projects · most recent 09/13/2022
General Wiring
FiledStatusContractorScope
09/13/2022CompleteSTAR ELEC'L CONTRACTORS C—
01/26/2022CompleteSPARK ELECTRICAL SVCS LLC57 meters, 57 new_meters
12/07/2021CompleteTRUE POWER ELECL CONT LLCGeneral Wiring
12/03/2021CompleteV. VASS ELECTRIC CORP—
08/19/2020CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/07/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
08/17/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
08/17/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/11/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/02/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/18/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
08/25/2022Maintenance informationPaul Raymondenergy_progress
08/25/2022HVAC and service water heating system controls Paul Raymondenergy_progress
08/25/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
08/25/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
08/25/2022Energy Code CompliancePaul Raymondprogress
08/25/2022HVAC and service water heating equipment Paul Raymondenergy_progress
08/25/2022HVAC insulation and sealing Paul Raymondenergy_progress
08/11/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
08/11/2022Sprinkler SystemsPaul Raymondspecial
08/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
08/04/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
08/04/2022Sprinkler SystemsPaul Raymondspecial
08/04/2022HVAC insulation and sealing Paul Raymondenergy_progress
08/04/2022Energy Code CompliancePaul Raymondprogress
08/04/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
08/04/2022Maintenance informationPaul Raymondenergy_progress
08/04/2022HVAC and service water heating system controls Paul Raymondenergy_progress
08/04/2022HVAC and service water heating equipment Paul Raymondenergy_progress
03/03/2022FinalPaul Perdekprogress
03/03/2022Post-installed AnchorsALBERTO ROMANspecial
03/03/2022Structural Stability – Alterations of existing buildingsALBERTO ROMANspecial
02/28/2022FinalPaul Perdekprogress
02/25/2022Post-installed AnchorsALBERTO ROMANspecial
02/25/2022Structural Stability – Alterations of existing buildingsALBERTO ROMANspecial
11/01/2021Structural Stability – Alterations of existing buildingsPaul Raymondspecial
Latest 25 of 41.
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch8
08/25/2026X00641666-P1Request digital key ↗
08/25/2026X00641666-I1Request digital key ↗
08/25/2026X00641704-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/24/2026X00428886-P2Request digital key ↗
08/24/2026X00428886-P1Request digital key ↗
08/14/2026X00428886-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/25/2026X00434594-I1Request digital key ↗
08/15/2026X00434594-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/25/2026X00434635-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026X00428880-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00350484-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00388186-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026X00465749-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION13
11/03/2022240285865Open ↗
09/20/2022240285865Open ↗
08/17/2022240285865Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION10
08/22/2022240285865Open ↗
09/15/2021240285865Open ↗
09/15/2021240285865Open ↗
Showing 3 of 10 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
06/16/2022240296498Open ↗
12/08/2020240296498Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM4
09/22/2022240285865Open ↗
09/02/2022240285865Open ↗
06/01/2021240285865Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/01/2020240285865Open ↗
▸BISVERIFY TAX LOT1
05/31/2022240285865Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
12/01/2020240285865Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/30/2022240285865Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/01/2020240285865Open ↗
▸Seals & Professional Certifications64
▸DOB NOWProgress Inspector Seal & Signature21
08/31/2026X00350484-I1Open ↗
08/30/2026X00641709-I1Open ↗
08/27/2026X00465749-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
08/31/2026X00434594-P1Open ↗
08/31/2026X00434594-P1Open ↗
08/30/2026X00641709-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/25/2026X00434594-I1Open ↗
08/25/2026X00465749-I1Open ↗
08/25/2026X00641666-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/21/2021240285865Open ↗
05/21/2021240285865Open ↗
05/21/2021240285865Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
12/08/2020240296498Open ↗
09/21/2020240285865Open ↗
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/25/2022240285865Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/25/2022240285865Open ↗
▸BISDEP STORMWATER/SEWER CERTIFICATION (HCP/SCP)1
04/13/2021240285865Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/06/2022240285865Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE SIGNOFF2
09/21/2022240285865Open ↗
09/08/2022240296498Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
06/02/2021240285865Open ↗
05/17/2021240285865Open ↗
▸BISSTREET TREE CHECKLIST2
12/08/2020240296498Open ↗
09/21/2020240285865Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/08/2020240296498Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
12/05/2022240285865Open ↗
10/06/2022240285865Open ↗
11/05/2021240285865Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00428886-I1Open ↗
08/13/2026X00428880-I1Open ↗
▸BISINTERIOR LIGHTING POWER1
08/25/2022240285865Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/25/2022240285865Open ↗
▸BISFENESTRATION AREAS1
08/25/2022240285865Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/25/2022240285865Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/25/2022240285865Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/25/2022240285865Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/25/2022240285865Open ↗
▸BISLIGHTING CONTROLS1
08/25/2022240285865Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/21/2021240285865Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/25/2022240285865Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
08/25/2022240285865Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY12
06/02/2022240285865Open ↗
06/02/2022240285865Open ↗
11/05/2021240285865Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
09/12/2022240285865Open ↗
09/06/2022240285865Open ↗
08/29/2022240285865Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
05/16/2022240285865Open ↗
05/21/2021240285865Open ↗
05/17/2021240285865Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
05/30/2022240285865Open ↗
05/17/2021240285865Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/25/2022240285865Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/15/2022240285865Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
06/15/2022240285865Open ↗
▸BISMASONRY1
06/15/2022240285865Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
06/15/2022240285865Open ↗
▸BISSOIL REPORT1
01/04/2021240285865Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/04/2021240285865Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
06/15/2022240285865Open ↗
▸Approvals, Objections & Sign-offs20
▸BISSCHEDULE A - OCCUPANCY / USE11
11/03/2022240285865Open ↗
09/20/2022240285865Open ↗
08/17/2022240285865Open ↗
Showing 3 of 11 on file for this type
▸BISSUPERSEDING LETTER4
08/22/2022240285865Open ↗
09/15/2021240285865Open ↗
09/15/2021240285865Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/13/2021240296498Open ↗
07/13/2021240296498Open ↗
06/02/2021240285865Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
09/23/2022240296498Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
09/23/2022240296498Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION7
09/23/2022240296498Open ↗
09/02/2022240285865Open ↗
09/02/2022240285865Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/08/2020240296498Open ↗
09/21/2020240285865Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/08/2020240296498Open ↗
▸BISEFILING COVER SHEET1
09/16/2020240285865Open ↗
▸Other Documents8
▸BISSHUTOFF DAMPERS1
08/25/2022240285865Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
09/21/2020240285865Open ↗
▸BISMAINTENANCE INFORMATION1
08/25/2022240285865Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
08/25/2022240285865Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/17/2021240285865Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/25/2022240285865Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
12/08/2020240296498Open ↗
▸BISPLOT DIAGRAM1
12/07/2020240285865Open ↗