DOB03/20/2023BUILDING HAS BEEN FULLY DEMOLISHED.THE REMAINDER EXISTINGDECK W/TIMBER PILES FOUNDATION WAS SEVERLY DETERIORATE W/LONG TERMWATER INFILTRATION THE VACATE OF THIS PROPERTY TO BE REMAINED.IMMEDIATELY VACATE THE ENTIRE PROPERTY UNTIL THE CONDITIONS HAVE BEEN REPAIRED UNDER PERMIT
DOB01/09/2023.FULLY DEMOLISH THE STRUCTURE
DOB12/19/2022EMER WORK.OBRVD ROOF WAS PRTLLY OPEN & EXPSD TO ELEMENTS THE CHIMNEY BRCKS APPRD TO BE LOOSE & DMGD W/ MORTAR DETERIORATION.THE LOWER ROOF ON EXP1 WAS PRTLLY CLLPSD.1ST FL CEILNG SAGGD & SEV ROTTEN OWNR TO IMMED RETAIN NYSPE & DOB REG CNTRCTR TO DEMO THE BLDG ACC TO NYCBL REG NYSPE TO SPRVSE ALL WRK,FULL TIME
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.