← Back
Primarily 2 family with 1 store or office
67-17 MYRTLE AVENUE
QUEENS · BIN 4089428
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
R5DZoning
3,021 sfGross Floor Area
3Units
12 Open Violations ▸
Primarily 2 family with 1 store or office · Owner of record: SENECA AVE. REALTY HOLDING LLC · 1,853 sf lot · 1.63 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 31 filing · 14 docs
Floor 21 filing · 14 docs
Floor 1
Cellar1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SENECA AVE REALTY HOLDING707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/24/2018$1.3M—— → —$439/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAHMAL SABAHA PE CONSULTING ENGR212/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS DRAFTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PETER MICELI PLUMBINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519212/28/2021
Building Lifecycle
All (39)Filed (2)Permit Issued (1)Violation (16)Inspection (7)Special Inspection (13)
11/29/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2023
Violation issued (ECB, closed)
Unknown
06/14/2023
Violation issued (ECB, closed)
Construction
06/14/2023
Violation issued (ECB, closed)
Unknown
06/08/2023
Violation issued (HPD, open)
B
06/08/2023
Violation issued (HPD, open)
B
06/08/2023
Violation issued (HPD, open)
B
06/08/2023
Violation issued (HPD, open)
A
06/08/2023
Violation issued (HPD, open)
A
06/08/2023
Violation issued (HPD, open)
B
06/08/2023
Violation issued (HPD, open)
B
06/08/2023
Violation issued (HPD, open)
C
06/08/2023
Violation issued (HPD, open)
A
06/08/2023
Violation issued (HPD, open)
B
06/08/2023
Violation issued (HPD, open)
B
06/08/2023
Violation issued (HPD, open)
B
02/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/06/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/06/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/02/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/29/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2022
Permit issued — Plumbing
Q00645555-S1-PL
12/28/2021
Filed — Alteration
Remove ex. defective boiler, components, piping and meter bars @ cel. Pr. 3 new gas boilers, 3 gas HWH, new meters bars, and gas piping. New gas piping to ex. GR on 2nd & 3rd flr.
Q00645555-S1
12/20/2021
Filed — Alteration
Remove ex. defective boiler, components, piping and meter bars @ cel. Pr. 3 new gas boilers, 3 gas HWH, new meters bars, and gas piping. New gas piping to ex. GR on 2nd & 3rd flr.
Q00645555-I1
12/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
12/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
12/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
12/20/2021
Special inspection requirement — Permanent certificate
Younes Abouyaala
12/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
12/20/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
12/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/20/2021
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
12/20/2021
Special inspection requirement — Maintenance information
Younes Abouyaala
12/20/2021
Special inspection requirement — Permanent certificate
Younes Abouyaala
12/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
12/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPETER MICELI PLUMBING01/24/2022
BIS—ISSUEDAL PROS CONSTRUCTION05/19/2003
BISEQISSUEDN/A12/16/1992
2 projects · most recent 10/24/2023
General Wiring
FiledStatusContractorScope
10/24/2023Permit IssuedAMERICAN POWER ELECT CONSGeneral Wiring
07/07/2023CancelledR.A. PHILLIPS ELEC'L CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2023Fail-Final CND-Occupancy InspectionFailView ↗
12/06/2022Pass-Final CND-Occupancy InspectionPassView ↗
12/02/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/29/2022Fail-Final CND-Occupancy InspectionFailView ↗
11/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
12/20/2021HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
12/20/2021HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
12/20/2021HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
12/20/2021Permanent certificateYounes Abouyaalaenergy_progress
12/20/2021HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
12/20/2021Maintenance informationYounes Abouyaalaenergy_progress
12/20/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/20/2021Energy Code Compliance InspectionsYounes Abouyaalaprogress
12/20/2021HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
12/20/2021Maintenance informationYounes Abouyaalaenergy_progress
12/20/2021Permanent certificateYounes Abouyaalaenergy_progress
12/20/2021HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
12/16/2021Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00645555-S1Request digital key ↗
08/26/2026Q00645555-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026Q00645555-S1Open ↗
08/22/2026Q00645555-S1Open ↗
08/22/2026Q00645555-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026Q00645555-S1Open ↗
08/26/2026Q00645555-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q00645555-S1Open ↗
08/26/2026Q00645555-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026Q00645555-I1Open ↗
08/26/2026Q00645555-S1Open ↗