← Back
Walk-up cooperative
67-02 SPRINGFIELD BLVD
QUEENS · BIN 4596427
💬 Discuss this project
1949Year Built
2Stories
C6Building Class
R3-2Zoning
554,300 sfGross Floor Area
467Units
LL97 CoveredRent Stabilized3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: BELL PARK GARDENS · 902,780 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG ENGINEERING PLLC303/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCX DESIGN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RONG MAINTENANCE INCGeneral Contractor303/21/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG ENGINEERING PLLC8512303/20/2025
Building Lifecycle
All (24)Filed (3)Permit Issued (2)Signed Off (2)Inspection (2)Special Inspection (15)
03/28/2025
Signed off — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01140999-I1
03/28/2025
Signed off — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01140999-S1
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
03/24/2025
Special inspection requirement — Final
XIAO ZHENG
03/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
03/24/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
03/24/2025
Special inspection requirement — Interior lighting power
XIAO ZHENG
03/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
03/20/2025
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01140999-P1
03/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
03/20/2025
Special inspection requirement — Final
XIAO ZHENG
03/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
03/20/2025
Special inspection requirement — Interior lighting power
XIAO ZHENG
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
03/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/10/2024
Permit issued — General Construction
Q01140999-I1-GC
12/06/2024
Permit issued — Plumbing
Q01140999-S1-PL
11/26/2024
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01140999-I1
11/26/2024
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01140999-S1
11/18/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
11/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
11/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC12/10/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC12/06/2024
1 job · most recent 12/10/2024
General Wiring
FiledStatusContractorScope
12/10/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
03/24/2025Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
03/24/2025FinalXIAO ZHENGprogress
03/24/2025Fire-Resistance Rated ConstructionXIAO ZHENGprogress
03/24/2025Energy Code Compliance InspectionsXIAO ZHENGprogress
03/24/2025Interior lighting powerXIAO ZHENGenergy_progress
03/24/2025HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
03/20/2025HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
03/20/2025FinalXIAO ZHENGprogress
03/20/2025Fire-Resistance Rated ConstructionXIAO ZHENGprogress
03/20/2025Interior lighting powerXIAO ZHENGenergy_progress
03/20/2025Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
03/20/2025Energy Code Compliance InspectionsXIAO ZHENGprogress
11/18/2024Energy Code Compliance InspectionsXIAO ZHENGprogress
11/12/2024HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
11/12/2024Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q01140999-I1Request digital key ↗
08/21/2026Q01140999-S1Request digital key ↗
08/21/2026Q01140999-P1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature12
08/28/2026Q01140999-P1Open ↗
08/28/2026Q01140999-P1Open ↗
08/28/2026Q01140999-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01140999-I1Open ↗
08/21/2026Q01140999-S1Open ↗
08/21/2026Q01140999-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026Q01140999-P1Open ↗
08/24/2026Q01140999-S1Open ↗
08/24/2026Q01140999-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026Q01140999-P1Open ↗
08/21/2026Q01140999-I1Open ↗
08/21/2026Q01140999-S1Open ↗