← Back
Walk-up cooperative
67-02 SPRINGFIELD BLVD
QUEENS · BIN 4596492
💬 Discuss this project
1949Year Built
2Stories
C6Building Class
R3-2Zoning
554,300 sfGross Floor Area
467Units
LL97 CoveredRent Stabilized3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Walk-up cooperative · Owner of record: BELL PARK GARDENS · 902,780 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BELL PARK GARDENS307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG ENGINEERING PLLC204/04/2025
LAWLESS & MANGIONE109/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BG & ASSOCIATES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERSI CONTRACTING CORPGeneral Contractor107/08/2026
RONG MAINTENANCE INCGeneral Contractor104/09/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG ENGINEERING PLLC8512204/04/2025
SPECIAL TESTING & CONSULT1688109/29/2022
Building Lifecycle
All (19)Filed (3)Permit Issued (3)Signed Off (2)Inspection (2)Special Inspection (9)
12/08/2025
Signed off — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01200394-I1
12/08/2025
Signed off — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01200394-S1
11/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2025
Permit issued — Plumbing
Q01200394-S1-PL
04/18/2025
Permit issued — General Construction
Q01200394-I1-GC
04/04/2025
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01200394-I1
04/04/2025
Filed — Alteration
INTERIOR ALTERATION OF AN EXISTING SINGLE-FAMILY DUPLEX UNIT WITH PARTITION WALL WORK. RELOCATION AND REPLACEMENT OF NEW FIXTURES, FINISHES, AND LIGHTING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01200394-S1
04/04/2025
Special inspection requirement — Final
XIAO ZHENG
03/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAO ZHENG
03/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAO ZHENG
03/25/2025
Special inspection requirement — Energy Code Compliance Inspections
XIAO ZHENG
03/25/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIAO ZHENG
03/15/2023
Permit issued — General Construction
Q00755958-I1-GC
09/29/2022
Filed — Alteration
Q00755958-I1
06/20/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
SEBASTIAN SETTEDUCATE JR., P.E
06/20/2022
Special inspection requirement — Air barrier continuity plan testing
Kenneth Santelli
06/20/2022
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
06/12/2022
Special inspection requirement — Final
Kenneth Santelli
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC04/24/2025
DOB NOWGeneral ConstructionSigned-offRONG MAINTENANCE INC04/18/2025
DOB NOWGeneral ConstructionPermit IssuedPERSI CONTRACTING CORP03/15/2023
1 job · most recent 04/23/2025
General Wiring
FiledStatusContractorScope
04/23/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
04/04/2025FinalXIAO ZHENGprogress
03/25/2025HVAC-R and service water piping design and insulationXIAO ZHENGenergy_progress
03/25/2025Fire-Resistant Penetrations and JointsXIAO ZHENGspecial
03/25/2025Energy Code Compliance InspectionsXIAO ZHENGprogress
03/25/2025Fire-Resistance Rated ConstructionXIAO ZHENGprogress
06/20/2022Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
06/20/2022Air barrier continuity plan testingKenneth Santellienergy_progress
06/20/2022MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
06/12/2022FinalKenneth Santelliprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q00755958-I1Request digital key ↗
08/20/2026Q01200394-I1Request digital key ↗
08/20/2026Q01200394-S1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature6
09/27/2026Q01200394-I1Open ↗
09/27/2026Q01200394-I1Open ↗
09/27/2026Q01200394-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q01200394-I1Open ↗
08/13/2026Q01200394-S1Open ↗
08/13/2026Q00755958-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026Q01200394-I1Open ↗
09/01/2026Q00755958-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q01200394-S1Open ↗
08/13/2026Q00755958-I1Open ↗
08/13/2026Q01200394-I1Open ↗