Public elementary, junior or senior high
P.S. 297 Abraham Stockton
662 PARK AVENUE · BIN 3048508
💬 Discuss this project
1959Year Built
3Stories
W1Building Class
R6AZoning
74,100 sfGross Floor Area
1Units
LL97 Covered13 Open Violations 3 unresolved · 10 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 106,400 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction130p · 2 filings · 20 docs
Floor 3Under Construction104p · 2 filings · 20 docs
Floor 2Under Construction104p · 2 filings · 20 docs
Floor 1Under Construction109p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY5009/02/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DOE PS 297 040303/22/2026
DEPARTMENT OF EDUCATION2003/22/2026
DOE P.S. 297603/22/2026
DEPT OF EDUCATION PS297703/22/2026
DOE 040403/22/2026
NYC PARKS 8203/22/2026
DOE K 297 040103/22/2026
PS 297 DOE 0403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYCSCA305/28/2026
EME GROUP/SALAS O'BRIEN110/30/2025
AK CONSULTING SERVICES, INC507/17/2025
STANTEC106/25/2025
STANTEC ARCHITECTURE INC.306/19/2025
STANTEC CONSULTING107/11/2024
NYC SCHOOL CONSTRUCTION AUTHORITY212/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES1003/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY303/21/2026
STANTEC ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor2707/08/2026
BHARAT MECHANICAL CORPGeneral Contractor608/18/2026
CHAPMAN & EVANS INCGeneral Contractor507/08/2026
VARSITY PLBG AND HTG INCPlumbing307/08/2026
FRANCIS RICHARDSElectrical203/21/2026
LUPINSKI, MAREKElectrical103/21/2026
BERNARD FARSKYElectrical103/21/2026
OFF SHORE ELECTRIC CORPElectrical103/22/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
STUART MOSKOWITZElectrical103/21/2026
MOSKOWITZ STUARTElectrical103/21/2026
CEDOMIR MARAElectrical103/21/2026
CHAYUT, ALLENElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.317905/28/2026
JPC LOGISTICS DBA JPCL EN351110/30/2025
Building Lifecycle
All (174)Filed (16)Permit Issued (35)Signed Off (3)Violation (60)Objection (30)Special Inspection (30)
08/17/2026
Permit issued — General Construction
B01066126-I1-GC
08/17/2026
Permit issued — Mechanical Systems
B01066126-S1-MS
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
06/02/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
05/28/2026
Filed — Alteration
K297-PLUMBING WORK
B00785619-P2
05/27/2026
Special inspection requirement — Energy Code Compliance Inspections
MAXIM KORNGOLD
05/27/2026
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
05/27/2026
Special inspection requirement — Final
MAXIM KORNGOLD
05/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAXIM KORNGOLD
05/27/2026
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Electrical motors and elevators
MIKHAIL ZEYGMAN
05/27/2026
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
05/21/2026
Filed — Alteration
K297-PLUMBING WORK
B00785619-P1
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAXIM KORNGOLD
05/18/2026
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
05/15/2026
Special inspection requirement — Mechanical Systems
MAXIM KORNGOLD
05/15/2026
Special inspection requirement — Final
MAXIM KORNGOLD
05/15/2026
Special inspection requirement — Fire-Resistance Rated Construction
MAXIM KORNGOLD
05/15/2026
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
05/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
05/15/2026
Special inspection requirement — Electrical motors and elevators
MIKHAIL ZEYGMAN
05/15/2026
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
05/15/2026
Special inspection requirement — Energy Code Compliance Inspections
MAXIM KORNGOLD
03/30/2026
Permit issued — Plumbing
B00785619-S2-PL
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
02/25/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
01/22/2026
Permit issued — Structural
B00785619-I1-ST
01/14/2026
Permit issued — General Construction
B00785619-I1-GC
01/09/2026
Violation issued (FDNY_ORDER, closed)
01/09/2026
Violation issued (FDNY_ORDER, closed)
12/11/2025
Objection raised — Scope
12/03/2025
Objection resolved — Addressed
12/01/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 700 PARK AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00912271-I1
12/01/2025
Signed off — Alteration
B00912280-I1
12/01/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 700 PARK AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00912292-I1
12/01/2025
Permit issued — General Construction
B00785619-I1-ST
12/01/2025
Permit issued — General Construction
B00785619-I1-GC
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/12/2025
Objection raised — Scope
11/12/2025
Objection raised — Mechanical
11/12/2025
Objection raised — Energy
11/12/2025
Objection raised — Fire_Protection
11/12/2025
Objection raised — Mechanical
11/12/2025
Objection raised — Structural
11/12/2025
Objection raised — Scope
10/30/2025
Filed — Alteration
INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM FOR THE GYMNASIUM
B01293927-I1
10/30/2025
Permit issued — Mechanical Systems
B00785619-S1-MS
08/08/2025
Permit issued — General Construction
B01066126-I1-GC
08/08/2025
Permit issued — Mechanical Systems
B01066126-S1-MS
08/07/2025
Permit issued — Construction Fence
B01252178-I1-FN
07/30/2025
Objection resolved — Addressed
07/22/2025
Objection raised — Other
07/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR GYMNASIUM UPGRADE IN PS 297K AT 700 PARK AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01252178-I1
06/30/2025
Violation issued (ECB, open)
Boilers
06/30/2025
Violation issued (ECB, open)
Boilers
Latest 60 of 174 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBHARAT MECHANICAL CORP08/17/2026
DOB NOWMechanical SystemsPermit IssuedBHARAT MECHANICAL CORP08/17/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC03/30/2026
DOB NOWStructuralPermit IssuedROMA SCAFFOLDING INC01/22/2026
DOB NOWGeneral ConstructionPermit IssuedROMA SCAFFOLDING INC01/14/2026
DOB NOWGeneral ConstructionPermit IssuedROMA SCAFFOLDING INC12/01/2025
DOB NOWGeneral ConstructionPermit IssuedROMA SCAFFOLDING INC12/01/2025
DOB NOWMechanical SystemsSigned-offCHAPMAN EVANS10/30/2025
DOB NOWGeneral ConstructionPermit IssuedBHARAT MECHANICAL08/08/2025
DOB NOWMechanical SystemsPermit IssuedBHARAT MECHANICAL08/08/2025
DOB NOWConstruction FencePermit IssuedBHARAT MECHANICAL08/07/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC04/02/2025
DOB NOWGeneral ConstructionPermit IssuedROMA SCAFFOLDING INC01/16/2025
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/15/2025
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC01/15/2025
DOB NOWStructuralPermit IssuedROMA SCAFFOLDING INC01/15/2025
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/13/2025
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/07/2025
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/07/2025
DOB NOWStructuralPermit IssuedROMA SCAFFOLDING INC01/07/2025
DOB NOWStructuralPermit IssuedROMA SCAFFOLDING INC01/07/2025
DOB NOWMechanical SystemsSigned-offCHAPMAN EVANS11/04/2024
DOB NOWMechanical SystemsSigned-offCHAPMAN EVANS09/25/2024
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC08/12/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC04/09/2024
DOB NOWStructuralPermit IssuedROMA SCAFFOLDING INC01/22/2024
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC01/22/2024
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC01/22/2024
DOB NOWStructuralPermit IssuedROMA SCAFFOLDING INC01/22/2024
DOB NOWGeneral ConstructionPermit IssuedROMA SCAFFOLDING INC10/20/2023
DOB NOWMechanical SystemsSigned-offCHAPMAN EVANS10/11/2023
DOB NOWGeneral ConstructionPermit IssuedROMA SCAFFOLDING INC10/10/2023
DOB NOWSupported ScaffoldSigned-offROMA SCAFFOLDING INC10/06/2023
DOB NOWConstruction FenceSigned-offROMA SCAFFOLDING INC09/01/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC09/01/2023
BISOTISSUEDZAMAN CONSTRUCTION CORP10/05/2018
BISBLISSUEDPREMIER PLBNG & HTNG SPEC09/11/2018
BISPLISSUEDPREMIER PLBNG & HTNG SPEC09/11/2018
BISOTISSUEDZAMAN CONSTRUCTION CORP07/26/2018
BISMHISSUEDZAMAN CONSTRUCTION CORP07/24/2018
+ 15 more permits on file
3 projects · most recent 05/28/2026
Air Conditioning Systems Refrigeration Systems Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2026Permit IssuedROMA SCAFFOLDING INCAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Mitsubishi Electric PKA-A24KA846M04040 Split System ×1
PUY-A24NHA7 Split System ×1
Ventilation
Greenheck GB-220-20-1-34-X 6,340 CFM · Exhaust Fan ×2
G-080-VG-1-17-X 315 CFM · Exhaust Fan ×1
GB-130-4-1-19-X 1,300 CFM · Exhaust Fan ×1
GB-220-10-1-34-X 4,160 CFM · Exhaust Fan ×1
GB-220-7-1-34-X 3,200 CFM · Exhaust Fan ×1
GB-300-20-1-40-X 7,480 CFM · Exhaust Fan ×1
Refrigeration
10/30/2025——Air Conditioning Systems
Cooling
Fujitsu ASUA36TLAV2-R32 34,000 BTU · Fan Coil Indoor ×8
AOU120RLAVL-R32 120,000 BTU · Vrf Outdoor ×2
06/25/2025Permit IssuedBHARAT MECHANICAL CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric City Multi VRF Indoor Unit - PKFY-P30NKMU-E2R1.TH 30,000 BTU · Vrf Indoor ×8
City Multi VRF Outdoor Unit - MXZ-SM60NAM2-U1 60,000 BTU · Vrf Outdoor ×4
Trane COOLING COIL - DFDB24054G0DB164DAJA0*BAAA00** 112,000 BTU · Ductwork ×2
Odyssey Outdoor Unitary Split System - TTA12043CAA**BS01 115,000 BTU · Condensing Unit ×2
1 project · most recent 05/28/2026
Storm
FiledStatusContractorScope
05/28/2026Permit IssuedVARSITY PLBG AND HTG INCStorm
17 projects · most recent 09/23/2025
General Wiring Lighting
FiledStatusContractorScope
09/23/2025CompleteCHARAN ELEC'L ENTERP'S IN—
07/17/2025Permit IssuedMNBC ELECTRICAL CORPGeneral Wiring
07/09/2024CompleteMNBC ELECTRICAL CORPGeneral Wiring
10/13/2023Permit IssuedHYLAN DATACOM & ELECL LLC—
09/07/2023CompleteHYLAN DATACOM & ELECL LLC—
08/31/2023CompleteHYLAN DATACOM & ELECL LLC—
05/08/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
06/24/2022CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
05/17/2022CompleteCHARAN ELEC'L ENTERP'S IN—
08/20/2020CompleteCHARAN ELEC'L ENTERP'S IN—
05/22/2019CompleteDENMAR ELECTRIC CORPGeneral Wiring
05/01/2019Permit IssuedOFF SHORE ELECTRIC CORPGeneral Wiring
06/22/2018CompleteMILAD CONTRACTING CORP.General Wiring, Lighting
06/11/2018CompleteROBERT S. COVELLOGeneral Wiring
05/14/2018CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 07/17/2025
Fence
FiledStatusContractorScope
07/17/2025Permit IssuedBHARAT MECHANICAL CORPFence
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
06/02/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
06/02/2026Post-installed AnchorsMAXIM KORNGOLDspecial
05/27/2026Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
05/27/2026Mechanical SystemsMAXIM KORNGOLDspecial
05/27/2026FinalMAXIM KORNGOLDprogress
05/27/2026Fire-Resistance Rated ConstructionMAXIM KORNGOLDprogress
05/27/2026Maintenance informationMIKHAIL ZEYGMANenergy_progress
05/27/2026HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
05/27/2026Electrical motors and elevatorsMIKHAIL ZEYGMANenergy_progress
05/27/2026Shutoff dampersMIKHAIL ZEYGMANenergy_progress
05/18/2026Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
05/18/2026Post-installed AnchorsMAXIM KORNGOLDspecial
05/15/2026Mechanical SystemsMAXIM KORNGOLDspecial
05/15/2026FinalMAXIM KORNGOLDprogress
05/15/2026Fire-Resistance Rated ConstructionMAXIM KORNGOLDprogress
05/15/2026Shutoff dampersMIKHAIL ZEYGMANenergy_progress
05/15/2026HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
05/15/2026Electrical motors and elevatorsMIKHAIL ZEYGMANenergy_progress
05/15/2026Maintenance informationMIKHAIL ZEYGMANenergy_progress
05/15/2026Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
06/30/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
06/30/2025FinalMIKHAIL ZEYGMANprogress
06/30/2025Heating SystemsMIKHAIL ZEYGMANspecial
06/30/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
06/30/2025Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
Latest 25 of 33.
▾Documents — 172 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/28/2026B00785619-P2Request digital key ↗
08/28/2026B00785619-P1Request digital key ↗
08/28/2026B00785619-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION9
09/12/2018321314225Open ↗
09/12/2018321314225Open ↗
06/04/2018321314225Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
01/14/2019321314225Open ↗
11/13/2018321314225Open ↗
10/30/2018321314225Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
01/18/2017321314225Open ↗
03/09/2016321314225Open ↗
03/09/2016321314225Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature16
08/28/2026B01066126-P3Open ↗
08/28/2026B01066126-P3Open ↗
08/28/2026B01066126-P3Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026B00785619-P1Open ↗
08/28/2026B00785619-P2Open ↗
08/28/2026B00785619-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/30/2026B00785619-P2Open ↗
08/28/2026B01066126-P3Open ↗
08/28/2026B01066126-P3Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
06/28/2017321314225Open ↗
06/28/2017321314225Open ↗
01/18/2017321314225Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
11/14/2018321314225Open ↗
10/04/2018321314225Open ↗
03/09/2016321314225Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/09/2016321314225Open ↗
▸Safety & Tenant Protection5
▸DOB NOWNYCSCA - Approved Site Safety Plans5
08/13/2026B00912292-P1Open ↗
08/13/2026B00912271-I1Open ↗
08/13/2026B01252178-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01066126-I1Open ↗
08/21/2026B01066126-I1Open ↗
08/21/2026B01066126-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/29/2017321314225Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/28/2017321314225Open ↗
06/28/2017321314225Open ↗
03/09/2016321314225Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/18/2022321314225Open ↗
11/18/2022321314225Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/18/2022321314225Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/18/2022321314225Open ↗
11/18/2022321314225Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/28/2026B00785619-P1Open ↗
08/28/2026B00785619-P2Open ↗
08/27/2026B00912280-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)16
08/28/2026B00785619-P2Open ↗
08/28/2026B00785619-P1Open ↗
08/21/2026B01066126-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026B00785619-S2Open ↗
08/13/2026B00785619-I1Open ↗
08/13/2026B00785619-S1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/06/2016321314225Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/18/2022321314225Open ↗
03/09/2016321314225Open ↗
03/09/2016321314225Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
01/18/2019321314225Open ↗
11/20/2018321314225Open ↗
11/07/2018321314225Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAI1 Form3
08/28/2026B00785619-P1Open ↗
08/28/2026B00785619-S1Open ↗
08/13/2026B00785619-I1Open ↗
▸BISEFILING COVER SHEET2
03/09/2016321314225Open ↗
03/09/2016321314225Open ↗
▸Other Documents17
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal16
08/28/2026B00785619-P1Open ↗
08/28/2026B00785619-P2Open ↗
08/21/2026B01066126-S1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/13/2026B01066126-I1Open ↗