1915Year Built
4Stories
C6Building Class
R8BZoning
3,780 sfGross Floor Area
5Units
Rent Stabilized8 Open Violations ▸
Walk-up cooperative · Owner of record: 67 E. 80TH STREET HOUSING CORP. · 1,601 sf lot · 2.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Roof1p · 1 filing · 4 docs
Floor 41 filing · 4 docs
Floor 31 filing · 4 docs
Floor 21 filing · 4 docs
Floor 16p · 3 filings · 10 docs
Site & exterior5p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES1707/08/2026
67 EAST 80TH STREET HOUSING707/08/2026
SHALBRO CONSTRUCTION GROUP307/08/2026
67 E. 80TH STREET HOUSING CORP.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJE PROFESSIONAL SERVICES409/20/2024
ARQUITECTURA VARELA110/16/2023
ENTHINK ENGINEERS LLC102/21/2022
NAVI STRUCTURAL ENGINEERING, PLLC110/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor607/08/2026
AP-TECH CONTRACTING CORPGeneral Contractor307/08/2026
JEROME KRITZElectrical203/21/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
SHALBRO CONSTRUCTION GROUPGeneral Contractor107/08/2026
Building Lifecycle
All (34)Filed (7)Permit Issued (6)Signed Off (4)Violation (16)Special Inspection (1)
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
05/09/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01109431-I1
05/09/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01109426-I1
04/28/2025
Signed off — Alteration
Remove existing finish coat consisting of Stucco and Bituminous wall coating, repoint joints, replace damaged bricks, Apply new waterproofing coat of SIKA or similar product.
M00589001-I1
11/14/2024
Permit issued — General Construction
M00589001-I1-GC
09/20/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01109431-P1
09/20/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01109426-P1
09/13/2024
Permit issued — Sidewalk Shed
M01109426-I1-SH
09/11/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01109431-I1
09/11/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01109426-I1
09/11/2024
Permit issued — Supported Scaffold
M01109431-I1-SF
04/05/2024
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00948855-I1
04/01/2024
Violation issued (HPD, open)
A
11/15/2023
Violation issued (HPD, closed)
I
10/17/2023
Permit issued — Supported Scaffold
M00948855-I1-SF
10/16/2023
Filed — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00948855-I1
03/15/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, closed)
I
02/22/2022
Permit issued — Sidewalk Shed
M00680382-I1-SH
02/21/2022
Filed — Alteration
M00680382-I1
02/15/2022
Violation issued (HPD, open)
A
11/23/2021
Permit issued — General Construction
M00589001-I1-GC
10/09/2021
Filed — Alteration
Remove existing finish coat consisting of Stucco and Bituminous wall coating, repoint joints, replace damaged bricks, Apply new waterproofing coat of SIKA or similar product.
M00589001-I1
09/05/2021
Special inspection requirement — Final
Humayun Ahmed
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, open)
A
10/25/2019
Violation issued (HPD, closed)
I
11/06/2017
Violation issued (HPD, closed)
I
10/25/2016
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
09/10/1999
Violation issued (HPD, open)
B
01/20/1982
Violation issued (HPD, closed)
A
11/21/1974
Violation issued (HPD, open)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAP-TECH CONTRACTING CORP11/14/2024
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC09/13/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC09/11/2024
DOB NOWSupported ScaffoldSigned-offSHALBRO CONSTRUCTION GROU10/17/2023
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC02/22/2022
DOB NOWGeneral ConstructionSigned-offAP-TECH CONTRACTING CORP11/23/2021
BISOTISSUEDAP-TECH CONTRACTING CORP07/25/2013
BISPLISSUEDFORTE EXPRESS P & H INC01/29/1998
BISEQISSUEDCOLGATE SCAFFOLDING08/10/1995
1 project · most recent 02/24/2022
FiledStatusContractorScope
02/24/2022CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/05/2021FinalHumayun Ahmedprogress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026M00589001-I1Request digital key ↗
09/02/2026M00680382-I1Request digital key ↗
08/29/2026M00948855-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
08/06/2013121637924Open ↗
08/06/2013121637924Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/20/2013121637924Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026M00589001-I1Open ↗
09/02/2026M00680382-I1Open ↗
08/26/2026M01109426-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/27/2016121637924Open ↗
06/20/2013121637924Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026M00589001-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/20/2013121637924Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/03/2026M00589001-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/27/2016121637924Open ↗
06/20/2013121637924Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/27/2016121637924Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/27/2016121637924Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/20/2013121637924Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/27/2016121637924Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
07/27/2016121637924Open ↗
06/20/2013121637924Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
08/06/2013121637924Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
06/20/2013121637924Open ↗
▸BISADDITIONAL INFORMATION1
10/25/2013121637924Open ↗