Condo, commercial tower (mixed-use) [derived]
6702 FT HAMILTON PARKWAY
BROOKLYN · Dyker Heights · BIN 3142708
💬 Discuss this project
2001Year Built
1Stories
RCBuilding Class
R6BZoning
25,872 sfGross Floor Area
4Units
LL97 Covered33 Open Violations ▸FDNY Report ↗
Condo, commercial tower (mixed-use) [derived] · 13,693 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof6p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WHARTON PROPERTIES1907/08/2026
SUNNY 332007/08/2026
CVS STORES 6702 FT HAMILT203/22/2026
TO THE OWNER OF 6718 FORT103/22/2026
THE OWNER OF 6718 FT HAMI103/22/2026
DV REALTY1403/22/2026
OWNER OF 6718 FORT HAMILT103/22/2026
CVS REALTY CO.103/21/2026
6702 FORT HAMILTON403/21/2026
WHATON REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MASSA MULTIMEDIA ARCHITECTS204/22/2026
DJM CONSULTING ENGINEERING204/22/2026
ZHENG & ASSOCIATES LLC609/13/2021
CONCEPT DESIGN GROUP209/13/2019
LEON SKVIRSKY PE509/06/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONCEPT DESIGN GROUP203/21/2026
BUILDING BROTHERS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DPH PLUMBING & HTG CORPPlumbing607/08/2026
ULTIMATE SIGNS DESIGNSScaffold507/08/2026
J CAIAZZO PLUMBING & HEATGeneral Contractor303/21/2026
YX CONSTRUCTION INCGeneral Contractor307/08/2026
HOWARD ZAMKOFFElectrical203/21/2026
MELITO CONSTRUCTION CORPGeneral Contractor207/11/2026
J. CAIAZZO PLBG & HTG CORPlumbing207/08/2026
SUK KIMElectrical103/21/2026
ALEXANDER LEVINElectrical103/21/2026
HP SERVICES INCPlumbing107/08/2026
STALWART PLUMBING CORPPlumbing108/07/2026
?SUK YOUNG KIMElectrical103/21/2026
FRANCIS CAPORALEElectrical103/21/2026
FRANK TURANOElectrical103/21/2026
GENOVESE, JOSEPHElectrical103/21/2026
GMD SHIPYARD CORPElectrical103/21/2026
LEVIN ALEXANDERElectrical103/21/2026
MANUEL BOTEROElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC6942404/22/2026
OBAID MIAN849104/22/2026
ZHENG & ASSOCIATES LLC7330609/13/2021
CDG ARCHITECTS LLC /DBA:1327109/13/2019
Building Lifecycle
All (114)Filed (17)Permit Issued (14)Signed Off (8)Violation (44)Inspection (1)Special Inspection (30)
09/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2026
Permit issued — Plumbing
B01368936-S2-PL
07/10/2026
Permit issued — General Construction
B01368936-I1-GC
07/10/2026
Permit issued — Mechanical Systems
B01368936-S1-MS
04/23/2026
Special inspection requirement — Final
gabriel massa
04/23/2026
Special inspection requirement — Lighting controls
Obaid Mian
04/23/2026
Special inspection requirement — Interior lighting power
Obaid Mian
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/22/2026
Filed — Alteration
Interior work in existing CVS Pharmacy to enlarge pharmacy department. Modify non-load bearing metal stud gyp bd walls, pharmacy millwork/equipment floor/wall finishes, relo and new lights. No change to existing exits, egress, use or occupancy.
B01368936-S2
04/22/2026
Filed — Alteration
Interior work in existing CVS Pharmacy to enlarge pharmacy department. Modify non-load bearing metal stud gyp bd walls, pharmacy millwork/equipment floor/wall finishes, relo and new lights. No change to existing exits, egress, use or occupancy.
B01368936-S1
04/22/2026
Filed — Alteration
Interior work in existing CVS Pharmacy to enlarge pharmacy department. Modify non-load bearing metal stud gyp bd walls, pharmacy millwork/equipment floor/wall finishes, relo and new lights. No change to existing exits, egress, use or occupancy.
B01368936-P1
04/21/2026
Special inspection requirement — Lighting controls
Obaid Mian
04/21/2026
Special inspection requirement — Final
gabriel massa
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
04/21/2026
Special inspection requirement — Interior lighting power
Obaid Mian
03/27/2026
Filed — Alteration
Interior work in existing CVS Pharmacy to enlarge pharmacy department. Modify non-load bearing metal stud gyp bd walls, pharmacy millwork/equipment floor/wall finishes, relo and new lights. No change to existing exits, egress, use or occupancy.
B01368936-I1
03/08/2026
Special inspection requirement — Mechanical Systems
Obaid Mian
03/08/2026
Special inspection requirement — Final
Obaid Mian
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/11/2024
Violation issued (ECB, open)
Unknown
05/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/14/2023
Permit issued — Plumbing
B00227588-I1-PL
12/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/21/2023
Violation issued (ECB, open)
Unknown
11/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/2022
Violation issued (FDNY_ORDER, closed)
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/27/2022
Signed off — Alteration
INTERIOR RENOVATION AT RESTAURANT AS SHOWN ON PLAN @ PARTIAL FIRST FLOOR.
B00451690-I1
01/27/2022
Signed off — Alteration
B00451509-I1
01/27/2022
Signed off — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ PARTIAL FIRST FLOOR RESTAURANT.
B00451762-I1
12/08/2021
Violation issued (FDNY_NOV, closed)
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/15/2021
Special inspection requirement — Lighting controls
Jinfar Liu
09/15/2021
Special inspection requirement — Metering
Jinfar Liu
09/15/2021
Special inspection requirement — Interior lighting power
Jinfar Liu
09/15/2021
Special inspection requirement — Electrical motors and elevators
Jinfar Liu
09/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
09/15/2021
Special inspection requirement — Final
Jinfar Liu
09/15/2021
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
09/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
09/14/2021
Special inspection requirement — Metering
Jinfar Liu
09/14/2021
Special inspection requirement — Electrical motors and elevators
Jinfar Liu
09/14/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
09/13/2021
Filed — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ PARTIAL FIRST FLOOR RESTAURANT.
B00451762-P3
09/13/2021
Filed — Alteration
INTERIOR RENOVATION AT RESTAURANT AS SHOWN ON PLAN @ PARTIAL FIRST FLOOR.
B00451690-P1
09/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
09/07/2021
Special inspection requirement — Final
Jinfar Liu
09/07/2021
Special inspection requirement — Interior lighting power
Jinfar Liu
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSTALWART PLUMBING CORP08/06/2026
DOB NOWGeneral ConstructionPermit IssuedMELITO CONSTRUCTION CORP07/10/2026
DOB NOWMechanical SystemsPermit IssuedMELITO CONSTRUCTION CORP07/10/2026
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR12/14/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP04/13/2021
DOB NOWPlumbingSigned-offHP SERVICES INC02/11/2021
DOB NOWGeneral ConstructionSigned-offYX CONSTRUCTION INC01/19/2021
DOB NOWMechanical SystemsPermit IssuedJ CAIAZZO PLUMBING & HEAT09/16/2019
DOB NOWPlumbingPermit IssuedJ. CAIAZZO PLBG & HTG COR09/16/2019
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO09/18/2018
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO09/18/2018
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO09/18/2018
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO09/18/2018
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO09/18/2018
BISOTISSUEDMARCUS LZ CORPORATION06/21/2019
BISFPISSUEDMETFLOW FIRE CONTROL LLC05/09/2019
BISPLISSUEDS & L PLUMBING INC04/18/2019
BISMHISSUEDKTC DESIGN GROUP INC03/27/2019
BISPLISSUEDRRP PLUMBING CORP01/16/2019
BISOTISSUEDHONGTAI CONSTRUCTION INC12/17/2018
BISMHISSUEDIHOME IMPROVEMENT & WINDO06/16/2016
BISPLISSUEDCAM ENERGY HEATING AND ME06/16/2016
BISPLISSUEDTOP PLUMBING GROUP,INC05/10/2016
BISMHISSUEDIHOME IMPROVEMENT & WINDO05/05/2016
BISOTISSUEDURBAN GC INC04/27/2016
BISEQISSUEDURBAN GC INC04/27/2016
BISFPISSUEDFIRE COMMAND CO, INC08/09/2013
BISOTISSUEDREGIONAL CONSTRUCTION SVC07/02/2010
BISOTISSUEDREGIONAL CONSTRUCTION SVC07/02/2010
BISMHISSUEDJOHNSON CONTROLS INC05/07/2008
BIS—ISSUEDBERGER SIGNS INC02/01/2007
BIS—ISSUEDBERGER SIGNS INC02/01/2007
BISFPISSUEDIDEAL FIRE SYSTEMS, INC07/01/2003
BISPLISSUEDA-1 WATER MAIN & SEWER06/01/2001
BISMHISSUEDBUDGET04/06/2001
BISOTISSUEDCALCO BROTHERS CONST CO INC03/01/2001
BISOTISSUEDCALCO BROTHERS CONST CO INC03/01/2001
BIS—ISSUEDMAUCERI SIGN CO., INC04/03/2000
BIS—ISSUEDMAUCERI SIGN CO., INC03/31/2000
BIS—ISSUEDMAUCERI SIGN CO., INC03/31/2000
+ 14 more permits on file
1 project · most recent 04/22/2026
Water/Sanitary
FiledStatusContractorScope
04/22/2026Signed-offSTALWART PLUMBING CORPWater/Sanitary
7 projects · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026Permit IssuedC.M. RICHEY ELEC'L CONTRGeneral Wiring
03/17/2025CompleteICONIC ELECTRIC CORPGeneral Wiring
07/30/2023CompleteMLB ELECTRICAL CORPGeneral Wiring
02/07/2020Permit IssuedMERIT ELECTRICAL CORP.General Wiring
01/17/2019CompleteKJK ELECTRIC INCGeneral Wiring
10/03/2018CompleteULTIMATE SIGNS & ELEC COR—
09/12/2018CompleteULTIMATE SIGNS & ELEC COR—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
04/23/2026Finalgabriel massaprogress
04/23/2026Lighting controlsObaid Mianenergy_progress
04/23/2026Interior lighting powerObaid Mianenergy_progress
04/23/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
04/21/2026Lighting controlsObaid Mianenergy_progress
04/21/2026Finalgabriel massaprogress
04/21/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
04/21/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
04/21/2026Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
04/21/2026Interior lighting powerObaid Mianenergy_progress
03/08/2026Mechanical SystemsObaid Mianspecial
03/08/2026FinalObaid Mianprogress
09/15/2021Lighting controlsJinfar Liuenergy_progress
09/15/2021MeteringJinfar Liuenergy_progress
09/15/2021Interior lighting powerJinfar Liuenergy_progress
09/15/2021Electrical motors and elevatorsJinfar Liuenergy_progress
09/15/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
09/15/2021FinalJinfar Liuprogress
09/15/2021Lighting in dwelling unitsJinfar Liuenergy_progress
09/14/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
09/14/2021MeteringJinfar Liuenergy_progress
09/14/2021Electrical motors and elevatorsJinfar Liuenergy_progress
09/14/2021Energy Code Compliance InspectionsJinfar Liuprogress
09/07/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
09/07/2021FinalJinfar Liuprogress
Latest 25 of 38.
▾Documents — 230 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch9
09/02/2026B00071489-I1Request digital key ↗
09/02/2026B00071496-I1Request digital key ↗
09/02/2026B00071514-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00227588-I1Request digital key ↗
09/01/2026B00451762-P1Request digital key ↗
09/01/2026B00451762-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00451690-I1Request digital key ↗
09/01/2026B00451690-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00227587-I1Request digital key ↗
09/01/2026B00451509-I1Request digital key ↗
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION16
06/25/2019321970104Open ↗
05/14/2019321953668Open ↗
04/18/2019321937106Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
09/11/2019321937106Open ↗
06/25/2019321970104Open ↗
04/29/2019321953668Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/11/2019322064591Open ↗
▸Seals & Professional Certifications98
▸DOB NOWProgress Inspector Seal & Signature28
09/21/2026B00451762-P3Open ↗
09/21/2026B00451762-P3Open ↗
09/21/2026B00451762-P3Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
08/05/2019321970104Open ↗
07/29/2019321970104Open ↗
07/29/2019321970104Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/02/2026B00071489-I1Open ↗
09/02/2026B00071496-I1Open ↗
09/02/2026B00071514-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/21/2026B00451762-P3Open ↗
09/01/2026B00451762-P1Open ↗
08/31/2026B00451762-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
06/25/2019321970104Open ↗
04/29/2019321953668Open ↗
03/26/2019321937106Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/25/2019321970104Open ↗
04/29/2019321953668Open ↗
03/26/2019321937106Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
11/26/2010320244473Open ↗
06/18/2010320176705Open ↗
08/20/2007310009816Open ↗
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY1
08/20/2007310009816Open ↗
▸BISPC FULL REPORT1
08/20/2007310009816Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/11/2019321937106Open ↗
03/26/2019321937106Open ↗
12/18/2018322064591Open ↗
▸BISEQUIPMENT USE PERMITS1
06/11/2008310009816Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/11/2008310009816Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/13/2019321953668Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
04/29/2019321953668Open ↗
03/26/2019321937106Open ↗
▸BISSTREET TREE CHECKLIST1
06/18/2010320176705Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00451509-I1Open ↗
09/01/2026B00451690-I1Open ↗
09/01/2026B00451690-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
06/25/2019321970104Open ↗
03/26/2019321937106Open ↗
05/06/2016321319319Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/26/2010320244473Open ↗
08/20/2007310009816Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/18/2010320176705Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
08/05/2019321970104Open ↗
06/25/2019321970104Open ↗
03/26/2019321937106Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00451762-I1Open ↗
08/13/2026B00451509-I1Open ↗
08/13/2026B00451690-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
07/29/2019321970104Open ↗
02/27/2019322064591Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
08/13/2019321953668Open ↗
08/05/2019321970104Open ↗
07/29/2019321970104Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
05/06/2016321319319Open ↗
07/12/2013320787172Open ↗
11/26/2010320244473Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/29/2019321970104Open ↗
01/27/2011320176705Open ↗
▸BISSUPERSEDING LETTER1
06/17/2016321319319Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
08/13/2019321953668Open ↗
07/29/2019321970104Open ↗
06/25/2019321970104Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET10
06/27/2019321970104Open ↗
04/29/2019321953668Open ↗
03/26/2019321937106Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM4
08/13/2019321953668Open ↗
08/05/2019321970104Open ↗
07/29/2019321970104Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
09/11/2019321937106Open ↗
02/14/2019322064591Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/30/2019321937106Open ↗