Roof94p · 1 filing · 2 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 94 drawing sheets
Bulkhead14p · 1 filing · 2 docs
ArchitectureMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 14 drawing sheets
Penthouse3p · 1 filing · 2 docs
Fire ProtectionPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Floor 811p · 1 filing · 2 docs
Fire Protection
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 80
Floor 79
Floor 78
Floor 77
Floor 76
Floor 75
Floor 74
Floor 73
Floor 72
Floor 71
Floor 70
Floor 69
Floor 681p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 671p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 661p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 651p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 641p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 631p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 621p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 611p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 601p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 591p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 581p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 571p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 561p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 551p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 541p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 531p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 521p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 511p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 501p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 491p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 483p · 1 filing · 2 docs
Fire ProtectionPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Floor 471p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 461p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 451p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 441p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 431p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 421p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 411p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 401p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 393p · 1 filing · 2 docs
DMPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Floor 381p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 373p · 1 filing · 2 docs
MechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Floor 364p · 1 filing · 2 docs
MechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 351p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 341p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 331p · 1 filing · 2 docs
Plumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 1 drawing sheet
Floor 322p · 1 filing · 2 docs
MechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 2 drawing sheets
Floor 312p · 1 filing · 2 docs
MechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 2 drawing sheets
Floor 302p · 1 filing · 2 docs
MechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 2 drawing sheets
Floor 293p · 1 filing · 2 docs
Fire ProtectionMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Floor 283p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Floor 273p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Floor 264p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 254p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 244p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 235p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 5 drawing sheets
Floor 223p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 3 drawing sheets
Floor 214p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 204p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 195p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 5 drawing sheets
Floor 186p · 1 filing · 2 docs
ArchitectureGeneralMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 6 drawing sheets
Floor 175p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 5 drawing sheets
Floor 164p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 155p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 5 drawing sheets
Floor 144p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 134p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 126p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 6 drawing sheets
Floor 114p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 105p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 5 drawing sheets
Floor 94p · 1 filing · 2 docs
ArchitectureMechanicalPlumbing
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 4 drawing sheets
Floor 813p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 13 drawing sheets
Floor 714p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 14 drawing sheets
Floor 618p · 1 filing · 2 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 18 drawing sheets
Floor 521p · 1 filing · 2 docs
ArchitectureDMElectricalFire ProtectionLandscapeMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 21 drawing sheets
Floor 420p · 1 filing · 2 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 20 drawing sheets
Floor 337p · 1 filing · 2 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 37 drawing sheets
Floor 261p · 1 filing · 2 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 61 drawing sheets
Floor 161p · 1 filing · 2 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 61 drawing sheets
Mezzanine12p · 1 filing · 2 docs
ArchitecturePlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 12 drawing sheets
Cellar115p · 1 filing · 2 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 115 drawing sheets
Sub-Cellar5p · 1 filing · 2 docs
ArchitectureFire ProtectionGeneralPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 5 drawing sheets
Basement25p · 1 filing · 2 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS FOR REMEDIAL REPAIRS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE NYC 2014 BUILDING CODE.
On file for this project
2 documents · 25 drawing sheets