← Back
BuildNYC
Over six families without stores
670 EVERGREEN AVENUE
BROOKLYN · BIN 3078774
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6Zoning
11,970 sfGross Floor Area
12Units
Rent Stabilized0 Active Violations 2 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: Bushwick Gardens · 17,430 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 1A, Unit 1B, Unit 1C +12p · 1 filing · 6 docs
CellarSushwick Gardens - Group a42p · 2 filings · 20 docs
Site & exteriorSushwick Gardens - Group a34p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pennrose4507/08/2026
New York City Housing Authority1903/21/2026
Bushwick Gardens303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering702/17/2026
IMEG Consulting101/18/2024
Christopher Compton405/13/2022
Scalar Architecture109/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC803/21/2026
AE Design Solution203/21/2026
JM Zoning1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Procida ConstructionGeneral Contractor704/09/2026
J-J PlumbingPlumbing607/08/2026
SNB Electrical ContngElectrical103/22/2026
Interstate Restorationspecialty_contractor107/08/2026
?John SR MariElectrical103/21/2026
Procida ConstructionScaffold107/08/2026
G.M.A. Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106802/17/2026
Environmental Code Consulting5516405/13/2022
Building Lifecycle
09/17/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/02/2026
Signed off — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00961055-S4
05/22/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH…
HPD violation · closed
02/18/2026
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
103 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJ-J Plumbing06/06/2025
DOB NOWPlumbingSigned-offJ-J Plumbing06/06/2025
DOB NOWPlumbingSigned-offJ-J Plumbing04/09/2025
DOB NOWEarth WorkSigned-offProcida Construction04/08/2025
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing03/28/2025
DOB NOWStructuralSigned-offProcida Construction03/19/2025
DOB NOWMechanical SystemsSigned-offProcida Construction03/06/2025
DOB NOWPlumbingSigned-offJ-J Plumbing05/09/2024
DOB NOWGeneral ConstructionSigned-offProcida Construction05/08/2024
DOB NOWPlumbingSigned-offJ-J Plumbing04/08/2024
DOB NOWMechanical SystemsSigned-offProcida Construction04/05/2024
DOB NOWFoundationSigned-offProcida Construction04/03/2024
DOB NOWGeneral ConstructionSigned-offInterstate Restoration02/14/2022
DOB NOWBoiler EquipmentSigned-offG.M.A. Plumbing & Heating01/12/2022
DOB NOWConstruction FenceSigned-offProcida Construction09/19/2019
BISBLISSUEDJ-J Plumbing03/24/2022
BISPLISSUEDJ-J Plumbing03/24/2022
BISMHISSUEDProcida Construction04/26/2021
BISOTISSUEDProcida Construction04/26/2021
BISBLISSUEDJ-J Plumbing03/18/2021
BISPLISSUEDJ-J Plumbing03/18/2021
BISOTISSUEDProcida Construction05/04/2020
BISMHISSUEDProcida Construction05/04/2020
BISBLISSUEDJ-J Plumbing03/25/2020
BISOTISSUEDBright Power Installation03/20/2020
BISBLISSUEDJ-J Plumbing01/22/2020
BISPLISSUEDJ-J Plumbing10/02/2019
BISBLISSUEDJ-J Plumbing10/02/2019
BISOTISSUEDProcida Construction09/20/2019
BISMHISSUEDProcida Construction09/20/2019
BISBLISSUEDRJ Bruno03/04/2019
BISPLISSUEDRJ Bruno03/04/2019
1 project · most recent 02/17/2026
Heating Systems
FiledStatusContractorScope
02/17/2026Signed-offProcida ConstructionHeating Systems
1 project · most recent 02/17/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
02/17/2026Signed-offJ-J PlumbingGas, Plumbing-Sprinkler, Storm, Water/Sanitary
4 projects · most recent 06/29/2024
General Wiring
FiledStatusContractorScope
06/29/2024Permit IssuedSNB Electrical ContngGeneral Wiring
03/13/2020CompleteVenture Home Solar—
03/02/2020CompleteMonte Electric Co—
10/04/2019Permit IssuedE & M Electrical NYGeneral Wiring
1 project · most recent 02/17/2026
FiledStatusContractorScope
02/17/2026Signed-offJ-J Plumbing—
1 project · most recent 02/17/2026
Earthwork Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/17/2026Signed-offJ-J PlumbingEarthwork, Tenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/02/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/29/2024Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/13/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
02/18/2026Sprinkler SystemsGEORGE GHEBRYALspecial
02/18/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/18/2026Tenant Protection Plan Compliance—special
10/02/2025Tenant Protection Plan Compliance—special
10/02/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/02/2025Post-installed AnchorsGEORGE GHEBRYALspecial
10/02/2025Sprinkler SystemsGEORGE GHEBRYALspecial
12/08/2023MeteringGEORGE GHEBRYALenergy_progress
12/08/2023Shutoff dampersGEORGE GHEBRYALenergy_progress
12/08/2023Maintenance informationGEORGE GHEBRYALenergy_progress
12/08/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
12/08/2023Heating SystemsGEORGE GHEBRYALspecial
12/08/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
12/08/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
12/08/2023HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
12/08/2023HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
12/08/2023HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
12/08/2023Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
12/08/2023Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
12/08/2023Subgrade InspectionsGEORGE GHEBRYALspecial
12/08/2023Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
12/08/2023Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
12/08/2023Subsurface Investigations (Borings/Test Pits)Gregory Pillorispecial
12/08/2023Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
11/10/2023FinalGEORGE GHEBRYALprogress
Latest 25 of 32.
202 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account