← Back
Two stories - detached, small or mid-size
67 ROMAN AVENUE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5031651
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R3XZoning
—Gross Floor Area
1Units
Two stories - detached, small or mid-size · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BIS—ISSUEDJ.B.I. CONSTRUCTION GROUP07/01/2025
BIS—ISSUEDBEN DICOSTANZO INC10/23/2013
BISPLISSUEDCLP PLUMBING,INC04/17/2013
BISEQISSUEDBEN DICOSTANZO INC02/06/2013
BIS—ISSUEDBEN DICOSTANZO INC02/06/2013
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 93 on file (BIS + DOB NOW)
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION10
08/13/2025520112707Open ↗
08/01/2025520112707Open ↗
07/31/2025520112707Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
07/01/2025520112707Open ↗
10/29/2013520112707Open ↗
04/19/2013520112707Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/08/2023520112707Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
08/17/2012520108794Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/01/2012520108794Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISVERIFY TAX LOT1
09/23/2025520112707Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/11/2025520112707Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/11/2025520112707Open ↗
▸BISZONING DIAGRAM1
01/23/2013520112707Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
01/11/2013520112707Open ↗
▸Seals & Professional Certifications3
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/16/2013520112707Open ↗
01/11/2013520112707Open ↗
01/11/2013520112707Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE2
03/05/2014520112707Open ↗
07/19/2013520112707Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/23/2025520112707Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/23/2025520112707Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/23/2025520112707Open ↗
▸BISFINAL SURVEY TO BE CHECKED ( DIMENSIONSACCORDING TO PROPOSED PLANS, IF DIMENSIONS EXCEEDS PROPOSED A SPRINKLER SYSTEM IS REQUIRED1
11/06/2025520112707Open ↗
▸BISSCHEDULE B - PLUMBING1
11/08/2012520112707Open ↗
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
02/07/2013520112707Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/11/2012520112707Open ↗
▸BISSTREET TREE CHECKLIST1
10/15/2012520112707Open ↗
▸BISSTREET TREE SIGNOFF1
09/16/2025520112707Open ↗
▸BISStreet Trees- Receipt of Street Trees Site Plan1
10/15/2012520112707Open ↗
▸BISSTREET TREES SITE PLAN1
09/16/2025520112707Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
01/11/2013520112707Open ↗
▸Energy Compliance10
▸BISAIR SEALING AND INSULATION - VISUAL1
07/23/2025520112707Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/23/2025520112707Open ↗
▸BISFENESTRATION AREAS1
07/23/2025520112707Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/23/2025520112707Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/23/2025520112707Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/23/2025520112707Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/23/2025520112707Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/23/2025520112707Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/23/2013520112707Open ↗
▸BISFENESTRATION AIR LEAKAGE1
07/23/2025520112707Open ↗
▸Inspections & Test Reports10
▸BISCONCRETE - CAST-IN-PLACE1
07/23/2025520112707Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
07/24/2025520112707Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/23/2025520112707Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/23/2025520112707Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/23/2025520112707Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/23/2025520112707Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
10/01/2012520108794Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
07/23/2025520112707Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
01/11/2013520112707Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
07/23/2025520112707Open ↗
▸Approvals, Objections & Sign-offs18
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/12/2025520112707Open ↗
04/27/2023520108794Open ↗
04/27/2023520108794Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER5
07/01/2025520112707Open ↗
07/01/2025520112707Open ↗
06/18/2025520112707Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
08/13/2025520112707Open ↗
08/01/2025520112707Open ↗
07/31/2025520112707Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/11/2012520112707Open ↗
08/16/2012520108794Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
10/01/2012520108794Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
10/11/2012520112707Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/08/2023520112707Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
07/01/2025520112707Open ↗
06/18/2025520112707Open ↗
▸BISEFILING COVER SHEET2
10/11/2012520112707Open ↗
08/16/2012520108794Open ↗
▸BISADDITIONAL INFORMATION1
08/17/2012520108794Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
01/23/2013520112707Open ↗
01/23/2013520112707Open ↗
09/06/2012520108794Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
07/23/2025520112707Open ↗
▸BISMAINTENANCE INFORMATION1
07/23/2025520112707Open ↗
▸BISPERMANENT CERTIFICATE1
07/23/2025520112707Open ↗
▸BISFIREPLACES1
07/23/2025520112707Open ↗
▸BISPLOT DIAGRAM1
10/11/2012520112707Open ↗