← Back
Parochial school, yeshiva
6660 AVENUE U
BROOKLYN · BIN 3397972
💬 Discuss this project
2019Year Built
1Stories
W2Building Class
C3Zoning
8,097 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Parochial school, yeshiva · Owner of record: ANDA PROPERTIES CO. LLC · 20,264 sf lot · 0.4 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 125p · 1 filing · 20 docs
Cellar19p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ANDA PROPERTIES4803/22/2026
AMERICAN PRO BUILDERS403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB1101/12/2026
ADVANCED ENGINEERING & INSPECT. PLL310/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)1903/21/2026
ISTAY CONSULTING203/21/2026
XPDITE GROUP LLC 105303/21/2026
XPDITE GROUP LLC 104103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Y&M HOME BUILDERS INCGeneral Contractor303/21/2026
S&R ELECTRICAL & MECHANICElectrical103/22/2026
PIPING & PLUMBING SOLUTIOFire Protection107/08/2026
EMPIRE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GONY ARCHITECT & PLNNER P36291401/12/2026
Building Lifecycle
All (68)Filed (14)Permit Issued (3)Signed Off (3)Violation (10)Inspection (8)Special Inspection (30)
02/24/2026
Signed off — Alteration CO
Modification of the existing sprinkler system
B00661870-I1
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Fenestration areas
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Interior lighting power
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Lighting controls
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Air barrier - visual inspection
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Fenestration air leakage
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Maintenance information
Vitaly Ganopolsky
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vitaly Ganopolsky
01/12/2026
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-B2
11/03/2025
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-A9
10/29/2025
Special inspection requirement — Fenestration air leakage
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Maintenance information
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Fenestration areas
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Air barrier - visual inspection
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Lighting controls
Vitaly Ganopolsky
10/29/2025
Special inspection requirement — Interior lighting power
Vitaly Ganopolsky
09/03/2025
Signed off — Alteration CO
Modification of the existing sprinkler system
B00661870-S2
08/08/2025
Signed off — Alteration CO
Modification of the existing sprinkler system
B00661870-S1
07/30/2025
Special inspection requirement — Fenestration areas
Vitaly Ganopolsky
07/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Vitaly Ganopolsky
07/30/2025
Special inspection requirement — Interior lighting power
Vitaly Ganopolsky
07/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Vitaly Ganopolsky
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vitaly Ganopolsky
07/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vitaly Ganopolsky
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Vitaly Ganopolsky
07/30/2025
Special inspection requirement — Fenestration air leakage
Vitaly Ganopolsky
05/13/2025
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-A7
03/19/2025
Violation issued (ECB, closed)
Construction
02/04/2025
Violation issued (FDNY_NOV, closed)
10/16/2023
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-A2
05/15/2023
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-P9
08/29/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-P8
08/17/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-P7
08/11/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-P6
07/29/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-P5
07/20/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/18/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/06/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/05/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-P2
06/29/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/27/2022
Permit issued — Sprinklers
B00661870-S1-EW-SP
04/27/2022
Permit issued — Plumbing
B00661870-S2-PL
03/18/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-P1
03/16/2022
Permit issued — General Construction
B00661870-I1-GC
03/15/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-S2
03/02/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-S1
02/04/2022
Filed — Alteration CO
Modification of the existing sprinkler system
B00661870-I1
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offEMPIRE PLUMBING INC04/27/2022
DOB NOWPlumbingSigned-offEMPIRE PLUMBING INC04/27/2022
DOB NOWGeneral ConstructionPermit IssuedY&M HOME BUILDERS INC03/16/2022
BISPLISSUEDMEGA PLBG CORP03/01/2021
BISSPISSUEDMEGA PLBG CORP12/22/2020
BISPLISSUEDMEGA PLBG CORP12/18/2020
BIS—ISSUEDFIRST CNSTRCTION ZONE INC11/04/2020
BIS—ISSUEDAMERICAN PRO BUILDERS*12/06/2019
BIS—ISSUEDAMERICAN PRO BUILDERS*12/06/2019
BISSPISSUEDMEGA PLBG CORP04/25/2019
BISPLISSUEDMEGA PLBG CORP04/01/2019
BISEQISSUEDAMERICAN PRO BUILDERS*03/26/2019
BIS—ISSUEDAMERICAN PRO BUILDERS*03/26/2019
BISMHISSUEDAMERICAN PRO BUILDERS*02/25/2019
BIS—ISSUEDAMERICAN PRO BUILDERS*03/22/2018
BIS—ISSUEDAMERICAN PRO BUILDERS*02/16/2018
BIS—ISSUEDAMERICAN PRO BUILDERS*09/20/2017
BIS—ISSUEDAMERICAN PRO BUILDERS*09/20/2017
BIS—ISSUEDAMERICAN PRO BUILDERS*06/27/2017
BISEQISSUEDAMERICAN PRO BUILDERS*06/27/2017
BIS—ISSUEDAMERICAN PRO BUILDERS*06/27/2017
1 project · most recent 01/12/2026
Sprinkler System
FiledStatusContractorScope
01/12/2026Signed-offPIPING & PLUMBING SOLUTIOSprinkler System
1 project · most recent 01/12/2026
Water/Sanitary
FiledStatusContractorScope
01/12/2026Signed-offEMPIRE PLUMBING INCWater/Sanitary
2 projects · most recent 07/19/2022
General Wiring
FiledStatusContractorScope
07/19/2022CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
12/27/2018CompleteMANELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/20/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2022Fail-Final CND-Occupancy InspectionFailView ↗
07/06/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/29/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
01/21/2026Fenestration and door U-factor and product ratingsVitaly Ganopolskyenergy_progress
01/21/2026Fenestration air leakageVitaly Ganopolskyenergy_progress
01/21/2026Energy Code Compliance InspectionsVitaly Ganopolskyprogress
01/21/2026Fire-Resistance Rated ConstructionVitaly Ganopolskyprogress
01/21/2026Fire-Resistant Penetrations and JointsVitaly Ganopolskyspecial
01/21/2026Structural Stability – Alterations of existing buildingsVitaly Ganopolskyspecial
01/21/2026Air barrier - visual inspectionVitaly Ganopolskyenergy_progress
01/21/2026Fenestration areasVitaly Ganopolskyenergy_progress
01/21/2026Lighting controlsVitaly Ganopolskyenergy_progress
01/21/2026Interior lighting powerVitaly Ganopolskyenergy_progress
01/21/2026Maintenance informationVitaly Ganopolskyenergy_progress
10/29/2025Interior lighting powerVitaly Ganopolskyenergy_progress
10/29/2025Fenestration areasVitaly Ganopolskyenergy_progress
10/29/2025Fenestration and door U-factor and product ratingsVitaly Ganopolskyenergy_progress
10/29/2025Maintenance informationVitaly Ganopolskyenergy_progress
10/29/2025Lighting controlsVitaly Ganopolskyenergy_progress
10/29/2025Fenestration air leakageVitaly Ganopolskyenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsVitaly Ganopolskyspecial
10/29/2025Structural Stability – Alterations of existing buildingsVitaly Ganopolskyspecial
10/29/2025Energy Code Compliance InspectionsVitaly Ganopolskyprogress
10/29/2025Fire-Resistance Rated ConstructionVitaly Ganopolskyprogress
10/29/2025Air barrier - visual inspectionVitaly Ganopolskyenergy_progress
07/30/2025Interior lighting powerVitaly Ganopolskyenergy_progress
07/30/2025Fenestration and door U-factor and product ratingsVitaly Ganopolskyenergy_progress
07/30/2025Energy Code Compliance InspectionsVitaly Ganopolskyprogress
Latest 25 of 80.
▾Documents — 260 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/26/2026B00661870-A7Request digital key ↗
08/26/2026B00661870-S2Request digital key ↗
08/26/2026B00661870-S1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits43
▸BISPLAN / WORK APPROVAL APPLICATION23
05/19/2021320442357Open ↗
05/10/2021320560594Open ↗
05/10/2021320560585Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION15
03/01/2021340655428Open ↗
11/05/2020320442357Open ↗
12/09/2019320442357Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/15/2016320442357Open ↗
05/15/2016320442357Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
05/30/2012320457108Open ↗
04/05/2012320457108Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/05/2021320442357Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZoning Exhibit form (1-5)9
08/13/2026B00661870-A7Open ↗
08/13/2026B00661870-P9Open ↗
08/13/2026B00661870-P6Open ↗
Showing 3 of 9 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
03/16/2012320442357Open ↗
▸BISVERIFY TAX LOT1
06/01/2021320442357Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/01/2021320442357Open ↗
▸BISZONING DIAGRAM1
06/13/2012320442357Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
03/16/2012320442357Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00661870-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature16
08/29/2026B00661870-P2Open ↗
08/29/2026B00661870-P2Open ↗
08/28/2026B00661870-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/26/2026B00661870-I1Open ↗
08/26/2026B00661870-S2Open ↗
08/26/2026B00661870-S1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026B00661870-P2Open ↗
08/28/2026B00661870-I1Open ↗
08/28/2026B00661870-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/16/2019340655428Open ↗
07/03/2018340606400Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/16/2019340655428Open ↗
07/03/2018340606400Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/16/2012320560585Open ↗
10/16/2012320560594Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/16/2019340655428Open ↗
07/03/2018340606400Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/16/2012320560585Open ↗
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING9
01/25/2021340655428Open ↗
01/20/2021340655428Open ↗
01/15/2021340655428Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
04/06/2021340606400Open ↗
03/23/2021340606400Open ↗
03/23/2021340606400Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS1
03/23/2021340606400Open ↗
▸Safety & Tenant Protection21
▸DOB NOWStreet Tree Checklist11
08/26/2026B00661870-I1Open ↗
08/26/2026B00661870-A7Open ↗
08/26/2026B00661870-P5Open ↗
Showing 3 of 11 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT4
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
Showing 3 of 4 on file for this type
▸BISST-1 Street Tree Checklist2
05/30/2012320457108Open ↗
05/24/2012320442357Open ↗
▸BISSTREET TREE CHECKLIST2
06/02/2017320442357Open ↗
03/06/2012320442357Open ↗
▸BISSTREET TREE SIGNOFF1
06/01/2021320442357Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/10/2019320457108Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/24/2012320442357Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/17/2021340606400Open ↗
03/17/2021340606400Open ↗
02/08/2019340606400Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
06/01/2021320442357Open ↗
03/23/2021340606400Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/06/2012320442357Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/03/2018340606400Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/16/2012320560594Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00661870-I1Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/17/2021340606400Open ↗
03/17/2021340606400Open ↗
01/20/2021340655428Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
▸BISBORINGS - TEST PITS (TR-4) 27-7202
06/02/2012320442357Open ↗
06/02/2012320442357Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
06/01/2021320442357Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/01/2021320442357Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS4
10/16/2012320560585Open ↗
10/16/2012320560594Open ↗
04/05/2012320457108Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/23/2021340606400Open ↗
03/17/2021340655428Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
05/19/2021320442357Open ↗
03/06/2012320442357Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/24/2012320442357Open ↗
▸BISACPE Objection Review Request1
10/10/2019320457108Open ↗
▸Cost, Insurance & Ownership19
▸BISPROJECT-SPECIFIC GL INSURANCE7
11/05/2020320442357Open ↗
12/09/2019320442357Open ↗
03/26/2019320442357Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT6
01/16/2019340655428Open ↗
07/03/2018340606400Open ↗
10/16/2012320560585Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
06/30/2017320442357Open ↗
06/30/2017320442357Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
03/17/2021340606400Open ↗
03/17/2021340655428Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
12/09/2019320442357Open ↗
03/26/2019320442357Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION6
06/01/2021320442357Open ↗
02/03/2021340655428Open ↗
01/29/2021340606400Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
10/16/2012320560594Open ↗
10/16/2012320560585Open ↗
04/05/2012320457108Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/16/2019340655428Open ↗
07/03/2018340606400Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/05/2012320457108Open ↗
▸Other Documents15
▸DOB NOWProperty Ownership Certification11
08/26/2026B00661870-I1Open ↗
08/26/2026B00661870-A7Open ↗
08/26/2026B00661870-B2Open ↗
Showing 3 of 11 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
12/09/2019320442357Open ↗
12/09/2019320442357Open ↗
▸BISPLOT DIAGRAM1
03/06/2012320442357Open ↗
▸BISSITE CONNECTION: DEP1
06/04/2012320442357Open ↗