← Back
Four families
Fac Joe Shelter Retrofit Ghpp
670 6 AVENUE · BIN 3017164
💬 Discuss this project
1931Year Built
4Stories
C3Building Class
R6BZoning
5,340 sfGross Floor Area
4Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Four families · Owner of record: FAC CLUSTER HOUSING DEVELOPMENT FUND COR PORATION · 1,888 sf lot · 2.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 4Under Construction40p · 1 filing · 20 docs
Floor 3Under Construction40p · 1 filing · 20 docs
Floor 2Under Construction38p · 1 filing · 20 docs
Floor 1Under Construction36p · 1 filing · 20 docs
CellarUnder Construction45p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES404/09/2026
FAC CLUSTER HOUSING DEVELOPMENT FUND COR PORATION103/22/2026
A A D CONSTRUCTION103/22/2026
OWNER OF 670 6 AVE103/22/2026
FAC - RESTORE - HDFC403/21/2026
NEIGHBORHOOD PARTNERSHIP HOUSING203/21/2026
JOE FAC INFINITY LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ESKW/A606/15/2026
RIGID STRUCTURAL DESIGN, LLC206/06/2025
OLD STRUCTURES ENGINEERING, P.C.104/08/2025
MJE PROFESSIONAL SERVICES103/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS503/21/2026
Rigid Structural Design, LLC403/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A.D. CONSTRUCTION CORPGeneral Contractor607/08/2026
MSR CONSTRUCTION CORPGeneral Contractor604/09/2026
RELIABLE ENTERPRISES INCGeneral Contractor104/09/2026
AJC PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803706/15/2026
Building Lifecycle
All (146)Filed (10)Permit Issued (11)Signed Off (2)Violation (60)Inspection (7)Objection (26)Special Inspection (30)
08/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/26/2026
Signed off — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01219926-I1
06/26/2026
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01219475-I1
06/15/2026
Filed — Alteration
General construction consisting of roof and window replacement, EIFS over cladding insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy.
B00991642-P3
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/07/2026
Permit issued — Mechanical Systems
B00991642-S2-MS
05/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
05/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
04/30/2026
Violation issued (HPD, closed)
A
04/29/2026
Filed — Alteration
General construction consisting of roof and window replacement, EIFS over cladding insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy.
B00991642-P2
04/28/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
04/28/2026
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
03/02/2026
Permit issued — General Construction
B00991642-I1-GC
03/02/2026
Permit issued — Structural
B00991642-S3-ST
01/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/05/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/19/2025
Violation issued (HPD, closed)
I
09/04/2025
Violation issued (ECB, closed)
Site Safety
07/25/2025
Permit issued — Protection and Mechanical Methods
B01219926-I1-PMM
07/25/2025
Permit issued — Supported Scaffold
B01219475-I1-SF
06/09/2025
Permit issued — Protection and Mechanical Methods
B01219926-I1-PMM
06/09/2025
Permit issued — Supported Scaffold
B01219475-I1-SF
06/06/2025
Filed — Alteration
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01219926-I1
06/06/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01219475-I1
05/01/2025
Permit issued — Structural
B00991642-S3-ST
04/08/2025
Filed — Alteration
General construction consisting of roof and window replacement, EIFS over cladding insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy.
B00991642-P1
04/08/2025
Permit issued — Plumbing
B00991642-S1-PL
03/11/2025
Permit issued — Sidewalk Shed
B01192524-I1-SH
03/10/2025
Filed — Alteration
B01192524-I1
03/03/2025
Permit issued — General Construction
B00991642-I1-GC
06/12/2024
Filed — Alteration
General construction consisting of roof and window replacement, EIFS over cladding insulation at exterior walls along with interior renovations as per plans filed herewith. No change to use, egress or occupancy.
B00991642-S1
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedA.A.D. CONSTRUCTION CORP05/07/2026
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP03/02/2026
DOB NOWStructuralPermit IssuedA.A.D. CONSTRUCTION CORP03/02/2026
DOB NOWProtection and Mechanical MethodsSigned-offMSR CONSTRUCTION CORP07/25/2025
DOB NOWSupported ScaffoldSigned-offMSR CONSTRUCTION CORP07/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offMSR CONSTRUCTION CORP06/09/2025
DOB NOWSupported ScaffoldSigned-offMSR CONSTRUCTION CORP06/09/2025
DOB NOWStructuralPermit IssuedA.A.D. CONSTRUCTION CORP05/01/2025
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP04/08/2025
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC03/11/2025
DOB NOWGeneral ConstructionPermit IssuedA.A.D. CONSTRUCTION CORP03/03/2025
BISOTISSUEDPAUL SIGNS INC04/20/2007
BISBLISSUEDWILLIAM C. GERAKARIS P&H01/16/2007
BIS—ISSUEDCRESCENT STREET CONSTRUCTION05/15/2006
BISEQISSUEDCRESCENT STREET CONSTRUCTION05/15/2006
BISSPISSUEDAURA PLUMBING INC04/18/2006
BISEQISSUEDCRESCENT STREET CONSTRUCTION12/23/2005
BISEQISSUEDCRESCENT STREET CONSTRUCTION07/18/2005
BIS—ISSUEDCRESCENT STREET CONSTRUCTION06/06/2005
BISEQISSUEDL B CONST02/10/2000
1 project · most recent 06/15/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/15/2026Permit IssuedA.A.D. CONSTRUCTION CORPAir Conditioning Systems
Cooling
Mitsubishi Electric PKFY-P04NLMU-E.TH 4,000 BTU · Vrf Indoor ×20
MXZ-SM48NAMHZ2-U1 48,000 BTU · Vrf Outdoor ×2
1 project · most recent 06/15/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/15/2026Signed-offAJC PLUMBING & HTG CORPGas, Storm, Water/Sanitary
2 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedAMR ELEC'L CONTRG CORPGeneral Wiring
03/11/2025Permit IssuedRICHARD NEU—
1 project · most recent 06/15/2026
Steel Concrete Wood
FiledStatusContractorScope
06/15/2026Permit IssuedA.A.D. CONSTRUCTION CORPSteel, Concrete, Wood
1 project · most recent 06/06/2025
Scaffold
FiledStatusContractorScope
06/06/2025Signed-offMSR CONSTRUCTION CORPScaffold
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
07/06/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/06/2026Tenant Protection Plan Compliance—special
07/06/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/06/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
07/06/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
07/06/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/12/2026Tenant Protection Plan Compliance—special
06/12/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
06/12/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
06/12/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/12/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
06/12/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/05/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/05/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
05/05/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/05/2026Shutoff dampersSAMI HAJJAR P.Eenergy_progress
05/05/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/05/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
05/05/2026Mechanical SystemsSAMI HAJJAR P.Especial
05/05/2026FinalSAMI HAJJAR P.Eprogress
05/05/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/05/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
04/28/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
04/28/2026Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
04/28/2026Mechanical SystemsSAMI HAJJAR P.Especial
Latest 25 of 49.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/22/2026B01192524-I1Request digital key ↗
08/22/2026B00991642-P3Request digital key ↗
08/22/2026B00991642-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/22/2026B01192524-I1Open ↗
08/22/2026B00991642-S2Open ↗
08/22/2026B00991642-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B00991642-I1Open ↗
09/02/2026B00991642-I1Open ↗
08/24/2026B00991642-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B00991642-I1Open ↗
08/24/2026B00991642-S1Open ↗
08/24/2026B00991642-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/22/2026B00991642-P3Open ↗
08/22/2026B00991642-P2Open ↗
08/22/2026B00991642-S3Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/22/2026B00991642-S3Open ↗
08/22/2026B00991642-P3Open ↗
08/22/2026B00991642-P2Open ↗
Showing 3 of 7 on file for this type