← Back
Primarily 5-6 family with 1 store or office
666 GRAND STREET
BROOKLYN · BIN 3069571
💬 Discuss this project
1920Year Built
4Stories
S5Building Class
C4-4AZoning
5,500 sfGross Floor Area
7Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: TRIPLE 6 ON GRAND LLC · 1,875 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 31p · 1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 1Under Construction3p · 3 filings · 20 docs
CellarUnder Construction5p · 3 filings · 20 docs
1 job · most recent 08/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026Permit IssuedYAD REALTY MANAGEMENT LLCHeating and Air Conditioning Systems
Heat / Cool
Tosot TWH09AT19D6DI 9,000 BTU · Split System ×4
TWH12AT19D6DI 12,000 BTU · Split System ×4
TM36D6MO 3 tons · Heat Pump Outdoor ×1
TM48D6MO 4 tons · Heat Pump Outdoor ×1
1 job · most recent 11/02/2021
Gas
FiledStatusContractorScope
11/02/2021Permit IssuedL&J PLG & HTG CO OF NY INGas
1 job · most recent 08/25/2026
FiledStatusContractorScope
08/25/2026Permit IssuedRICHARD NEU—
2 jobs · most recent 08/25/2026
Sidewalk Shed Fence
FiledStatusContractorScope
08/25/2026Permit IssuedCLASSIC CONSULTING GROUPSidewalk Shed
08/24/2026Permit IssuedCLASSIC CONSULTING GROUPFence
Building Lifecycle
All (36)Filed (7)Permit Issued (5)Violation (7)Inspection (5)Objection (8)Special Inspection (4)
09/15/2026
Permit issued — Mechanical Systems
B01446025-I1-GC-CX
08/25/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B01450534-I1
08/25/2026
Permit issued — Sidewalk Shed
B01450534-I1-SH
08/25/2026
Permit issued — Construction Fence
B01450546-I1-FN
08/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION OF CHAIN LINK FENCE AND JERSEY BARRICADES WITH DOORS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01450546-I1
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/20/2026
Objection resolved — Resolved
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
08/14/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF NEW STOREFRONT, INTERIOR FINISHES AND NON-LOAD BEARING PARTITIONS. NO CHANGE TO USE EGRESS OR OCCUPANCY
B01446025-I1
05/29/2026
Filed — Alteration
PROPOSED INTERIOR DEMOLITION OF EXISTING FINISHES AND NON-LOAD BEARING PARTITIONS. NO CHANGE TO USE EGRESS OR OCCUPANCY
B01370792-P1
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Belal Salim
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Belal Salim
05/29/2026
Special inspection requirement — Final
Belal Salim
05/04/2026
Violation issued (HPD, open)
A
04/01/2026
Permit issued — General Construction
B01370792-I1-GC
03/13/2026
Filed — Alteration
PROPOSED INTERIOR DEMOLITION OF EXISTING FINISHES AND NON-LOAD BEARING PARTITIONS. NO CHANGE TO USE EGRESS OR OCCUPANCY
B01370792-I1
11/18/2025
Violation issued (HPD, closed)
I
06/09/2025
Violation issued (HPD, closed)
A
02/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/17/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/07/2021
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
11/24/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/02/2021
Filed — Alteration
INSTALLATION OF NEW GAS METER IN CELLER FLOOR AND NEW GAS RISER FROM CELLAR FLOOR THROUGH 1ST, 2ND, AND 3RD FLOORS
B00507335-P1
10/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Seungchul Ok
09/22/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/03/2021
Permit issued — Plumbing
B00507335-I1-PL
06/14/2021
Filed — Alteration
INSTALLATION OF NEW GAS METER IN CELLER FLOOR AND NEW GAS RISER FROM CELLAR FLOOR THROUGH 1ST, 2ND, AND 3RD FLOORS
B00507335-I1
04/09/2021
Violation issued (HPD, closed)
A
10/09/2015
Violation issued (HPD, closed)
I
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CLASSIC CONSULTING GROUP409/13/2026
TRIPLE 6 ON GRAND LLC103/22/2026
C/O PAUL SCAROLA (OWNERS REP.)103/21/2026
C O PAUL SCAROLA OWNERS REP303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/16/2024$2.2M—Private party → TRIPLE 6 ON GRAND LLC$400/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALSIEUX ARCHITECTURE, LLC.208/25/2026
BFS ARCHITECT PC308/14/2026
ECOPLUSDESIGN211/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EB STUDIO EXP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLASSIC CONSULTING GROUPGeneral Contractor208/26/2026
YAD REALTY MANAGEMENT LLCGeneral Contractor209/16/2026
BENJAMIN DREBINElectrical103/21/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BFS ARCHITECT PC7477205/29/2026
ECOPLUSDESIGN2887211/02/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedYAD REALTY MANAGEMENT LLC09/15/2026
DOB NOWSidewalk ShedPermit IssuedCLASSIC CONSULTING GROUP08/25/2026
DOB NOWConstruction FencePermit IssuedCLASSIC CONSULTING GROUP08/25/2026
DOB NOWGeneral ConstructionPermit IssuedYAD REALTY MANAGEMENT LLC04/01/2026
DOB NOWPlumbingPermit IssuedL&J PLG & HTG CO OF NY IN08/03/2021
BISPLISSUEDNEW YORK HEATING CORP03/15/2006
BISBLISSUEDNEW YORK HEATING CORP03/15/2006
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/07/2021No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
11/24/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/22/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/29/2026Fire-Resistant Penetrations and JointsBelal Salimspecial
05/29/2026Tenant Protection Plan ComplianceBelal Salimspecial
05/29/2026FinalBelal Salimprogress
10/27/2021Fire-Resistant Penetrations and JointsSeungchul Okspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026B00507335-I1Request digital key ↗
08/31/2026B00507335-P1Request digital key ↗
08/26/2026B01450534-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00507335-P1Open ↗
08/31/2026B00507335-I1Open ↗
08/26/2026B01450534-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B00507335-P1Open ↗
08/27/2026B01370792-I1Open ↗
08/27/2026B01370792-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01370792-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026B00507335-I1Open ↗
08/31/2026B00507335-P1Open ↗
08/16/2026B01370792-I1Open ↗
Showing 3 of 5 on file for this type