ECB06/02/2026FAILURE TO MAINTAIN BUILDING CODE COMPLIANT. NOTED: AT TIME OF INSPECTION OBSERVED AT EXPOSURE 1 THE FIRST FLOOR FRONT, THE LINTEL IS DEFLECTING AND THERE IS A FOUR FOOT SECTION OF BRICK MASONRY ABOVE THE WINDOHearing held — result not yet published$1K proposed
Two family brick · 2,500 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.