DOB08/14/2025Engr rpr indentifies undesigned,unpermitted gut reno,shoring, excavation &fdn work.bldg compromised req'd temp stabilization & biwkly inspctn.comply w code.retain nys pe&gc 2 stabilize bldg,pre- file plans by 815,plans by 818,strt by 8/25,daily wrk rprts,insptn
ECB08/05/2025Failure to safeguard the public and property affected by construction operations. At time of inspection, observed open & unguarded excavated pit located at rear yard of the building EXP3 approx. 13'ft(l) x 30'f$10K due
ECB08/05/2025Work without permit. Atoi, observed large excavated pit located at rear yard of the building exposure 3 approx. 13'ft(l) x 30'ft(w), and 6'ft deep with uncapped rebars protruding approx. 4'ft from bottom of the$12K due
DOB08/05/2025Work without permit. Atoi, observed large unsupported excavated pit at rear yard of the building exposure 3 approx. 13'ft(l) x 30'ft(w), and 6'ft deep with uncapped rebars protruding approx. 4'ft from bottom of the pit. No soe at rear & left-sides. Creating an immediately hazardous condition. No permits or records on BIS/DOB now for worked