← Back
BuildNYC
Five to six families
Fac Joe Shelter Retrofit Ghpp
666 6TH AVENUE · BIN 3017163
💬 Discuss this project
1931Year Built
4Stories
C2Building Class
R6BZoning
4,988 sfGross Floor Area
6Units
Rent Stabilized11 Active Violations ▸FDNY Report ↗
Five to six families · Owner of record: Fac Cluster Housing Development Fund Corp Poration · 1,875 sf lot · 2.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction7p · 1 filing · 20 docs
Floor 4Under Construction32p · 1 filing · 20 docs
Floor 3Under Construction32p · 1 filing · 20 docs
Floor 2Under Construction31p · 1 filing · 20 docs
Floor 1Heavy duty sidewalk shed installationUnder Construction36p · 2 filings · 20 docs
CellarUnder Construction37p · 1 filing · 20 docs
Site & exteriorSupported scaffold installation10p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fifth Ave Committee2507/08/2026
Fac - Restore - HDFC203/21/2026
Neighborhood Partnership Housing203/21/2026
Fac Cluster Housing Development Fund Corp Poration103/22/2026
NYC Department of Housing Preservation and Development103/21/2026
Joe Fac Infinity103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design206/06/2025
Mje Professional Services103/10/2025
L. Naoum, P.E., P. C206/25/2024
Old Structures Engineering103/04/2024
Eskw/A102/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design403/21/2026
Municipal Building Consultants403/21/2026
SNR Expediting Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. ConstructionGeneral Contractor607/08/2026
MSR ConstructionScaffold506/28/2026
Reliable EnterprisesScaffold510/20/2026
AJC Plumbing & HeatingPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803406/25/2024
Building Lifecycle
All (164)Filed (7)Permit Issued (15)Signed Off (2)Violation (60)Inspection (4)Objection (46)Special Inspection (30)
10/19/2026
Permit issued — Sidewalk Shed
B01192517-I1-SH
09/29/2026
Violation issued (ECB, open)
Construction
07/23/2026
Permit issued — Sidewalk Shed
B01192517-I1-SH
06/26/2026
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01219847-I1
06/26/2026
Signed off — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01219899-I1
05/07/2026
Permit issued — Sidewalk Shed
B01192517-I1-SH
05/07/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/06/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/06/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/05/2026
Violation issued (ECB, closed)
Construction
04/30/2026
Violation issued (HPD, closed)
A
03/03/2026
Permit issued — Structural
B00991632-S3-ST
03/02/2026
Permit issued — General Construction
B00991632-I1-GC
03/02/2026
Permit issued — Mechanical Systems
B00991632-S2-MS
01/29/2026
Permit issued — Mechanical Systems
B00991632-S2-MS
01/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/05/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/24/2025
Violation issued (ECB, open)
Construction
07/24/2025
Permit issued — Supported Scaffold
B01219847-I1-SF
07/24/2025
Permit issued — Protection and Mechanical Methods
B01219899-I1-PMM
07/02/2025
Violation issued (FDNY_NOV, closed)
06/09/2025
Permit issued — Protection and Mechanical Methods
B01219899-I1-PMM
06/09/2025
Permit issued — Supported Scaffold
B01219847-I1-SF
06/06/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01219847-I1
06/06/2025
Filed — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01219899-I1
05/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/30/2025
Permit issued — Plumbing
B00991632-S1-PL
03/11/2025
Permit issued — Sidewalk Shed
B01192517-I1-SH
03/10/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01192517-I1
03/10/2025
Permit issued — Structural
B00991632-S3-ST
03/05/2025
Permit issued — General Construction
B00991632-I1-GC
01/03/2025
Violation issued (FDNY_NOV, closed)
10/03/2024
Violation issued (HPD, closed)
A
10/03/2024
Violation issued (HPD, closed)
A
10/03/2024
Violation issued (HPD, closed)
C
10/03/2024
Violation issued (HPD, open)
B
10/03/2024
Violation issued (HPD, open)
B
10/03/2024
Violation issued (HPD, open)
B
10/03/2024
Violation issued (HPD, open)
A
10/03/2024
Violation issued (HPD, open)
B
10/03/2024
Violation issued (HPD, open)
C
10/03/2024
Violation issued (HPD, open)
B
10/03/2024
Violation issued (HPD, open)
B
10/03/2024
Violation issued (HPD, open)
B
10/03/2024
Violation issued (HPD, closed)
A
09/04/2024
Objection resolved — Addressed
09/04/2024
Special inspection requirement — Wood – Seismic Resistance
SAMI HAJJAR P.E
07/05/2024
Objection resolved — Addressed
07/05/2024
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
07/05/2024
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
06/25/2024
Filed — Alteration
EXISTING HEATING PIPING REMOVAL, NEW HEAT PUMP VRF SYSTEM, ASSOCIATED DUCTWORK. NEW TOILET EXHAUST FANS ON ROOF, AND ASSOCIATED DUCTWORK MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00991632-S2
06/24/2024
Objection resolved — Addressed
06/12/2024
Filed — Alteration
EXISTING HEATING PIPING REMOVAL, NEW HEAT PUMP VRF SYSTEM, ASSOCIATED DUCTWORK. NEW TOILET EXHAUST FANS ON ROOF, AND ASSOCIATED DUCTWORK MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00991632-S1
06/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
06/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection resolved — Addressed
05/28/2024
Objection resolved — Addressed
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises10/19/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises07/23/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises05/07/2026
DOB NOWStructuralPermit IssuedA.A.D. Construction03/03/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/02/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction03/02/2026
DOB NOWMechanical SystemsPermit IssuedA.A.D. Construction01/29/2026
DOB NOWSupported ScaffoldSigned-offMSR Construction07/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR Construction07/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR Construction06/09/2025
DOB NOWSupported ScaffoldSigned-offMSR Construction06/09/2025
DOB NOWPlumbingPermit IssuedAJC Plumbing & Heating04/30/2025
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises03/11/2025
DOB NOWStructuralPermit IssuedA.A.D. Construction03/10/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. Construction03/05/2025
BIS—ISSUEDCrescent Street Construction05/15/2006
BISEQISSUEDCrescent Street Construction05/15/2006
BISSPISSUEDAura Plumbing03/10/2006
BISEQISSUEDCrescent Street Construction01/10/2006
BIS—ISSUEDCrescent Street Construction06/06/2005
BISEQISSUEDCrescent Street Construction06/06/2005
BISOTISSUEDBlue Chip Construction08/24/2001
1 project · most recent 06/25/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/25/2024Permit IssuedA.A.D. ConstructionAir Conditioning Systems
Cooling
Mitsubishi Electric PKFY-P04NLMU-E.TH 4,000 BTU · Vrf Indoor ×24
MXZ-SM48NAMHZ2-U1 48,000 BTU · Vrf Outdoor ×2
1 project · most recent 06/25/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/25/2024Permit IssuedAJC Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 07/28/2025
General Wiring
FiledStatusContractorScope
07/28/2025Permit IssuedAmr Electrical ContractingGeneral Wiring
03/11/2025Permit IssuedRichard Neu—
1 project · most recent 06/25/2024
Steel Concrete Masonry Wood
FiledStatusContractorScope
06/25/2024Permit IssuedA.A.D. ConstructionSteel, Concrete, Masonry, Wood
2 projects · most recent 06/06/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
06/06/2025Signed-offMSR ConstructionScaffold
03/10/2025Permit IssuedReliable EnterprisesSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
09/04/2024Wood – Seismic ResistanceSAMI HAJJAR P.Especial
07/05/2024Structural Steel - WeldingSAMI HAJJAR P.Especial
07/05/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
06/12/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
06/12/2024HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/12/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/04/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/04/2024Structural Wood FrameSAMI HAJJAR P.Eprogress
02/27/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
02/27/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
02/27/2024Shutoff dampersSAMI HAJJAR P.Eenergy_progress
02/27/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
02/27/2024HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
02/27/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
02/27/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/30/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
01/30/2024MasonrySAMI HAJJAR P.Especial
01/26/2024Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
01/26/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
01/26/2024Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
01/26/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
01/26/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
01/26/2024Lighting controlsSAMI HAJJAR P.Eenergy_progress
01/26/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
01/26/2024FinalSAMI HAJJAR P.Eprogress
Latest 25 of 33.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026B00991632-S1Request digital key ↗
08/25/2026B00991632-S2Request digital key ↗
08/22/2026B01192517-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026B00991632-S3Open ↗
08/25/2026B00991632-S2Open ↗
08/25/2026B00991632-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00991632-S3Open ↗
08/28/2026B00991632-S2Open ↗
08/28/2026B00991632-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00991632-S3Open ↗
08/28/2026B00991632-S2Open ↗
08/27/2026B00991632-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/25/2026B00991632-S2Open ↗
08/25/2026B00991632-S1Open ↗
08/15/2026B00991632-S3Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/25/2026B00991632-S1Open ↗
08/25/2026B00991632-S2Open ↗
08/15/2026B00991632-S3Open ↗
Showing 3 of 4 on file for this type