← Back
Two family frame
67 ROANOKE STREET
💬 Discuss this project
1975Year Built
2Stories
B2Building Class
R3-1Zoning
2,264 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family frame · 4,360 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHAHRISH SHUVO ENGINEERING P.C.102/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG BUILDING CONSULTANTS LLC LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LOWVOLT TECH ENTERPRISESGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524102/24/2025
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Objection (2)Special Inspection (5)
12/18/2025
Signed off — Alteration
Interior renovation associated with new elevator shaft as per plans filed.
S01173952-I1
11/26/2025
Violation issued (HPD, closed)
I
05/27/2025
Permit issued — General Construction
S01173952-I1-GC-CX
05/20/2025
Objection resolved — Addressed
03/03/2025
Objection raised — Scope
02/24/2025
Filed — Alteration
Interior renovation associated with new elevator shaft as per plans filed.
S01173952-I1
01/30/2025
Special inspection requirement — Subgrade Inspections
Shahrish Shuvo
01/30/2025
Special inspection requirement — Concrete - Cast-In-Place
Shahrish Shuvo
01/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
01/30/2025
Special inspection requirement — Final
Shahrish Shuvo
01/30/2025
Special inspection requirement — Footing and Foundation
Shahrish Shuvo
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLOWVOLT TECH ENTERPRISES05/27/2025
1 project · most recent 06/24/2025
General Wiring
FiledStatusContractorScope
06/24/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/30/2025Subgrade InspectionsShahrish Shuvospecial
01/30/2025Concrete - Cast-In-PlaceShahrish Shuvospecial
01/30/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
01/30/2025FinalShahrish Shuvoprogress
01/30/2025Footing and FoundationShahrish Shuvoprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01173952-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026S01173952-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026S01173952-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026S01173952-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026S01173952-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01173952-I1Open ↗