← Back
Walk-up apt, over six families with stores
664 BECK STREET
BRONX · BIN 2005093
💬 Discuss this project
1925Year Built
5Stories
C7Building Class
R7-1Zoning
34,200 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized150 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 664-672 BECK STREET HOUSING DEVELOPMENT FUND CO. · 10,156 sf lot · 3.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 3 docs
Bulkhead5p · 1 filing · 20 docs
Floor 5Under Construction60p · 3 filings · 20 docs
Floor 4Under Construction60p · 2 filings · 20 docs
Floor 3Under Construction61p · 3 filings · 20 docs
Floor 2Under Construction60p · 2 filings · 20 docs
Floor 1Under Construction64p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MHANY MANAGEMENT7409/01/2026
PROJECT EYE CONSULTANTS1607/08/2026
664-672 BECK ST HOUSING603/22/2026
TRI BOROUGH SCAFFOLDING103/22/2026
SHAH BUILDERS203/21/2026
664 BECK HOUSING HDFC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC1403/21/2026
AE DESIGN SOLUTION203/21/2026
CSR EXPEDITERS103/21/2026
THE GREEN STUDIO403/21/2026
AK CONSULTING SERVICES203/21/2026
HIERARCH-E203/21/2026
MILLENNIUM DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROJECT EYE CONSULTANTS IGeneral Contractor2107/08/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor804/09/2026
MC SUPERSTRUCTURE INCGeneral Contractor704/09/2026
PANDELI GJINIElectrical503/21/2026
NM MECHANICAL CORPPlumbing307/08/2026
ACCORD POWER INCGeneral Contractor204/09/2026
TECHNO-VOLT ELEC, INCElectrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803906/19/2026
SYNERGIC DESIGN LLC8561107/08/2025
Building Lifecycle
All (129)Filed (17)Permit Issued (33)Signed Off (2)Violation (60)Inspection (6)Objection (2)Special Inspection (9)
07/24/2026
Objection resolved — Addressed
07/21/2026
Violation issued (HPD, open)
B
07/21/2026
Violation issued (HPD, open)
A
06/29/2026
Objection raised — Scope
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
A
06/23/2026
Violation issued (HPD, open)
A
06/19/2026
Filed — Alteration
Renovation of an existing apartment building. water/sanitary piping, gas piping, gas fixtures, and bath/kitchen fixtures No change of use, egress, or occupancy under this application.
X00749147-P3
06/10/2026
Violation issued (HPD, closed)
A
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
A
06/10/2026
Violation issued (HPD, open)
C
05/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/29/2026
Violation issued (HPD, closed)
A
04/02/2026
Permit issued — Suspended Scaffold
X00749123-S1-SC
03/02/2026
Permit issued — Solar
X01248714-I1-SL
03/02/2026
Violation issued (HPD, closed)
B
03/02/2026
Violation issued (HPD, closed)
B
02/04/2026
Permit issued — General Construction
X00749123-I1-GC
01/29/2026
Violation issued (HPD, open)
C
01/29/2026
Violation issued (HPD, open)
C
01/29/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
C
01/23/2026
Violation issued (HPD, closed)
B
01/23/2026
Violation issued (HPD, closed)
B
01/23/2026
Violation issued (HPD, closed)
B
01/23/2026
Violation issued (HPD, closed)
C
01/05/2026
Permit issued — Mechanical Systems
X00749172-I1-MS
01/05/2026
Permit issued — Mechanical Systems
X00749172-I1-MS
01/05/2026
Permit issued — Structural
X00749123-S2-ST
12/07/2025
Violation issued (HPD, closed)
C
12/07/2025
Violation issued (HPD, open)
C
12/07/2025
Violation issued (HPD, open)
C
11/04/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00868217-I1
10/24/2025
Violation issued (HPD, closed)
C
10/24/2025
Violation issued (HPD, closed)
B
10/21/2025
Filed — Alteration
Renovation of an existing apartment building. water/sanitary piping, gas piping, gas fixtures, and bath/kitchen fixtures No change of use, egress, or occupancy under this application.
X00749147-P2
10/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2025
Permit issued — Solar
X01248714-I1-SL
10/11/2025
Violation issued (HPD, open)
C
10/06/2025
Violation issued (HPD, open)
C
09/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
09/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/19/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00868217-P3
09/18/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Filed — Alteration
Renovation of an existing apartment building. water/sanitary piping, gas piping, gas fixtures, and bath/kitchen fixtures No change of use, egress, or occupancy under this application.
X00749147-P1
08/21/2025
Permit issued — Suspended Scaffold
X00749123-S1-SC
08/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2025
Permit issued — Plumbing
X00749147-I1-PL
07/08/2025
Filed — Alteration
X01248714-I1
06/27/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00868217-P2
06/25/2025
Permit issued — Mechanical Systems
X00749172-I1-MS
06/20/2025
Permit issued — Supported Scaffold
X00868217-I1-SF
06/18/2025
Permit issued — Supported Scaffold
X00868217-I1-SH
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedESG INC04/02/2026
DOB NOWSolarSigned-offACCORD POWER INC03/02/2026
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I02/04/2026
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I01/05/2026
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I01/05/2026
DOB NOWStructuralSigned-offPROJECT EYE CONSULTANTS I01/05/2026
DOB NOWSolarSigned-offACCORD POWER INC10/14/2025
DOB NOWSuspended ScaffoldPermit IssuedESG INC08/21/2025
DOB NOWPlumbingPermit IssuedNM MECHANICAL CORP07/17/2025
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I06/25/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC06/20/2025
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC06/18/2025
DOB NOWStructuralSigned-offPROJECT EYE CONSULTANTS I05/12/2025
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I02/07/2025
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I01/07/2025
DOB NOWSuspended ScaffoldPermit IssuedESG INC10/29/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedPROJECT EYE CONSULTANTS I07/24/2024
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I07/24/2024
DOB NOWPlumbingPermit IssuedNM MECHANICAL CORP07/17/2024
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/17/2024
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/17/2024
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I01/09/2024
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I12/08/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC07/11/2023
DOB NOWSupported ScaffoldSigned-offMC SUPERSTRUCTURE INC07/11/2023
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING05/08/2023
DOB NOWSupported ScaffoldSigned-offTRI BOROUGH SCAFFOLDING05/08/2023
DOB NOWMechanical SystemsPermit IssuedPROJECT EYE CONSULTANTS I04/05/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedPROJECT EYE CONSULTANTS I02/03/2023
DOB NOWPlumbingPermit IssuedNM MECHANICAL CORP01/30/2023
DOB NOWGeneral ConstructionSigned-offPROJECT EYE CONSULTANTS I12/14/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING08/17/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING08/24/2021
BISEQISSUEDSHAH BUILDERS INC11/13/2014
BISBLISSUEDA & C COMBSTN.SERVICES09/26/2000
BISEQISSUEDGHOTRA GENERAL CONSTRUCTION08/16/2000
BISPLISSUEDPERFECT PLUMBING & HEATING07/31/2000
BISOTISSUEDPERFECT PLUMBING & HEATING07/31/2000
1 project · most recent 06/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/19/2026Permit IssuedNM MECHANICAL CORPGas, Storm, Water/Sanitary
8 projects · most recent 12/29/2025
General Wiring
FiledStatusContractorScope
12/29/2025CompleteTECHNO-VOLT ELEC, INC44 meters, 44 new_meters
09/23/2025CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
09/23/2025CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
09/23/2025CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
09/23/2025CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
07/08/2025CompleteACCORD POWER ELECTRIC LLC—
07/14/2021CompleteV. VASS ELECTRIC CORP—
03/22/2021Pending PaymentGEORGE HOLNESSGeneral Wiring
1 project · most recent 04/03/2025
Steel Wood
FiledStatusContractorScope
04/03/2025Permit IssuedESG INCSteel, Wood
1 project · most recent 04/03/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/03/2025Permit IssuedESG INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
05/26/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/26/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/26/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/30/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/30/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/30/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/30/2025FinalSAMI HAJJAR P.Eprogress
01/30/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
01/30/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/25/2026X00563670-I1Request digital key ↗
08/23/2026X00749172-I1Request digital key ↗
08/23/2026X00823734-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/11/2014240080363Open ↗
▸BISWORK PERMIT APPLICATION1
11/11/2014240080363Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/25/2026X00563670-I1Open ↗
08/23/2026X00749172-I1Open ↗
08/21/2026X00868217-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026X00749123-P2Open ↗
08/23/2026X00749147-P2Open ↗
08/23/2026X00749147-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026X00749123-P2Open ↗
08/23/2026X00749147-P2Open ↗
08/22/2026X00749147-P3Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/11/2014240080363Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/11/2014240080363Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/11/2014240080363Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/23/2026X00749172-I1Open ↗
08/14/2026X00749147-P3Open ↗
08/13/2026X00749147-I1Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/23/2026X00749172-I1Open ↗
08/19/2026X01248714-I1Open ↗
08/14/2026X00749147-P3Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/11/2014240080363Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026X00749123-S1Open ↗
▸DOB NOWCalculations1
08/13/2026X00749123-S1Open ↗