← Back
One story - permanent living quarter
67-11 147 STREET
QUEENS · BIN 4142110
💬 Discuss this project
1945Year Built
1.5Stories
A2Building Class
R4AZoning
1,299 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story - permanent living quarter · Owner of record: TI FURTHER LLC · 4,000 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction16p · 1 filing · 20 docs
Floor 2Under Construction17p · 1 filing · 20 docs
Floor 1Under Construction17p · 1 filing · 20 docs
CellarUnder Construction16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TI FURTHER LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2018$1.1M—Private party → TI FURTHER LLC$868/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC508/03/2026
JIAN ENGINEERING PLLC209/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WING JAY CONSTRUCTION INCGeneral Contractor508/10/2026
DYNAMIC PLBG & SPRKLR CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397508/03/2026
Building Lifecycle
All (69)Filed (7)Permit Issued (6)Violation (2)Objection (24)Special Inspection (30)
08/10/2026
Permit issued — Construction Fence
Q01251877-I1-FN
08/03/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 3-STORY BUILDING WITH CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
Q01203139-P3
04/22/2026
Violation issued (ECB, open)
Construction
01/12/2026
Permit issued — Foundation
Q01203139-S4-FO
12/08/2025
Objection resolved — Addressed
11/25/2025
Objection resolved — Addressed
11/25/2025
Objection resolved — Addressed
10/22/2025
Permit issued — Mechanical Systems
Q01203139-I1-GC-CX
10/22/2025
Permit issued — Plumbing
Q01203139-S2-PL
10/22/2025
Permit issued — Structural
Q01203139-S3-ST
10/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 3-STORY BUILDING WITH CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
Q01203139-S2
10/21/2025
Special inspection requirement — Permanent certificate
JIAN DENG
10/21/2025
Special inspection requirement — Interior lighting power
JIAN DENG
10/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
10/21/2025
Special inspection requirement — Ventilation and air distribution system
JIAN DENG
10/21/2025
Special inspection requirement — Fenestration areas
JIAN DENG
10/21/2025
Special inspection requirement — Fenestration air leakage
JIAN DENG
10/21/2025
Special inspection requirement — Metering
JIAN DENG
10/21/2025
Special inspection requirement — Electric vehicle service equipment requirements
JIAN DENG
10/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
10/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
10/21/2025
Special inspection requirement — Mechanical Systems
JIAN DENG
10/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
10/21/2025
Special inspection requirement — Final
JIAN DENG
10/21/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
10/21/2025
Special inspection requirement — Air barrier — testing
JIAN DENG
10/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
10/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
10/21/2025
Special inspection requirement — Insulation placement and R values
JIAN DENG
10/21/2025
Special inspection requirement — Maintenance information
JIAN DENG
10/21/2025
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
10/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
10/08/2025
Objection raised — Structural
10/08/2025
Objection raised — Structural
10/08/2025
Objection raised — Structural
09/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 3-STORY BUILDING WITH CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
Q01203139-S3
09/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 3-STORY BUILDING WITH CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
Q01203139-S4
09/16/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
JIAN DENG
09/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
09/16/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JIAN DENG
09/16/2025
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
09/16/2025
Special inspection requirement — Subgrade Inspections
JIAN DENG
09/15/2025
Special inspection requirement — Footing and Foundation
JIAN DENG
09/15/2025
Special inspection requirement — Final
JIAN DENG
09/15/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
08/14/2025
Violation issued (ECB, closed)
Construction
08/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
THE DRAWINGS HEREIN ARE RELATED TO A NEW 3-STORY BUILDING WITH CELLAR. THE MAIN LATERAL SYSTEM OF THE BUILDING IS COMPOSED OF INTERMEDIATE REINFORCED MASONRY SHEAR WALLS.
Q01203139-P1
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2025
Permit issued — Construction Fence
Q01251877-I1-FN
07/07/2025
Filed — Alteration
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01251877-I1
07/01/2025
Objection raised — Admin
07/01/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
06/11/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
04/28/2025
Objection resolved — Addressed
04/28/2025
Objection resolved — Addressed
04/28/2025
Objection resolved — Addressed
04/28/2025
Objection resolved — Addressed
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedWING JAY CONSTRUCTION INC08/10/2026
DOB NOWFoundationPermit IssuedWING JAY CONSTRUCTION INC01/12/2026
DOB NOWMechanical SystemsPermit IssuedWING JAY CONSTRUCTION INC10/22/2025
DOB NOWPlumbingPermit IssuedCITYWIDE PLBG HTG & SPKLS10/22/2025
DOB NOWStructuralPermit IssuedWING JAY CONSTRUCTION INC10/22/2025
DOB NOWConstruction FencePermit IssuedWING JAY CONSTRUCTION INC07/22/2025
1 project · most recent 11/05/2025
General Wiring
FiledStatusContractorScope
11/05/2025Permit IssuedALL AROUND ELECTRIC CORP.General Wiring
1 project · most recent 08/03/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
08/03/2026Permit IssuedWING JAY CONSTRUCTION INCSteel, Concrete, Masonry, Wood
1 project · most recent 07/07/2025
Fence
FiledStatusContractorScope
07/07/2025Permit IssuedWING JAY CONSTRUCTION INCFence
1 project · most recent 08/03/2026
Earthwork
FiledStatusContractorScope
08/03/2026Permit IssuedWING JAY CONSTRUCTION INCEarthwork
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
10/21/2025Permanent certificateJIAN DENGenergy_progress
10/21/2025Interior lighting powerJIAN DENGenergy_progress
10/21/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
10/21/2025Ventilation and air distribution systemJIAN DENGenergy_progress
10/21/2025Fenestration areasJIAN DENGenergy_progress
10/21/2025Fenestration air leakageJIAN DENGenergy_progress
10/21/2025MeteringJIAN DENGenergy_progress
10/21/2025Electric vehicle service equipment requirementsJIAN DENGenergy_progress
10/21/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
10/21/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
10/21/2025Mechanical SystemsJIAN DENGspecial
10/21/2025Fire-Resistance Rated ConstructionJIAN DENGprogress
10/21/2025FinalJIAN DENGprogress
10/21/2025Energy Code Compliance InspectionsJIAN DENGprogress
10/21/2025Air barrier — testing JIAN DENGenergy_progress
10/21/2025Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
10/21/2025HVAC-R and service water heating system controlsJIAN DENGenergy_progress
10/21/2025Insulation placement and R valuesJIAN DENGenergy_progress
10/21/2025Maintenance informationJIAN DENGenergy_progress
10/21/2025Air barrier - visual inspectionJIAN DENGenergy_progress
10/21/2025HVAC-R and service water heating equipmentJIAN DENGenergy_progress
09/16/2025Subsurface Conditions – Fill Placement & In-Place DensityJIAN DENGspecial
09/16/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
09/16/2025Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
09/16/2025Concrete - Cast-In-PlaceJIAN DENGspecial
Latest 25 of 56.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/19/2026Q01251877-I1Request digital key ↗
08/18/2026Q01203139-I1Request digital key ↗
08/18/2026Q01203139-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/03/2025440824128Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026Q01203139-P3Open ↗
08/13/2026Q01203139-P1Open ↗
08/13/2026Q01203139-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/18/2026Q01203139-P3Open ↗
08/13/2026Q01203139-P1Open ↗
08/13/2026Q01203139-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01203139-P1Open ↗
08/13/2026Q01203139-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/18/2026Q01203139-P3Open ↗
08/13/2026Q01203139-S2Open ↗
08/13/2026Q01203139-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01203139-S4Open ↗
08/27/2026Q01203139-I1Open ↗
08/27/2026Q01203139-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026Q01203139-S4Open ↗
09/02/2026Q01203139-S4Open ↗
08/27/2026Q01203139-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/03/2025440824128Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/03/2025440824128Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/18/2026Q01203139-P3Open ↗
08/13/2026Q01203139-P1Open ↗
08/13/2026Q01203139-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/03/2025440824128Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/18/2026Q01203139-P3Open ↗
08/13/2026Q01203139-S2Open ↗
08/13/2026Q01203139-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q01203139-S4Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01203139-S4Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
10/03/2025440824128Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/03/2025440824128Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/18/2026Q01203139-P3Open ↗
08/13/2026Q01203139-P1Open ↗
08/13/2026Q01203139-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/18/2026Q01203139-P3Open ↗
08/13/2026Q01203139-P1Open ↗
08/13/2026Q01203139-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026Q01203139-P3Open ↗
08/13/2026Q01203139-I1Open ↗
08/13/2026Q01203139-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/03/2025440824128Open ↗