← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Pomonok (NYCHA)
67-39 KISSENA BOULEVARD · BIN 4455434
💬 Discuss this project
1952Year Built
7Stories
D1Building Class
R6Zoning
1,389,532 sfGross Floor Area
1,379Units
LL97 Covered31 Active Violations 29 unresolved · 2 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC Housing Authority · 1,374,000 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
StructuralElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNYC Housing Authority4p · 1 filing · 6 docs
CellarHot water heater replacement1 filing · 3 docs
Sub-BasementNYC Housing Authority1p · 1 filing · 6 docs
Site & exteriorNYC Housing Authority1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven Winter Associates109/28/2026
A Saxon Design Group110/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Eia ElectricElectrical103/22/2026
Olympic Electric WiringElectrical103/21/2026
Gotham CommunicationsGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
R Marsac Consulting329110/19/2023
Building Lifecycle
All (39)Filed (3)Permit Issued (2)Signed Off (1)Facade (FISP) (10)Violation (9)Objection (4)Special Inspection (10)
09/28/2026
Filed — Alteration
FILING HERWITH FOR THE REMOVAL AND INSTALLATION OF HOT WATER HEATERS, INCLUSIVE BUT NOT LIMITED TO REPLACING STORAGE TANKS, VALVES, INSTRUMENTATION, CONTROLS, RECIRCULATION PUMPS, ETC. NO CHANGE IN USE IN EGRESS, OCCUPANCY OR USE UNDER THIS APPLICATION.
Q01464310-I1
09/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/23/2026
Special inspection requirement — Energy Code Compliance Inspections
09/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/23/2026
Special inspection requirement — Maintenance information
09/23/2026
Special inspection requirement — Permanent certificate
09/23/2026
Special inspection requirement — Metering
09/23/2026
Special inspection requirement — Electrical motors and elevators
06/11/2024
Signed off — Alteration
Dish:Install 3 new telecom antenna sectors(1 antenna&3 RRH unit/sector),1 GPS,3 kickbacks&1 equipment cabinet on new platform on roof.Installation conduits&service room connections as plans.All work in compliance w/ 5/98.No change in use,egress&occupancy
Q00944463-I1
05/10/2024
Permit issued — Suspended Scaffold
Q01037954-I1-SC
04/24/2024
Filed — Alteration
Q01037954-I1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/05/2023
Permit issued — Antenna
Q00944463-I1-AN
11/22/2023
Objection resolved — Addressed
11/06/2023
Objection resolved — Addressed
10/31/2023
Objection raised — Admin
10/31/2023
Objection raised — Scope
10/19/2023
Filed — Alteration
Dish:Install 3 new telecom antenna sectors(1 antenna&3 RRH unit/sector),1 GPS,3 kickbacks&1 equipment cabinet on new platform on roof.Installation conduits&service room connections as plans.All work in compliance w/ 5/98.No change in use,egress&occupancy
Q00944463-I1
11/16/2017
Cycle 8 facade report submitted
11/02/2017
Cycle 8 facade inspection completed
10/28/2017
Cycle 8 facade report signed — SAFE
01/10/2017
Violation issued (ECB, closed)
Elevators
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/2016
Cycle 7 facade report submitted
12/31/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/2013
Cycle 7 facade report submitted
06/24/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/12/2013
Cycle 7 facade report signed — UNSAFE
06/10/2013
Cycle 7 facade inspection completed
04/10/2008
Cycle 6 facade report submitted
04/02/2008
Cycle 6 facade report signed — SWARMP
02/06/2008
Cycle 6 facade inspection completed
11/30/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedPPM Telecom05/10/2024
DOB NOWAntennaSigned-offGotham Communications12/05/2023
BISOTISSUEDAps Contracting07/13/2016
BISEQISSUEDAps Contracting03/15/2016
BISEQISSUEDAps Contracting03/09/2016
BISEQISSUEDAps Contracting10/19/2015
BISOTISSUEDAps Contracting07/02/2015
BISOTISSUEDAps Contracting05/14/2015
BISEQISSUEDAps Contracting03/19/2015
BISEQISSUEDAps Contracting03/19/2015
BISPLISSUEDDanco03/26/2014
BISOTISSUEDV.c.vitanza Sons04/14/1999
BISPLISSUEDV. C. Vitanza Sons04/14/1999
BISOTISSUEDV.c.vitanza Sons02/11/1998
BISPLISSUEDV. C. Vitanza Sons02/11/1998
BISPLISSUEDV. C. Vitanza Sons02/15/1990
1 project · most recent 09/28/2026
Water/Sanitary
FiledStatusContractorScope
09/28/2026——Water/Sanitary
5 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedAccord Power Electric2 meters, 1 new_meters
01/24/2024Permit IssuedJ.A. Lee Electric Services60 meters, 1 new_meters
12/23/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
12/23/2020Permit IssuedN.Y.C. Housing AuthorityGeneral Wiring
03/12/2019Permit IssuedEia ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/23/2026Fire-Resistant Penetrations and Joints—special
09/23/2026Tenant Protection Plan Compliance—special
09/23/2026Energy Code Compliance Inspections—progress
09/23/2026HVAC-R and service water heating system controls—energy_progress
09/23/2026HVAC-R and service water piping design and insulation—energy_progress
09/23/2026HVAC-R and service water heating equipment—energy_progress
09/23/2026Maintenance information—energy_progress
09/23/2026Permanent certificate—energy_progress
09/23/2026Metering—energy_progress
09/23/2026Electrical motors and elevators—energy_progress
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
10/04/2026Q01464310-I1Request digital key ↗
08/24/2026Q00944463-I1Request digital key ↗
08/22/2026Q01037954-I1Request digital key ↗
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION9
07/18/2016420966093Open ↗
04/04/2016440198215Open ↗
03/28/2016440198206Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
10/17/2015440257133Open ↗
03/18/2015440198215Open ↗
03/17/2015440198206Open ↗
Showing 3 of 5 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
05/30/2015420966093Open ↗
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
12/13/2016420966093Open ↗
12/13/2016420966093Open ↗
12/13/2016420966093Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/17/2015440257133Open ↗
03/18/2015440198215Open ↗
03/17/2015440198206Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/17/2015440257133Open ↗
03/18/2015440198215Open ↗
03/17/2015440198206Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/17/2015440257133Open ↗
03/18/2015440198215Open ↗
03/17/2015440198206Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
10/04/2026Q01464310-I1Open ↗
08/13/2026Q00944463-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/23/2014420966093Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
03/25/2014440134640Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/13/2016420966093Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/25/2014440134640Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00944463-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/09/2016420966093Open ↗
10/02/2014420966093Open ↗
04/23/2014420966093Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/17/2015440198206Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/02/2014420966093Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/09/2016420966093Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/17/2015440257133Open ↗
03/18/2015440198215Open ↗
03/17/2015440198206Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/13/2016420966093Open ↗
11/23/2016440257133Open ↗
11/18/2016440198215Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
10/04/2026Q01464310-I1Open ↗
08/13/2026Q00944463-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/23/2014420966093Open ↗
▸BISSHED LETTER1
03/28/2016440198206Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026Q00944463-I1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026Q00944463-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/13/2016420966093Open ↗
08/25/2014440134640Open ↗
04/23/2014420966093Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET4
10/17/2015440257133Open ↗
03/18/2015440198215Open ↗
03/17/2015440198206Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
04/23/2014420966093Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026Q01037954-I1Open ↗