← Back
One family attached or semi-detached
67-02 211 STREET
QUEENS · Oakland Gardens-Hollis Hills · BIN 4162892
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R3-1Zoning
896 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,500 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS408/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J CALIENDO ARCHITECT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHIL VALENZA CONTRACTINGGeneral Contractor203/21/2026
ARISTA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOYUN KIM; RA7415408/11/2022
Building Lifecycle
All (18)Filed (4)Permit Issued (2)Signed Off (2)Violation (1)Inspection (6)Special Inspection (3)
09/20/2023
Signed off — Alteration
PROPOSED ALTERATION TYPE II : REAR YARD MODIFICATION; REPLACE EXISTING RETENTION WALLS, BUILD NEW STONE RETENTION WALLS, AND BUILD NEW PATIO IN REAR YARD.
Q00579138-S1
09/13/2022
Signed off — Alteration
PROPOSED ALTERATION TYPE II : REAR YARD MODIFICATION; REPLACE EXISTING RETENTION WALLS, BUILD NEW STONE RETENTION WALLS, AND BUILD NEW PATIO IN REAR YARD.
Q00579138-I1
08/30/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/25/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/22/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/17/2022
Special inspection requirement — Concrete - Cast-In-Place
DOYUN KIM
08/11/2022
Filed — Alteration
PROPOSED ALTERATION TYPE II : REAR YARD MODIFICATION; REPLACE EXISTING RETENTION WALLS, BUILD NEW STONE RETENTION WALLS, AND BUILD NEW PATIO IN REAR YARD.
Q00579138-P2
07/15/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/22/2022
Permit issued — Plumbing
Q00579138-S1-PL
02/23/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/06/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/23/2021
Permit issued — General Construction
Q00579138-I1-GC
10/29/2021
Filed — Alteration
PROPOSED ALTERATION TYPE II : REAR YARD MODIFICATION; REPLACE EXISTING RETENTION WALLS, BUILD NEW STONE RETENTION WALLS, AND BUILD NEW PATIO IN REAR YARD.
Q00579138-S1
10/20/2021
Filed — Alteration
PROPOSED ALTERATION TYPE II : REAR YARD MODIFICATION; REPLACE EXISTING RETENTION WALLS, BUILD NEW STONE RETENTION WALLS, AND BUILD NEW PATIO IN REAR YARD.
Q00579138-P1
10/13/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
DOYUN KIM
10/13/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
DOYUN KIM
08/24/2021
Filed — Alteration
PROPOSED ALTERATION TYPE II : REAR YARD MODIFICATION; REPLACE EXISTING RETENTION WALLS, BUILD NEW STONE RETENTION WALLS, AND BUILD NEW PATIO IN REAR YARD.
Q00579138-I1
05/24/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARISTA PLBG & HTG CORP06/22/2022
DOB NOWGeneral ConstructionSigned-offPHIL VALENZA CONTRACTING11/23/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/30/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/25/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/22/2022Fail-Final General Construction Non-Directive 14FailView ↗
07/15/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/23/2022Fail-Final General Construction Non-Directive 14FailView ↗
01/06/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/17/2022Concrete - Cast-In-PlaceDOYUN KIMspecial
10/13/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDOYUN KIMspecial
10/13/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesDOYUN KIMspecial
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00579138-P2Request digital key ↗
08/27/2026Q00579138-S1Request digital key ↗
08/27/2026Q00579138-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00579138-S1Open ↗
08/27/2026Q00579138-P1Open ↗
08/27/2026Q00579138-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00579138-S1Open ↗
08/25/2026Q00579138-I1Open ↗