General warehouse
67 METROPOLITAN AVENUE
BROOKLYN · BIN 3062394
💬 Discuss this project
1906Year Built
5Stories
E1Building Class
M1-2/R6AZoning
35,625 sfGross Floor Area
5Units
LL97 Covered8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
General warehouse · Owner of record: METROPOLITAN 75 REALTY · 10,000 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 4 filings · 20 docs
Floor 5Under Construction23p · 3 filings · 20 docs
Floor 4Under Construction23p · 5 filings · 20 docs
Floor 3Under Construction24p · 3 filings · 20 docs
Floor 2Under Construction23p · 3 filings · 20 docs
Floor 1Under Construction19p · 3 filings · 20 docs
CellarUnder Construction29p · 5 filings · 20 docs
Basement1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PE1809/30/2026
CREW CONTRACTING OF NJ607/08/2026
NORTHROP GRUMMAN SYSTEMS CORP.503/22/2026
T-MOBILE503/22/2026
METROPOLITAN 75 REALITY CORP3503/22/2026
METROPOLITAN REALTY303/22/2026
67 REALTY INC.203/22/2026
J&G GNRL CONTRACT INC103/21/2026
METROPOLITIOAN73 REALTY103/21/2026
CORNELL REALTY703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
M HASHAS203/21/2026
GC1 EXPEDITING403/21/2026
A1 EXPEDITING SERVICE203/21/2026
BOYD CONSULTING203/21/2026
BART JAVIER ARCHITECT203/21/2026
COGEN ARCHITECTS P C203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE TECH LLCGeneral Contractor809/30/2026
CREW CONTRACTING OF NJ INCGeneral Contractor407/08/2026
PREMIER FLOW PLBG AND HTGFire Protection307/08/2026
PREMIER FLOW PLBG AND HTGPlumbing307/08/2026
STAR ELEC'L CONTRACTORS CElectrical203/22/2026
FRANCIS RICHARDSElectrical203/21/2026
ALPHA SCAFFOLDING INCGeneral Contractor207/08/2026
L.E.C.INCGeneral Contractor203/21/2026
SQUAN CONSTRUCTION SERVICGeneral Contractor203/21/2026
SERGIO GIANNACHIElectrical103/21/2026
SIDNEY ELEC'L CONT'G INC.Electrical103/22/2026
BECKER, CHARLESElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
VIALVA, JOSEPHElectrical103/21/2026
LELIS, ARILSONElectrical103/21/2026
DEMO FILING LLCElectrical103/21/2026
HERMAN, LAWRENCEElectrical103/21/2026
FILARDI, JAMESElectrical103/21/2026
DANIEL J. CONSTRUCTION INGeneral Contractor107/08/2026
MAHRAJ, MOHAMMADElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KWHC CONSULTING ENGINEER9586308/18/2026
RYAN SPECIAL ENGINEERING2018812/05/2024
PRUDIGM ENGINEERING LLCU4304107/12/2024
KMB DESIGN GROUP, LLC513111/08/2022
THE MTM DESIGN GROUP, LLC1319104/16/2021
KM CONSULTING NY, INC.5305103/11/2019
Building Lifecycle
All (192)Filed (27)Permit Issued (19)Signed Off (4)Violation (60)Inspection (9)Objection (43)Special Inspection (30)
09/29/2026
Permit issued — General Construction
B01081160-S5-GC-CX
09/14/2026
Objection raised — Other
09/02/2026
Objection resolved — Open
09/02/2026
Objection resolved — Open
08/18/2026
Filed — Alteration
Installation of plywood temporary construction fence as per drawings.
B01081160-S5
08/12/2026
Objection raised — Other
08/12/2026
Objection raised — Other
07/28/2026
Filed — Alteration
Installation of plywood temporary construction fence as per drawings.
B01081160-P3
07/02/2026
Special inspection requirement — Masonry
Kevin Cheng
07/02/2026
Special inspection requirement — Footing and Foundation
Kevin Cheng
07/02/2026
Special inspection requirement — Final
Kevin Cheng
07/02/2026
Special inspection requirement — Subgrade Inspections
Kevin Cheng
07/02/2026
Special inspection requirement — Structural Steel - Welding
Kevin Cheng
07/02/2026
Special inspection requirement — Structural Steel - Details
Kevin Cheng
07/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kevin Cheng
07/02/2026
Special inspection requirement — Sprayed fire-resistant materials
Kevin Cheng
07/02/2026
Special inspection requirement — Post-installed Anchors
Kevin Cheng
07/02/2026
Special inspection requirement — Concrete - Cast-In-Place
Kevin Cheng
06/22/2026
Permit issued — Structural
B01081160-S4-GC-CX
03/08/2026
Objection resolved — Addressed
03/06/2026
Permit issued — General Construction
B01081160-I1-GC
02/14/2026
Violation issued (FDNY_NOV, closed)
02/06/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/26/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/07/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01293017-P1
01/06/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/16/2025
Permit issued — Construction Fence
B01081160-S1-FN
10/15/2025
Violation issued (ECB, open)
Construction
10/08/2025
Objection raised — Admin
10/07/2025
Permit issued — Supported Scaffold
B01293017-I1-SF
10/06/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01293017-I1
09/27/2025
Objection resolved — Addressed
09/22/2025
Filed — Alteration
Installation of plywood temporary construction fence as per drawings.
B01081160-S1
09/22/2025
Objection raised — Structural
09/11/2025
Filed — Alteration
Installation of plywood temporary construction fence as per drawings.
B01081160-S4
07/18/2025
Permit issued — Sidewalk Shed
B01256607-I1-SH
07/17/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01256607-I1
02/03/2025
Permit issued — Sprinklers
B08023196-I1-EW-SD
01/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/08/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/30/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/13/2024
Permit issued — General Construction
B01081160-I1-GC
12/05/2024
Filed — Alteration
Installation of new gas fueled hot water heater and unit heaters.
B00904633-P3
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
11/25/2024
Filed — Alteration
NEW FIRE-RATED WALL ENCLOSURE AND MOUNTED LIGHT FIXTURE FOR EXISTING GAS METER AND WATER SERVICE ROOMS LOCATED ON THE CELLAR FLOOR.
B01077807-P2
11/19/2024
Special inspection requirement — Lighting controls
William Ryan
11/19/2024
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
11/19/2024
Special inspection requirement — Interior lighting power
William Ryan
11/19/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
11/19/2024
Special inspection requirement — Final
William Ryan
11/04/2024
Filed — Alteration
Installation of new gas fueled hot water heater and unit heaters.
B00904633-P2
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
11/03/2024
Violation issued (FDNY_NOV, closed)
11/02/2024
Violation issued (ECB, closed)
Construction
11/01/2024
Filed — Alteration
(2) New Fire Standpipe Risers. PAA TO PROVIDE 4-INCH RISERS.
B08023196-P2
10/31/2024
Special inspection requirement — Standpipe Systems
William Ryan
10/31/2024
Special inspection requirement — Sprinkler Systems
William Ryan
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCORE TECH LLC09/29/2026
DOB NOWStructuralPermit IssuedCORE TECH LLC06/22/2026
DOB NOWGeneral ConstructionPermit IssuedCORE TECH LLC03/06/2026
DOB NOWConstruction FencePermit IssuedCORE TECH LLC10/16/2025
DOB NOWSupported ScaffoldPermit IssuedALPHA SCAFFOLDING INC10/07/2025
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC07/18/2025
DOB NOWSprinklersPermit IssuedGALICJA PLBG AND HTG CORP02/03/2025
DOB NOWGeneral ConstructionPermit IssuedCORE TECH LLC12/13/2024
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP10/16/2024
DOB NOWStandpipeSigned-offGALICJA PLBG AND HTG CORP10/10/2024
DOB NOWGeneral ConstructionSigned-offDANIEL J. CONSTRUCTION IN10/04/2024
DOB NOWPlumbingPermit IssuedGALICJA PLBG AND HTG.CORP07/22/2024
DOB NOWStandpipeSigned-offGALICJA PLBG AND HTG CORP04/17/2024
DOB NOWGeneral ConstructionSigned-offCORE TECH LLC04/16/2024
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP04/04/2024
DOB NOWAntennaSigned-offSQUAN CONSTRUCTION SERVIC04/06/2023
DOB NOWGeneral ConstructionSigned-offL.E.C.INC05/03/2021
DOB NOWSidewalk ShedPermit IssuedCREW CONTRACTING OF NJ IN02/21/2018
DOB NOWSidewalk ShedPermit IssuedCREW CONTRACTING OF NJ IN01/19/2018
BISOTISSUEDSQUAN CONSTRUCTION SERVIC05/04/2022
BISOTISSUEDSQUAN CONSTRUCTION SERVIC12/08/2021
BISOTISSUEDSQUAN CONSTRUCTION SERVIC07/31/2019
BISOTISSUEDBSD ENVIROMENTAL GROUP LT11/01/2018
BISOTISSUEDZ J CONTRACTING & RESTORATION07/17/2012
BISEQISSUEDJ & G GNRL CONTRACT INC07/05/2012
BISOTISSUEDNOVA VASQUEZ & ASSOCIATES05/06/2010
BIS—ISSUEDDESIGNVIEW CONTRACT CORP04/21/2008
BISOTISSUEDARETE DEVELOPMENT INC.02/20/2008
BISMHISSUEDCOBRA KITCHEN VENTILATION01/09/2008
BISPLISSUEDMETRO INCORPORATED12/07/2007
BISMHISSUEDNEW-COM BUILDING SERVICES INC07/07/2000
1 project · most recent 11/01/2024
FiledStatusContractorScope
11/01/2024Permit IssuedPREMIER FLOW PLBG AND HTG6 heads, 4 outlets
2 projects · most recent 12/05/2024
Gas Water/Sanitary
FiledStatusContractorScope
12/05/2024Signed-offPREMIER FLOW PLBG AND HTGGas
07/12/2024Permit IssuedPREMIER FLOW PLBG AND HTGWater/Sanitary
5 projects · most recent 07/20/2026
General Wiring
FiledStatusContractorScope
07/20/2026Permit IssuedERIC & NG ELEC'L, INC.General Wiring
07/19/2025Permit IssuedRICHARD NEU—
10/07/2022Permit IssuedSTAR ELEC'L CONTRACTORS C—
05/27/2022Permit IssuedSIDNEY ELEC'L CONT'G INC.General Wiring
01/16/2018Permit IssuedGREEN POWER ELECTRIC CORP—
1 project · most recent 08/18/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/18/2026Permit IssuedCORE TECH LLCSteel, Concrete, Masonry
3 projects · most recent 08/18/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
08/18/2026Permit IssuedCORE TECH LLCFence
01/07/2026Permit IssuedALPHA SCAFFOLDING INCScaffold
07/17/2025Permit IssuedALPHA SCAFFOLDING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/06/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/26/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/06/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
07/02/2026MasonryKevin Chengspecial
07/02/2026Footing and FoundationKevin Chengprogress
07/02/2026FinalKevin Chengprogress
07/02/2026Subgrade InspectionsKevin Chengspecial
07/02/2026Structural Steel - WeldingKevin Chengspecial
07/02/2026Structural Steel - DetailsKevin Chengspecial
07/02/2026Structural Stability – Alterations of existing buildingsKevin Chengspecial
07/02/2026Sprayed fire-resistant materialsKevin Chengspecial
07/02/2026Post-installed AnchorsKevin Chengspecial
07/02/2026Concrete - Cast-In-PlaceKevin Chengspecial
12/04/2024Energy Code Compliance InspectionsWilliam Ryanprogress
12/04/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
11/19/2024Lighting controlsWilliam Ryanenergy_progress
11/19/2024Fire-Resistance Rated ConstructionWilliam Ryanprogress
11/19/2024Interior lighting powerWilliam Ryanenergy_progress
11/19/2024Energy Code Compliance InspectionsWilliam Ryanprogress
11/19/2024FinalWilliam Ryanprogress
11/04/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
11/04/2024Energy Code Compliance InspectionsWilliam Ryanprogress
10/31/2024Standpipe SystemsWilliam Ryanspecial
10/31/2024Sprinkler SystemsWilliam Ryanspecial
09/25/2024Fire-Resistant Penetrations and JointsWilliam Ryanspecial
09/25/2024Energy Code Compliance InspectionsWilliam Ryanprogress
08/14/2024Fenestration air leakageMICHAEL COGENenergy_progress
08/08/2024Fenestration and door U-factor and product ratingsMICHAEL COGENenergy_progress
Latest 25 of 32.
▾Documents — 333 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch25
09/03/2026B00004528-I1Request digital key ↗
09/01/2026B00477486-I1Request digital key ↗
08/27/2026B00904633-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/24/2026B01065856-I1Request digital key ↗
08/14/2026B08017854-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/02/2026B00113062-I1Request digital key ↗
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION34
10/26/2021321093044Open ↗
02/25/2021321383597Open ↗
12/26/2018321691843Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION18
05/09/2022321093044Open ↗
04/19/2022321093044Open ↗
12/10/2021321093044Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit5
08/13/2026B01077807-I1Open ↗
08/13/2026B00477486-I1Open ↗
08/13/2026B00978935-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/15/2016321093044Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
11/29/2018321383597Open ↗
▸Seals & Professional Certifications84
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/03/2026B00004528-I1Open ↗
09/02/2026B00113062-I1Open ↗
09/01/2026B00477486-I1Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
12/26/2018321691843Open ↗
10/12/2018321237611Open ↗
05/30/2017321558471Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026B01081160-P3Open ↗
09/01/2026B01081160-P3Open ↗
09/01/2026B01081160-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B01081160-P3Open ↗
09/01/2026B01081160-P3Open ↗
09/01/2026B01077807-P1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
12/26/2018321691843Open ↗
10/12/2018321237611Open ↗
05/30/2017321558471Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/26/2018321691843Open ↗
10/12/2018321237611Open ↗
05/05/2017321558480Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/17/2012320509909Open ↗
07/03/2012320503326Open ↗
▸BISProfessional and Owner Certification (POC3)1
05/30/2017321558471Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING10
06/18/2010320152856Open ↗
06/02/2010320161481Open ↗
05/20/2010320152856Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
12/26/2018321691843Open ↗
05/05/2017321558480Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
08/06/2010320152856Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/29/2007310053205Open ↗
▸Safety & Tenant Protection18
▸DOB NOWCertificate of No Harassment8
08/15/2026B01081160-P3Open ↗
08/13/2026B00477486-I1Open ↗
08/13/2026B01081160-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist4
09/03/2026B00004528-I1Open ↗
08/13/2026B00477486-I1Open ↗
08/13/2026B08002674-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
11/29/2018321383597Open ↗
05/05/2017321558480Open ↗
▸BISANTI-HARASSMENT CHECKLIST2
05/30/2017321558471Open ↗
05/05/2017321558480Open ↗
▸BISTenant Protection Plan and Notes1
05/05/2017321558480Open ↗
▸BISHPD-1 - Anti-Harassment Area Checklist1
12/20/2011320161481Open ↗
▸Environmental & Asbestos48
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/02/2026B00113062-I1Open ↗
09/01/2026B00477486-I1Open ↗
08/27/2026B00904633-P2Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
06/02/2010320161481Open ↗
05/20/2010320152856Open ↗
12/02/2009320096436Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWOER: Notice to Proceed10
09/03/2026B00004528-I1Open ↗
08/15/2026B01081160-P3Open ↗
08/13/2026B00978935-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026B00978935-I1Open ↗
08/13/2026B08002674-I1Open ↗
08/13/2026B00477486-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/26/2018321691843Open ↗
03/25/2015321093044Open ↗
07/17/2012320509909Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/29/2018321383597Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/30/2017321558471Open ↗
05/05/2017321558480Open ↗
03/25/2015321093044Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/28/2022321093044Open ↗
11/29/2018321383597Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/28/2022321093044Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/03/2022321093044Open ↗
09/28/2022321093044Open ↗
11/29/2018321383597Open ↗
▸Approvals, Objections & Sign-offs25
▸BISADMINISTRATIVE OBJECTIONS12
03/25/2015321093044Open ↗
07/16/2012320509909Open ↗
07/03/2012320503326Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
11/27/2018321383597Open ↗
06/16/2017321558480Open ↗
05/16/2017321558480Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
12/28/2018321383597Open ↗
12/26/2018321383597Open ↗
11/29/2018321383597Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/04/2022321093044Open ↗
07/29/2009310088295Open ↗
07/10/2009310088295Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
12/26/2018321691843Open ↗
11/29/2018321383597Open ↗
11/16/2018321829438Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET15
12/26/2018321691843Open ↗
11/16/2018321829438Open ↗
11/09/2018321383597Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM5
12/14/2018310031355Open ↗
12/05/2018310031355Open ↗
11/20/2018321558480Open ↗
Showing 3 of 5 on file for this type
▸Other Documents6
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation2
09/03/2026B00004528-I1Open ↗
08/13/2026B00113062-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board2
09/03/2026B00004528-I1Open ↗
08/13/2026B00113062-I1Open ↗
▸BISPLOT DIAGRAM1
05/05/2017321558480Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE OF SATIS1
07/03/2008310058914Open ↗