← Back
Large suburban residence
670 WEST 261 STREET
BRONX · Riverdale-Spuyten Duyvil · BIN 2086337
💬 Discuss this project
1927Year Built
2.5Stories
A3Building Class
R1-2Zoning
2,244 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 19,115 sf lot · 0.12 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof13p · 1 filing · 13 docs
Attic11p · 1 filing · 7 docs
Floor 342p · 4 filings · 20 docs
Floor 242p · 4 filings · 20 docs
Floor 142p · 4 filings · 20 docs
Cellar34p · 4 filings · 20 docs
Site & exterior11p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FINE CRAFTSMAN GROUP703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAVID MCDONALD ARCHITECT303/20/2023
TAN ENGINEERING PC204/01/2022
STRUCTURAL ENGINEERING INTEGRATED302/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RELIABLE EXPEDITING503/21/2026
CASA GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FINE CRAFTSMAN GROUP LLCGeneral Contractor407/08/2026
CARPEX INCGeneral Contractor303/21/2026
TTM GROUP CORPFire Protection207/08/2026
TT MECHANICAL CORPPlumbing107/08/2026
TT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID MCDONALD ARCHITECT3239303/20/2023
TAN ENGINEERING, P.C.1291204/01/2022
STRUCT. ENGINEERING INTEG4174302/11/2022
Building Lifecycle
All (66)Filed (8)Permit Issued (7)Signed Off (5)Violation (9)Inspection (7)Special Inspection (30)
05/22/2024
Signed off — Alteration
REMOVE EXISTING KITCHENS & BATHROOMS; INSTALL NEW LAUNDRY, CELLAR TOILET, 2-BFP'S, FIRE SERVICE, 2-COMBI-BOILERS, HW STORAGE TANK, KITCHEN & BATHROOM FIXTURES IN CONNECTION WITH JOB #240294249
X00475677-I1
07/21/2023
Signed off — Alteration
X00579136-I1
07/10/2023
Signed off — Alteration
X00475646-I1
03/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
David McDonald
03/21/2023
Special inspection requirement — Metering
David McDonald
03/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
David McDonald
03/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
David McDonald
03/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
David McDonald
03/21/2023
Special inspection requirement — Maintenance information
David McDonald
03/21/2023
Special inspection requirement — Energy Code Compliance Inspections
David McDonald
03/20/2023
Filed — Alteration
REMOVE EXISTING KITCHENS & BATHROOMS; INSTALL NEW LAUNDRY, CELLAR TOILET, 2-BFP'S, FIRE SERVICE, 2-COMBI-BOILERS, HW STORAGE TANK, KITCHEN & BATHROOM FIXTURES IN CONNECTION WITH JOB #240294249
X00475677-P2
03/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
David McDonald
03/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
David McDonald
03/20/2023
Special inspection requirement — Energy Code Compliance Inspections
David McDonald
03/20/2023
Special inspection requirement — Maintenance information
David McDonald
03/20/2023
Special inspection requirement — Metering
David McDonald
03/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
David McDonald
03/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
David McDonald
02/03/2023
Permit issued — Sprinklers
X00579136-I1-EW-SP
12/12/2022
Filed — Alteration
REMOVE EXISTING KITCHENS & BATHROOMS; INSTALL NEW LAUNDRY, CELLAR TOILET, 2-BFP'S, FIRE SERVICE, 2-COMBI-BOILERS, HW STORAGE TANK, KITCHEN & BATHROOM FIXTURES IN CONNECTION WITH JOB #240294249
X00475677-P1
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
David McDonald
11/28/2022
Special inspection requirement — Metering
David McDonald
11/28/2022
Special inspection requirement — Maintenance information
David McDonald
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
David McDonald
11/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
David McDonald
11/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
David McDonald
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
David McDonald
11/17/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2022
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
11/09/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2022
Signed off — Alteration
CONSTRUCT VERTICAL ENLARGEMENT WITH INTERIOR ALTERATIONS TO EXISTING SINGLE FAMILY DWELLING IN CONJUNCTION WITH ALT1 240294249.
X00575075-I1
09/19/2022
Signed off — Alteration
X00575122-I1
08/24/2022
Permit issued — Sprinklers
X00579136-I1-EW-SP
08/09/2022
Permit issued — Mechanical Systems
X00475646-I1-MS
04/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/13/2022
Permit issued — Plumbing
X00475677-I1-PL
04/01/2022
Filed — Alteration
X00475646-I1
03/11/2022
Special inspection requirement — Maintenance information
Roger Tan
03/11/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
03/11/2022
Special inspection requirement — Shutoff dampers
Roger Tan
03/09/2022
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
03/09/2022
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
02/11/2022
Filed — Alteration
CONSTRUCT VERTICAL ENLARGEMENT WITH INTERIOR ALTERATIONS TO EXISTING SINGLE FAMILY DWELLING IN CONJUNCTION WITH ALT1 240294249.
X00575075-P1
02/10/2022
Special inspection requirement — Structural Cold-Formed Steel
Chris Yiu
02/10/2022
Special inspection requirement — Post-installed Anchors
Chris Yiu
02/10/2022
Special inspection requirement — Structural Steel - Details
Chris Yiu
02/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chris Yiu
01/04/2022
Violation issued (ECB, closed)
Construction
01/04/2022
Violation issued (ECB, closed)
Construction
01/04/2022
Violation issued (ECB, closed)
Construction
01/04/2022
Violation issued (ECB, closed)
Construction
10/15/2021
Filed — Alteration
X00579136-I1
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/09/2021
Permit issued — Foundation
X00575122-I1-FO
09/03/2021
Permit issued — Structural
X00575075-I1-ST
08/25/2021
Filed — Alteration
CONSTRUCT VERTICAL ENLARGEMENT WITH INTERIOR ALTERATIONS TO EXISTING SINGLE FAMILY DWELLING IN CONJUNCTION WITH ALT1 240294249.
X00575075-I1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offTTM GROUP CORP02/03/2023
DOB NOWSprinklersSigned-offTTM GROUP CORP08/24/2022
DOB NOWMechanical SystemsSigned-offCARPEX INC08/09/2022
DOB NOWPlumbingSigned-offTT MECHANICAL CORP04/13/2022
DOB NOWFoundationSigned-offFINE CRAFTSMAN GROUP LLC09/09/2021
DOB NOWStructuralSigned-offFINE CRAFTSMAN GROUP LLC09/03/2021
DOB NOWPlumbingSigned-offRENTOM GROUP CORP06/29/2021
BIS—ISSUEDFINE CRAFTSMAN GROUP LLC01/31/2022
1 project · most recent 09/01/2023
General Wiring
FiledStatusContractorScope
09/01/2023CompleteBERGER QUALITY ELEC'L CONGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2022Pass-Final SP - Up to 9 Requested FloorsPassView ↗
11/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
03/21/2023HVAC-R and service water heating equipmentDavid McDonaldenergy_progress
03/21/2023MeteringDavid McDonaldenergy_progress
03/21/2023HVAC-R and service water piping design and insulationDavid McDonaldenergy_progress
03/21/2023Fire-Resistant Penetrations and JointsDavid McDonaldspecial
03/21/2023HVAC-R and service water heating system controlsDavid McDonaldenergy_progress
03/21/2023Maintenance informationDavid McDonaldenergy_progress
03/21/2023Energy Code Compliance InspectionsDavid McDonaldprogress
03/20/2023HVAC-R and service water piping design and insulationDavid McDonaldenergy_progress
03/20/2023Fire-Resistant Penetrations and JointsDavid McDonaldspecial
03/20/2023Energy Code Compliance InspectionsDavid McDonaldprogress
03/20/2023Maintenance informationDavid McDonaldenergy_progress
03/20/2023MeteringDavid McDonaldenergy_progress
03/20/2023HVAC-R and service water heating system controlsDavid McDonaldenergy_progress
03/20/2023HVAC-R and service water heating equipmentDavid McDonaldenergy_progress
11/28/2022Fire-Resistant Penetrations and JointsDavid McDonaldspecial
11/28/2022MeteringDavid McDonaldenergy_progress
11/28/2022Maintenance informationDavid McDonaldenergy_progress
11/28/2022HVAC-R and service water heating equipmentDavid McDonaldenergy_progress
11/28/2022HVAC-R and service water heating system controlsDavid McDonaldenergy_progress
11/28/2022HVAC-R and service water piping design and insulationDavid McDonaldenergy_progress
11/28/2022Energy Code Compliance InspectionsDavid McDonaldprogress
03/11/2022Maintenance informationRoger Tanenergy_progress
03/11/2022HVAC-R and service water piping design and insulationRoger Tanenergy_progress
03/11/2022Shutoff dampersRoger Tanenergy_progress
03/09/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
Latest 25 of 35.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
08/25/2026X00575122-I1Request digital key ↗
08/25/2026X00575075-I1Request digital key ↗
08/25/2026X00575075-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/23/2026X00475677-P2Request digital key ↗
08/23/2026X00475677-P1Request digital key ↗
08/23/2026X00475677-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/24/2026X00475646-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
04/29/2021240294249Open ↗
04/13/2021240294249Open ↗
04/12/2021240294249Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
06/11/2021240294249Open ↗
06/11/2021240294249Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/31/2024240294249Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
04/29/2021240294249Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
04/29/2021240294249Open ↗
▸BISZONING DIAGRAM1
04/29/2021240294249Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
04/29/2021240294249Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature21
09/25/2026X00475677-P2Open ↗
09/25/2026X00475677-P2Open ↗
09/25/2026X00475677-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/25/2026X00475677-P2Open ↗
09/18/2026X00575075-P1Open ↗
09/18/2026X00575075-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026X00575122-I1Open ↗
08/25/2026X00575075-I1Open ↗
08/25/2026X00575075-P1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/29/2021240294249Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/07/2021240294249Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
04/29/2021240294249Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026X00575122-I1Open ↗
08/25/2026X00575075-P1Open ↗
08/25/2026X00575075-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/29/2021240294249Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/30/2024240294249Open ↗
05/30/2024240294249Open ↗
06/09/2021240294249Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00475646-I1Open ↗
08/13/2026X00475677-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/30/2024240294249Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/12/2024240294249Open ↗
▸BISFENESTRATION AREAS1
06/12/2024240294249Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/12/2024240294249Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/12/2024240294249Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/12/2024240294249Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
06/12/2024240294249Open ↗
▸BISFENESTRATION AIR LEAKAGE1
06/12/2024240294249Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/30/2024240294249Open ↗
05/30/2024240294249Open ↗
06/09/2021240294249Open ↗
Showing 3 of 5 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
07/05/2024240294249Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
06/12/2024240294249Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/12/2024240294249Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/12/2024240294249Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
06/12/2024240294249Open ↗
▸BISMASONRY1
06/12/2024240294249Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
06/12/2024240294249Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
06/12/2024240294249Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00575122-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00575122-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X00575122-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE4
04/13/2021240294249Open ↗
04/12/2021240294249Open ↗
03/11/2021240294249Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/29/2021240294249Open ↗
04/29/2021240294249Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
04/29/2021240294249Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/12/2024240294249Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
04/29/2021240294249Open ↗
▸Other Documents4
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
06/12/2024240294249Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
04/29/2021240294249Open ↗
▸BISPERMANENT CERTIFICATE1
06/12/2024240294249Open ↗
▸DOB NOWPlot Diagram1
08/13/2026X00575122-I1Open ↗