← Back
Office with commercial, 1-6 stories
67 GANSEVOORT STREET
MANHATTAN · BIN 1012197
💬 Discuss this project
1887Year Built
3Stories
O5Building Class
M1-5Zoning
5,317 sfGross Floor Area
2Units
1 Open Violation ▸
Office with commercial, 1-6 stories · Owner of record: NUEVA MAISON LLC · 2,000 sf lot · 2.66 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 7 docs
Floor 33p · 2 filings · 13 docs
Floor 24p · 3 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar3p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KREWE2707/08/2026
NUEVA MAISON LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2021$14.8M—FAIRFAX & SAMMONS PROPERTIES LLC → NUEVA MAISON LLC$2,776/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RUSSELL GOSS ARCHITECT, PC106/23/2026
VINCENT J. LIOTTA P.E.810/11/2024
JJ ARCHITECTS, PLLC509/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIP CC2603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I-RESOLVE CONSTRUCTION GRGeneral Contractor707/08/2026
DORMASA CONSTRUCTION INCGeneral Contractor507/08/2026
ASE HVAC INCGeneral Contractor407/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
CHARLES, ANDELLElectrical103/21/2026
R.J.C. MECHANICAL CORPPlumbing107/08/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
DOROWSKY, HARRYElectrical103/21/2026
INNOVATION PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.19741210/11/2024
FORUM ENGINEERING, P. C.907209/28/2023
Building Lifecycle
All (138)Filed (14)Permit Issued (13)Signed Off (9)Violation (17)Inspection (15)Objection (52)Special Inspection (18)
06/23/2026
Filed — Alteration
Installation of mural on the side of the building.
M01388250-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2025
Signed off — Alteration
MODIFY EXISTING PLUMBING WATER/SANITARY FIXTURES AT 2ND FL TO ADDRESS ECB VIOLATION 39074282M AND AEU 063023AEUHAZ100029. FILED IN CONJUNCTION WITH M00828001(GC), M00826900(PL), M00850490(BE), M00850492(MS), NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01106936-I1
04/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2025
Signed off — Alteration
G.C. FOR MINOR MODIFICATION TO EXISTING NON-LOAD BEARING PARTITIONS AS PER PLAN IN CONJUNCTION WITH M00826900 (PL), M00850490 (BE), M00850492 (MS). NO CHANGE TO USE EGRESS OR OCCUPANCY. ECB VIOL: # 39074282M & # 39074255R ADRESSED UNDER (PL) M00826900.
M00828001-I1
03/24/2025
Signed off — Alteration
GENERAL CONSTRUCTION, ERECT INTERIOR NON-LOAD BEARING PARTITIONS WITH FINISHES AS PER PLAN. THERE IS NO CHANGE TO USE, EGRESS, OR OCCUPANCY PROPOSED.
M00686058-I1
02/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/29/2025
Permit issued — Plumbing
M01106936-I1-PL
12/06/2024
Permit issued — General Construction
M00828001-I1-GC
10/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Liotta
10/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
Vincent Liotta
10/25/2024
Special inspection requirement — Final
jessica nahon
10/21/2024
Objection resolved — Addressed
10/18/2024
Objection resolved — Addressed
10/11/2024
Filed — Alteration
MODIFY EXISTING PLUMBING WATER/SANITARY FIXTURES AT 2ND FL TO ADDRESS ECB VIOLATION 39074282M AND AEU 063023AEUHAZ100029. FILED IN CONJUNCTION WITH M00828001(GC), M00826900(PL), M00850490(BE), M00850492(MS), NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01106936-I1
10/04/2024
Signed off — Alteration
INSTALL TANKLESS GAS-FIRED COMBI-HEATING CATEGORY IV BOILER. COMBUSTION AIR INTAKE / DISCHARGE TERMINATED ON THE HIGH ROOF.. FILED IN CONJUNCTION WITH M00850492 (MS VENTS), M00826900 (PL), M00828001 (GC). NO CHANGE TO USE, EGRESS, OCCUPANCY
M00850490-I1
10/01/2024
Objection raised — Scope
10/01/2024
Objection raised — Other
09/25/2024
Filed — Alteration
G.C. FOR MINOR MODIFICATION TO EXISTING NON-LOAD BEARING PARTITIONS AS PER PLAN IN CONJUNCTION WITH M00826900 (PL), M00850490 (BE), M00850492 (MS). NO CHANGE TO USE EGRESS OR OCCUPANCY. ECB VIOL: # 39074282M & # 39074255R ADRESSED UNDER (PL) M00826900.
M00828001-P1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/12/2024
Special inspection requirement — Final
jessica nahon
09/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vincent Liotta
09/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/11/2024
Signed off — Alteration
M00850492-I1
09/11/2024
Permit issued — General Construction
M00828001-I1-GC
09/03/2024
Permit issued — Mechanical Systems
M00850492-I1-MS
08/30/2024
Signed off — Alteration
MODIFY AND REMOVE EXISTING HVAC EQUIPMENT AND DUCT SYSTEMS, INSTALL NEW HVAC WITH ASSOCIATED DUCT, EXHAUST FANS AND FLUE FOR GAS FIRE PLACE AT THE CELLAR, 1ST FLOOR AND SET BACK ROOF OSP AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED.
M00789032-I1
08/30/2024
Signed off — Alteration
MODIFY EXISTING PLUMBING WATER/SANI/GAS FIXTURES ADD GAS PIPING FROM CEL TO 3RD FL TO ADDRESS ECB VIOLATIONS 39074255R; 39074282M. FILED IN CONJUNCTION WITH M00828001(GC), M00850490(BE), M00850492(MS), NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00826900-I1
05/29/2024
Signed off — Alteration
MODIFICATION OF EXISTING PLUMBING WORK AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLAN. ALL ASSOCIATED WORK M00789032 (MS) AND M00686058 (GC) FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED.
M00789044-I1
04/04/2024
Permit issued — General Construction
M00828001-I1-GC
11/17/2023
Permit issued — Plumbing
M00789044-I1-PL
10/02/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/28/2023
Filed — Alteration
MODIFICATION OF EXISTING PLUMBING WORK AND INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLAN. ALL ASSOCIATED WORK M00789032 (MS) AND M00686058 (GC) FILED SEPARATELY. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED.
M00789044-P1
09/28/2023
Filed — Alteration
MODIFY EXISTING PLUMBING WATER/SANI/GAS FIXTURES ADD GAS PIPING FROM CEL TO 3RD FL TO ADDRESS ECB VIOLATIONS 39074255R; 39074282M. FILED IN CONJUNCTION WITH M00828001(GC), M00850490(BE), M00850492(MS), NO CHANGE TO USE, EGRESS OR OCCUPANCY
M00826900-P1
09/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/07/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/06/2023
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/15/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/07/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/21/2023
Permit issued — Boiler Equipment
M00850490-I1-BE
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2023
Permit issued — Plumbing
M00826900-I1-PL
05/25/2023
Filed — Alteration
M00850492-I1
05/23/2023
Permit issued — General Construction
M00828001-I1-GC
05/23/2023
Objection raised — Scope
05/23/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Scope
05/23/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Fire_Protection
05/23/2023
Objection resolved — Addressed
05/23/2023
Objection raised — Scope
05/23/2023
Objection resolved — Addressed
05/22/2023
Filed — Alteration
INSTALL TANKLESS GAS-FIRED COMBI-HEATING CATEGORY IV BOILER. COMBUSTION AIR INTAKE / DISCHARGE TERMINATED ON THE HIGH ROOF.. FILED IN CONJUNCTION WITH M00850492 (MS VENTS), M00826900 (PL), M00828001 (GC). NO CHANGE TO USE, EGRESS, OCCUPANCY
M00850490-I1
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offR.J.C. MECHANICAL CORP01/29/2025
DOB NOWGeneral ConstructionSigned-offI-RESOLVE CONSTRUCTION GR12/06/2024
DOB NOWGeneral ConstructionSigned-offI-RESOLVE CONSTRUCTION GR09/11/2024
DOB NOWMechanical SystemsSigned-offASE HVAC INC09/03/2024
DOB NOWGeneral ConstructionSigned-offI-RESOLVE CONSTRUCTION GR04/04/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/17/2023
DOB NOWBoiler EquipmentSigned-offDPH PLUMBING & HTG CORP07/21/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP05/30/2023
DOB NOWGeneral ConstructionSigned-offDORMASA CONSTRUCTION INC05/23/2023
DOB NOWMechanical SystemsSigned-offASE HVAC INC03/21/2023
DOB NOWPlumbingSigned-offINNOVATION PLUMBING LLC09/19/2022
DOB NOWGeneral ConstructionSigned-offDORMASA CONSTRUCTION INC03/14/2022
DOB NOWGeneral ConstructionSigned-offDORMASA CONSTRUCTION INC03/03/2022
BISPLISSUEDHUB PLUMBING&HEATING CORP02/01/2013
BISBLISSUEDHUB PLUMBING&HEATING CORP02/01/2013
BISOTISSUEDANCH CONSTRUCTION SVCS IN08/21/2006
BISMHISSUEDANCH CONSTRUCTION SVCS IN08/17/2006
BISOTISSUEDANCH CONSTRUCTION SVCS IN08/17/2006
BISPLISSUEDPHILLIP GEORGE02/28/2001
BISMHISSUEDPHILLIP GEORGW02/28/2001
BISBLISSUEDPHILP GEORGE PLG AND HTG08/07/1997
BISPLISSUEDPHILIP GEORGE PLG & HTG06/05/1997
BISEQISSUEDH & H BUILDING CONSULTANTS,INC.04/11/1997
BISOTISSUEDCREATIVE CORE04/11/1997
2 projects · most recent 11/10/2023
General Wiring
FiledStatusContractorScope
11/10/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
11/10/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
09/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/06/2023Fail-Final Boiler Equipment InspectionFailView ↗
08/15/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/07/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/13/2022No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
10/25/2024Fire-Resistant Penetrations and JointsVincent Liottaspecial
10/25/2024Tenant Protection Plan ComplianceVincent Liottaspecial
10/25/2024Finaljessica nahonprogress
09/12/2024Finaljessica nahonprogress
09/12/2024Fire-Resistant Penetrations and JointsVincent Liottaspecial
09/12/2024Tenant Protection Plan Compliance—special
05/16/2023Tenant Protection Plan ComplianceVincent Liottaspecial
05/16/2023Fire-Resistant Penetrations and JointsVincent Liottaspecial
05/16/2023Chimneys and ventsVincent Liottaspecial
03/28/2023Heating SystemsVincent Liottaspecial
03/28/2023Tenant Protection Plan ComplianceVincent Liottaspecial
03/27/2023Mechanical SystemsVincent Liottaspecial
03/27/2023FinalVincent Liottaprogress
08/10/2022Finaljessica nahonprogress
08/10/2022Fire-Resistant Penetrations and JointsVincent Liottaspecial
08/08/2022Finaljessica nahonprogress
08/08/2022Fire-Resistant Penetrations and JointsVincent Liottaspecial
02/16/2022Finaljessica nahonprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
KreweRetailCellar, Floor 1
Project M01388250 Alteration · Approved · 06/23/2026
Project M01106936 Alteration · LOC Issued · 10/11/2024
Project M00789032 Alteration · LOC Issued · 08/15/2022
Project M00789044 Alteration · LOC Issued · 08/15/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/02/2026M00682275-I1Request digital key ↗
09/02/2026M00686058-I1Request digital key ↗
09/02/2026M00686058-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits10
▸DOB NOWLPC Approval/Permit7
08/16/2026M01388250-I1Open ↗
08/13/2026M00789032-I1Open ↗
08/13/2026M00686058-P1Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
02/05/2013121506860Open ↗
02/05/2013121506860Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/29/2013121506860Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026M00682275-I1Open ↗
08/31/2026M00826900-P1Open ↗
08/31/2026M00826900-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M00850490-I1Open ↗
08/31/2026M00828001-P1Open ↗
08/28/2026M00686058-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/31/2026M00828001-P1Open ↗
08/28/2026M00686058-P1Open ↗
08/28/2026M00686058-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/29/2013121506860Open ↗
01/29/2013121506860Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION2
02/05/2013121506860Open ↗
01/29/2013121506860Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
12/18/2013121506860Open ↗
09/18/2013121506860Open ↗
04/05/2013121506860Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
01/13/2014121506860Open ↗
▸BISSCHEDULE B - PLUMBING1
01/29/2013121506860Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/02/2026M00682275-I1Open ↗
08/31/2026M00826900-P1Open ↗
08/31/2026M00850492-I1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/29/2013121506860Open ↗
01/29/2013121506860Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/29/2013121506860Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/29/2013121506860Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/29/2013121506860Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
12/17/2013121506860Open ↗
09/18/2013121506860Open ↗
▸BISEFILING COVER SHEET1
01/29/2013121506860Open ↗
▸Other Documents10
▸DOB NOWProof of Historic Building10
09/02/2026M00682275-I1Open ↗
08/13/2026M01106936-I1Open ↗
08/13/2026M00686058-P1Open ↗
Showing 3 of 10 on file for this type