← Back
Four families
67 WEST 169 STREET
BRONX · Highbridge · BIN 2003110
💬 Discuss this project
1925Year Built
3Stories
C3Building Class
R7-1Zoning
3,000 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Four families · Owner of record: 67 W 169TH ST LLC · 1,578 sf lot · 1.9 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 413p · 2 filings · 20 docs
Floor 311p · 2 filings · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 112p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OXFORD ASSETS4507/08/2026
67 W 169TH ST LLC103/22/2026
OWNER OF 67 WEST 169 STRE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HERTZ ENGINEERING, PLLC1611/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FORTRESS FORCE CONST. CORGeneral Contractor607/08/2026
SANI & SONS DEVELOPERS INGeneral Contractor303/21/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HERTZ ENGINEERING, PLLC9414811/11/2025
INDETAIL DESIGN ARCHITECT4828105/29/2024
Building Lifecycle
All (168)Filed (16)Permit Issued (8)Signed Off (6)Violation (32)Inspection (10)Objection (66)Special Inspection (30)
12/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/17/2025
Special inspection requirement — Fenestration areas
JASON S. HERTZ
11/17/2025
Special inspection requirement — Exterior lighting power
JASON S. HERTZ
11/17/2025
Special inspection requirement — Insulation placement and R values
JASON S. HERTZ
11/17/2025
Special inspection requirement — Maintenance information
JASON S. HERTZ
11/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JASON S. HERTZ
11/17/2025
Special inspection requirement — Lighting in dwelling units
JASON S. HERTZ
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JASON S. HERTZ
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
JASON S. HERTZ
11/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
JASON S. HERTZ
11/17/2025
Special inspection requirement — Lighting controls
JASON S. HERTZ
11/17/2025
Special inspection requirement — Interior lighting power
JASON S. HERTZ
11/17/2025
Special inspection requirement — Fenestration air leakage
JASON S. HERTZ
11/17/2025
Special inspection requirement — Air barrier - visual inspection
JASON S. HERTZ
11/11/2025
Filed — Alteration CO
ALT1 TO CONVERT EXTG. 4 APTS TO 8 APTS ,INTERIOR DEMOLITION , NEW PARTITIONS , NEW KITCHEN ,BATHROOM, NEW LIGHTING AND ELECTRICAL WORK FOR THE NEW APT AS PER PLANS, OBTAIN NEW C/O.
X01002892-P3
11/07/2025
Special inspection requirement — Insulation placement and R values
JASON S. HERTZ
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JASON S. HERTZ
11/07/2025
Special inspection requirement — Energy Code Compliance Inspections
JASON S. HERTZ
11/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
JASON S. HERTZ
11/07/2025
Special inspection requirement — Fenestration air leakage
JASON S. HERTZ
11/07/2025
Special inspection requirement — Lighting in dwelling units
JASON S. HERTZ
11/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JASON S. HERTZ
11/07/2025
Special inspection requirement — Fenestration areas
JASON S. HERTZ
11/07/2025
Special inspection requirement — Maintenance information
JASON S. HERTZ
11/07/2025
Special inspection requirement — Interior lighting power
JASON S. HERTZ
11/07/2025
Special inspection requirement — Lighting controls
JASON S. HERTZ
11/07/2025
Special inspection requirement — Exterior lighting power
JASON S. HERTZ
11/07/2025
Special inspection requirement — Air barrier - visual inspection
JASON S. HERTZ
10/03/2025
Signed off — Alteration
X01266514-I1
09/25/2025
Filed — Alteration
X01266514-P2
09/25/2025
Special inspection requirement — Final
JASON S. HERTZ
09/25/2025
Special inspection requirement — Final
JASON S. HERTZ
09/03/2025
Filed — Alteration
X01266514-P1
09/02/2025
Special inspection requirement — Final
JASON S. HERTZ
08/08/2025
Permit issued — General Construction
X01266514-I1-GC
08/05/2025
Filed — Alteration
X01266514-I1
05/30/2025
Filed — Alteration CO
ALT1 TO CONVERT EXTG. 4 APTS TO 8 APTS ,INTERIOR DEMOLITION , NEW PARTITIONS , NEW KITCHEN ,BATHROOM, NEW LIGHTING AND ELECTRICAL WORK FOR THE NEW APT AS PER PLANS, OBTAIN NEW C/O.
X01002892-P2
05/19/2025
Signed off — Alteration CO
ALT1 TO CONVERT EXTG. 4 APTS TO 8 APTS ,INTERIOR DEMOLITION , NEW PARTITIONS , NEW KITCHEN ,BATHROOM, NEW LIGHTING AND ELECTRICAL WORK FOR THE NEW APT AS PER PLANS, OBTAIN NEW C/O.
X01002892-S1
05/19/2025
Signed off — Alteration
FILE INTERIOR NON-STRUCTURAL DEMOLITION WORK,AND MINOR STRUCUTRAL WORK DURING DEMO . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00968496-S1
05/12/2025
Signed off — Alteration
FILE INTERIOR NON-STRUCTURAL DEMOLITION WORK,AND MINOR STRUCUTRAL WORK DURING DEMO . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00968496-I1
05/12/2025
Signed off — Alteration
propose new sprinkler sytem for the building in conjunction with ALt1 job# X01002892-I1
X01105950-I1
05/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/21/2025
Signed off — Alteration CO
ALT1 TO CONVERT EXTG. 4 APTS TO 8 APTS ,INTERIOR DEMOLITION , NEW PARTITIONS , NEW KITCHEN ,BATHROOM, NEW LIGHTING AND ELECTRICAL WORK FOR THE NEW APT AS PER PLANS, OBTAIN NEW C/O.
X01002892-S2
04/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/18/2025
Filed — Alteration
FILE INTERIOR NON-STRUCTURAL DEMOLITION WORK,AND MINOR STRUCUTRAL WORK DURING DEMO . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00968496-P4
02/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/06/2025
Filed — Alteration CO
ALT1 TO CONVERT EXTG. 4 APTS TO 8 APTS ,INTERIOR DEMOLITION , NEW PARTITIONS , NEW KITCHEN ,BATHROOM, NEW LIGHTING AND ELECTRICAL WORK FOR THE NEW APT AS PER PLANS, OBTAIN NEW C/O.
X01002892-P1
01/30/2025
Permit issued — Mechanical Systems
X01002892-S2-MS
01/08/2025
Filed — Alteration
FILE INTERIOR NON-STRUCTURAL DEMOLITION WORK,AND MINOR STRUCUTRAL WORK DURING DEMO . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00968496-P3
01/08/2025
Filed — Alteration
FILE INTERIOR NON-STRUCTURAL DEMOLITION WORK,AND MINOR STRUCUTRAL WORK DURING DEMO . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00968496-P2
10/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/23/2024
Objection raised — Other
10/23/2024
Objection resolved — Addressed
10/23/2024
Objection raised — Fire_Protection
10/23/2024
Objection resolved — Addressed
10/22/2024
Permit issued — Plumbing
X01002892-S1-PL
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFORTRESS FORCE CONST. COR08/08/2025
DOB NOWMechanical SystemsSigned-offFORTRESS FORCE CONST. COR01/30/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS10/22/2024
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL10/15/2024
DOB NOWGeneral ConstructionPermit IssuedFORTRESS FORCE CONST. COR10/11/2024
DOB NOWGeneral ConstructionSigned-offFORTRESS FORCE CONST. COR07/01/2024
DOB NOWGeneral ConstructionSigned-offSANI & SONS DEVELOPERS IN01/09/2024
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS01/08/2024
BISPLISSUEDFERNANDEZ HTG & MECH CORP.11/17/2005
BIS—ISSUEDST LOREN CONSTRUCTION CORP07/29/2005
1 project · most recent 11/11/2025
Water/Sanitary
FiledStatusContractorScope
11/11/2025Signed-offDYNAMIC PLBG & SPRKLR CORWater/Sanitary
1 project · most recent 08/20/2025
General Wiring
FiledStatusContractorScope
08/20/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
11/17/2025Fenestration areasJASON S. HERTZenergy_progress
11/17/2025Exterior lighting powerJASON S. HERTZenergy_progress
11/17/2025Insulation placement and R valuesJASON S. HERTZenergy_progress
11/17/2025Maintenance informationJASON S. HERTZenergy_progress
11/17/2025Fenestration and door U-factor and product ratingsJASON S. HERTZenergy_progress
11/17/2025Lighting in dwelling unitsJASON S. HERTZenergy_progress
11/17/2025Fire-Resistant Penetrations and JointsJASON S. HERTZspecial
11/17/2025Energy Code Compliance InspectionsJASON S. HERTZprogress
11/17/2025Fire-Resistance Rated ConstructionJASON S. HERTZprogress
11/17/2025Lighting controlsJASON S. HERTZenergy_progress
11/17/2025Interior lighting powerJASON S. HERTZenergy_progress
11/17/2025Fenestration air leakageJASON S. HERTZenergy_progress
11/17/2025Air barrier - visual inspectionJASON S. HERTZenergy_progress
11/07/2025Insulation placement and R valuesJASON S. HERTZenergy_progress
11/07/2025Fire-Resistant Penetrations and JointsJASON S. HERTZspecial
11/07/2025Energy Code Compliance InspectionsJASON S. HERTZprogress
11/07/2025Fire-Resistance Rated ConstructionJASON S. HERTZprogress
11/07/2025Fenestration air leakageJASON S. HERTZenergy_progress
11/07/2025Lighting in dwelling unitsJASON S. HERTZenergy_progress
11/07/2025Fenestration and door U-factor and product ratingsJASON S. HERTZenergy_progress
11/07/2025Fenestration areasJASON S. HERTZenergy_progress
11/07/2025Maintenance informationJASON S. HERTZenergy_progress
11/07/2025Interior lighting powerJASON S. HERTZenergy_progress
11/07/2025Lighting controlsJASON S. HERTZenergy_progress
11/07/2025Exterior lighting powerJASON S. HERTZenergy_progress
Latest 25 of 49.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/21/2026X00968496-I1Request digital key ↗
08/21/2026X00968496-P4Request digital key ↗
08/21/2026X00968496-P3Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X01002892-I1Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature34
09/01/2026X01002892-I1Open ↗
09/01/2026X01002892-I1Open ↗
09/01/2026X01002892-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/20/2026X01105950-I1Open ↗
08/18/2026X01266514-P1Open ↗
08/18/2026X01266514-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026X01002892-I1Open ↗
08/27/2026X00968496-P1Open ↗
08/27/2026X01002892-S1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026X01002892-P1Open ↗
08/13/2026X01002892-P2Open ↗
08/13/2026X01002892-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/20/2026X01105950-I1Open ↗
08/18/2026X01266514-P1Open ↗
08/18/2026X01266514-P2Open ↗
Showing 3 of 16 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026X01002892-P3Open ↗
08/13/2026X01002892-P2Open ↗
08/13/2026X01002892-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X01002892-I1Open ↗