← Back
One family attached or semi-detached
666 SARATOGA AVENUE
BROOKLYN · Brownsville · BIN 3081610
💬 Discuss this project
1986Year Built
2Stories
A5Building Class
R6Zoning
1,116 sfGross Floor Area
1Units
One family attached or semi-detached · 1,800 sf lot · 0.62 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC204/08/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272204/08/2026
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Special Inspection (5)
04/08/2026
Filed — Alteration
B01315908-P1
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/03/2026
Special inspection requirement — Final
Walid Abdulla
03/03/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/17/2025
Permit issued — Solar
B01315908-I1-SL
11/10/2025
Filed — Alteration
B01315908-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC11/17/2025
1 project · most recent 05/26/2026
FiledStatusContractorScope
05/26/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/03/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/03/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/03/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/03/2026FinalWalid Abdullaprogress
03/03/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026B01315908-I1Request digital key ↗
08/19/2026B01315908-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B01315908-P1Open ↗
08/31/2026B01315908-P1Open ↗
08/31/2026B01315908-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026B01315908-P1Open ↗
08/19/2026B01315908-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B01315908-P1Open ↗
08/31/2026B01315908-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026B01315908-P1Open ↗
08/19/2026B01315908-I1Open ↗