← Back
Two stories - detached, small or mid-size
67-11 179 STREET
QUEENS · Fresh Meadows-Utopia · BIN 4153081
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
3,262 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 9,450 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/06/2023$2.0M—Private party → Private party$612/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS407/27/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J. CALIENDO R.A., P.C.303/21/2026
GERALD J CALIENDO R A P C303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SB RENOVATION & MODELINGGeneral Contractor204/09/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519307/27/2026
Building Lifecycle
All (44)Filed (4)Permit Issued (3)Signed Off (2)Violation (1)Inspection (4)Special Inspection (30)
07/27/2026
Filed — Alteration
HEREWITH FILING ALTERATION SUBSEQUENT WITH JOB #Q01190809-I1 FOR PLUMBING WORK IN CELLAR, FIRST FLOOR, 2ND FLOOR AND ATTIC AS PER PLANS FILED.
Q01190809-P1
07/27/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
07/27/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Younes Abouyaala
07/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
07/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/27/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
07/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/24/2026
Signed off — Alteration
HEREWITH FILING ALTERATION SUBSEQUENT WITH JOB #Q01190809-I1 FOR PLUMBING WORK IN CELLAR, FIRST FLOOR, 2ND FLOOR AND ATTIC AS PER PLANS FILED.
Q01190809-I1
04/24/2026
Signed off — Alteration
HEREWITH FILING ALTERATION SUBSEQUENT WITH JOB #Q01190809-I1 FOR PLUMBING WORK IN CELLAR, FIRST FLOOR, 2ND FLOOR AND ATTIC AS PER PLANS FILED.
Q01190809-S1
03/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/04/2025
Permit issued — Plumbing
Q01190809-S3-PL
06/09/2025
Violation issued (ECB, closed)
Construction
05/11/2025
Filed — Alteration
HEREWITH FILING ALTERATION SUBSEQUENT WITH JOB #Q01190809-I1 FOR PLUMBING WORK IN CELLAR, FIRST FLOOR, 2ND FLOOR AND ATTIC AS PER PLANS FILED.
Q01190809-S3
05/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/09/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
05/09/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Younes Abouyaala
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/09/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
05/09/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
05/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/01/2025
Permit issued — Structural
Q01190809-I1-GC-CX
05/01/2025
Permit issued — Construction Fence
Q01190809-S1-FN
03/25/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
03/09/2025
Filed — Alteration
HEREWITH FILING ALTERATION SUBSEQUENT WITH JOB #Q01190809-I1 FOR PLUMBING WORK IN CELLAR, FIRST FLOOR, 2ND FLOOR AND ATTIC AS PER PLANS FILED.
Q01190809-I1
03/09/2025
Filed — Alteration
HEREWITH FILING ALTERATION SUBSEQUENT WITH JOB #Q01190809-I1 FOR PLUMBING WORK IN CELLAR, FIRST FLOOR, 2ND FLOOR AND ATTIC AS PER PLANS FILED.
Q01190809-S1
03/06/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
03/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
03/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
03/06/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
03/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/06/2025
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
03/06/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/06/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
03/06/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
03/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
03/06/2025
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP08/04/2025
DOB NOWStructuralSigned-offSB RENOVATION & MODELING05/01/2025
DOB NOWConstruction FenceSigned-offSB RENOVATION & MODELING05/01/2025
BISPLISSUEDBEDROCK PLBG. & HTG., INC09/16/2002
BIS—ISSUEDBRITE-N-UP INC08/26/2002
1 project · most recent 07/27/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/27/2026Permit IssuedFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
1 project · most recent 07/24/2026
General Wiring
FiledStatusContractorScope
07/24/2026CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
07/27/2026Maintenance informationYounes Abouyaalaenergy_progress
07/27/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
07/27/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesYounes Abouyaalaspecial
07/27/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
07/27/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
07/27/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/27/2026Permanent certificateYounes Abouyaalaenergy_progress
07/27/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/09/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/09/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/09/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
05/09/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesYounes Abouyaalaspecial
05/09/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/09/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
05/09/2025Maintenance informationYounes Abouyaalaenergy_progress
05/09/2025Permanent certificateYounes Abouyaalaenergy_progress
05/09/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/25/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
03/06/2025Maintenance informationYounes Abouyaalaenergy_progress
03/06/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
03/06/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
03/06/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
03/06/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/06/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
Latest 25 of 43.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026Q01190809-S1Request digital key ↗
08/20/2026Q01190809-I1Request digital key ↗
08/20/2026Q01190809-S3Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01190809-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01190809-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026Q01190809-S3Open ↗
09/01/2026Q01190809-S3Open ↗
08/26/2026Q01190809-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q01190809-S3Open ↗
08/26/2026Q01190809-I1Open ↗
08/26/2026Q01190809-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026Q01190809-S1Open ↗
08/20/2026Q01190809-I1Open ↗
08/20/2026Q01190809-S3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01190809-S3Open ↗
08/20/2026Q01190809-I1Open ↗
08/20/2026Q01190809-P1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01190809-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01190809-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram1
08/13/2026Q01190809-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01190809-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01190809-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01190809-I1Open ↗