← Back
Condo, residential unit in walk-up building
The 63, 65 & 67 West 107th Street Condominium
67 WEST 107 STREET · BIN 1055682
💬 Discuss this project
1909Year Built
5Stories
R2Building Class
R8BZoning
33,619 sfGross Floor Area
56Units
Rent Stabilized134 Open Violations 131 unresolved · 3 paperwork only ▸
Condo, residential unit in walk-up building · Owner of record: THE 63,65 & 67 W.107TH ST CONDOMINU · 11,353 sf lot · 2.96 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
63 65 67 W 107 ST CONDOMINIUM809/03/2026
ACE GROUP NY607/08/2026
XINOS CONSTRUCTION104/09/2026
BREGAGLIO & FIGLI LLC403/22/2026
63 WEST 107TH STREET, LLC503/22/2026
THE 63 65 & 67 W 107TH ST103/22/2026
THE 63,65,AND 67 WEST 107303/22/2026
63 W 107TH ST,LLC303/22/2026
THE 63,65 & 67 WEST 107TH103/22/2026
BREGACLIO & FIGLI LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM DESIGN CONSULTANTS LLC103/24/2026
PARADIGM ARCHITECTURE110/08/2025
VOLUME SPACE CONSULTING INC.101/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor407/08/2026
KOSTANDINOS TSOUKANTASElectrical203/21/2026
XINOS CONSTRUCTION CORPGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARADIGM ARCHITECTURE5931110/08/2025
Building Lifecycle
All (79)Filed (4)Permit Issued (6)Signed Off (1)Violation (60)Inspection (1)Special Inspection (7)
09/02/2026
Permit issued — Suspended Scaffold
M01279651-I1-SC
08/20/2026
Signed off — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01376973-I1
05/07/2026
Permit issued — General Construction
M01128020-I1-GC
03/24/2026
Filed — Alteration
PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2022 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01376973-I1
03/24/2026
Permit issued — Sidewalk Shed
M01376973-I1-SH
12/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/10/2025
Permit issued — Sidewalk Shed
M00991514-I1-SH
10/08/2025
Filed — Alteration
Exterior repairs consisting of sealant application, stucco repairs , cutting & repointing, brick and sill replacement as per plans filed herewith.
M01128020-I1
09/03/2025
Permit issued — Suspended Scaffold
M01279651-I1-SC
08/29/2025
Filed — Alteration
OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01279651-I1
08/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Anthony Addesso
08/18/2025
Special inspection requirement — Post-installed Anchors
Anthony Addesso
08/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
08/18/2025
Special inspection requirement — Masonry
Anthony Addesso
08/18/2025
Special inspection requirement — Air barrier - visual inspection
Anthony Addesso
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Anthony Addesso
10/16/2024
Special inspection requirement — Final
Anthony Addesso
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/17/2024
Filed — Alteration
M00991514-I1
01/17/2024
Permit issued — Sidewalk Shed
M00991514-I1-SH
05/12/2023
Violation issued (ECB, open)
Construction
07/13/2022
Violation issued (HPD, open)
B
07/13/2022
Violation issued (HPD, open)
A
07/26/2021
Violation issued (ECB, closed)
Construction
07/26/2021
Violation issued (ECB, closed)
Construction
04/02/2021
Violation issued (HPD, closed)
A
09/16/2019
Violation issued (HPD, open)
C
09/16/2019
Violation issued (HPD, open)
B
09/16/2019
Violation issued (HPD, open)
C
09/16/2019
Violation issued (HPD, closed)
C
09/16/2019
Violation issued (HPD, open)
A
09/16/2019
Violation issued (HPD, open)
A
09/16/2019
Violation issued (HPD, closed)
C
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/04/2019
Violation issued (ECB, open)
Construction
02/04/2019
Violation issued (ECB, closed)
Construction
02/04/2019
Violation issued (ECB, open)
Construction
11/08/2018
Violation issued (HPD, open)
B
11/08/2018
Violation issued (HPD, open)
B
10/12/2018
Violation issued (HPD, open)
B
10/12/2018
Violation issued (HPD, open)
B
10/10/2018
Violation issued (HPD, closed)
I
08/20/2018
Violation issued (HPD, open)
B
08/20/2018
Violation issued (HPD, open)
B
08/20/2018
Violation issued (HPD, open)
B
08/20/2018
Violation issued (HPD, open)
B
05/18/2018
Violation issued (ECB, closed)
Construction
05/15/2018
Violation issued (ECB, closed)
Construction
02/13/2018
Violation issued (ECB, closed)
Construction
02/13/2018
Violation issued (ECB, closed)
Construction
02/13/2018
Violation issued (ECB, closed)
Construction
02/13/2018
Violation issued (ECB, closed)
Construction
02/13/2018
Violation issued (ECB, closed)
Construction
11/29/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/12/2017
Violation issued (HPD, closed)
C
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP09/02/2026
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/07/2026
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP03/24/2026
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP12/10/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP09/03/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP01/17/2024
BISPLISSUEDC JAMES PLBG & HTG INC10/11/2017
BISFBISSUEDTHE WIZARD OF HTG REPAIR10/11/2017
BISFBISSUEDTHE WIZARD OF HTG REPAIR07/26/2016
BISBLISSUEDC JAMES PLBG & HTG INC07/14/2016
BISPLISSUEDC JAMES PLBG & HTG INC07/05/2016
BISOTISSUEDSOMEK KADOSH CONTRACTOR,09/28/2015
BISPLISSUEDWYNNE PLBG & HEATING CORP02/24/2014
BISOTISSUEDCDP GENERAL CONTRACTORS L02/20/2014
BISPLISSUEDMAXWELL PLUMB MECH. CORP04/12/2012
BISOTISSUEDMAXWELL PLUMB MECH CORP04/12/2012
BISBLISSUEDHI-TECH HEATING CORP09/30/2011
BISFSISSUEDHI-TECH HEATING CORP09/29/2011
BISPLISSUEDCROSSFIELD PLBG.&HTG09/29/2011
BISOTISSUEDCDP GENERAL CONTRACTORS L09/26/2011
BISPLISSUEDWYNNE PLBG & HEATING CORP08/29/2011
BISOTISSUEDCDP GENERAL CONTRACTORS L07/27/2011
4 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
03/24/2026Permit IssuedTOWER ELECTRIC INC.—
06/04/2025CompleteKET ELECTRIC LLCGeneral Wiring
09/27/2024CancelledKET ELECTRIC LLCGeneral Wiring
1 project · most recent 03/24/2026
Sidewalk Shed
FiledStatusContractorScope
03/24/2026Signed-offXINOS CONSTRUCTION CORPSidewalk Shed
1 project · most recent 08/29/2025
Suspended Scaffold
FiledStatusContractorScope
08/29/2025Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold
1 project · most recent 08/29/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
08/29/2025Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/18/2025Tenant Protection Plan ComplianceAnthony Addessospecial
08/18/2025Post-installed AnchorsAnthony Addessospecial
08/18/2025Structural Stability – Alterations of existing buildingsAnthony Addessospecial
08/18/2025MasonryAnthony Addessospecial
08/18/2025Air barrier - visual inspectionAnthony Addessoenergy_progress
08/18/2025Energy Code Compliance InspectionsAnthony Addessoprogress
10/16/2024FinalAnthony Addessoprogress
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/06/2026M01376973-I1Request digital key ↗
08/28/2026M00991514-I1Request digital key ↗
08/21/2026M01279651-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits33
▸BISWORK PERMIT APPLICATION18
07/29/2016122716212Open ↗
07/29/2016122716212Open ↗
07/19/2016122716212Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
09/10/2019122716212Open ↗
10/29/2018122716212Open ↗
09/20/2018122716212Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/25/2008110332435Open ↗
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
07/11/2016122716212Open ↗
07/01/2016140407646Open ↗
09/11/2014122044652Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
07/11/2016122716212Open ↗
02/19/2014121924560Open ↗
10/05/2011120840509Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
10/05/2011120840509Open ↗
07/15/2011120758858Open ↗
06/11/2010120372747Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/11/2016122716212Open ↗
09/26/2015140407646Open ↗
02/19/2014121924560Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/06/2026M01376973-I1Open ↗
08/13/2026M00991514-I1Open ↗
08/13/2026M01128020-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026M01128020-I1Open ↗
08/23/2026M01128020-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/26/2015140407646Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/26/2015140407646Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M01128020-I1Open ↗
▸Trade Schedules & Equipment16
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/29/2018122716212Open ↗
09/20/2018122716212Open ↗
07/11/2016122716212Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
11/08/2011120758858Open ↗
11/05/2011120887246Open ↗
11/01/2011120758858Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
08/22/2014121924560Open ↗
06/05/2014121924560Open ↗
06/05/2014121924560Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
07/11/2016122716212Open ↗
10/05/2011120840509Open ↗
▸Environmental & Asbestos12
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
11/05/2011120887246Open ↗
10/05/2011120840509Open ↗
07/15/2011120758858Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/11/2016122716212Open ↗
09/26/2015140407646Open ↗
09/11/2014122044652Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/25/2008110332435Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01128020-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY2
10/05/2011120840509Open ↗
10/05/2011120840509Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/01/2016140407646Open ↗
02/19/2014121924560Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/26/2015140407646Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/13/2012120887246Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/01/2016140407646Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/26/2015140407646Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/26/2015140407646Open ↗
▸Approvals, Objections & Sign-offs7
▸BISADMINISTRATIVE OBJECTIONS5
11/05/2011120887246Open ↗
10/05/2011120840509Open ↗
07/15/2011120758858Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/01/2016140407646Open ↗
12/06/2012120887246Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
07/11/2016122716212Open ↗
07/01/2016140407646Open ↗
09/26/2015140407646Open ↗
Showing 3 of 10 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
02/24/2014121924560Open ↗
08/02/2011120758858Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET5
07/11/2016122716212Open ↗
09/11/2014122044652Open ↗
02/19/2014121924560Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
09/10/2019122716212Open ↗
09/20/2018122716212Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/26/2015140407646Open ↗
09/25/2008110332435Open ↗
▸BISADDITIONAL INFORMATION1
12/02/2011120758858Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/06/2012120887246Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01279651-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01279651-I1Open ↗